• No results found

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

N/A
N/A
Protected

Academic year: 2021

Share "Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage."

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

Workpackages

This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

CODE TITLE

03.00 Global Co-ordination and Management 03.01 Validation Infrastructure Requirements Definition 03.01.01 Validation and Verification Needs

03.01.02 Tools and Analysis Support 03.01.03 V&V Platform System Requirements 03.02 Validation Infrastructure Analysis 03.02.01 IBPs & Tools Baseline Documentation 03.02.02 IBPs Use Planning

03.03 Tools Development and Acceptance 03.03.01 V&V Platform architecture and specifications 03.03.02 V&V Platform Development

03.03.03 V&V Platform acceptance and support 04.00 Global co-ordination & management

04.02 Consolidation of operational concept definition and validation including operating mode and air-ground task sharing. 04.03 Integrated and pre-operational validation & cross validation

04.05 Trajectory management framework in En route 04.07 En route trajectory and separation management 04.07.01 Complexity Management in En Route

04.07.02 Separation Task in En Route Trajectory based environment

04.07.03 Use of Performance Based Navigation (PBN) for En Route Separation Purposes 04.07.04.a ATSA-ITP Pioneer Trials

04.07.04.b ASAS-ASEP Oceanic Applications 04.07.05 Self Separation in Mixed Mode Environment

04.07.06 En Route Trajectory and Separation Management - ASAS Separation (Cooperative Separation) 04.07.07 Implementation of the Dynamic Capacity Management in a high density area

04.07.08 Controller Team Organisation, roles and responsibilities in a trajectory based operation within En-route airspace (including multi-sector planner) 04.08 En Route and TMA ground and airborne safety nets

04.08.01 Evolution of Ground Based Safety Nets 04.08.02 Evolution of Airborne Safety Nets 04.08.03 Ground-Airborne Safety Net Compatibility 04.08.04 CNS/ATM Services for General Aviation 05.00 Global Coordination and Management

05.02 Consolidation of Operational Concept Definition and Validation 05.03 Integrated and Pre-Operational Validation & Cross Validation 05.04 TMA and En-route co-operative Planning

05.04.01 TMA-1 Co-operative Planning in the TMA

05.04.02 TMA-2 Co-Operative Planning Requirements and Validation 05.05 TMA Trajectory Management Framework

05.05.01 Trajectory Management Framework in TMA

05.05.02 Improved Airline Flight Plan Information into ATC Trajectory Prediction (TP) Tools 05.06 Queue Management in TMA and En-route

05.06.01 QM1 - Ground and Airborne Capabilities to Implement Sequence 05.06.02 QM-2 - Improving Vertical Profile

05.06.03 QM-3 - Approach Procedure with Vertical Guidance (APV) 05.06.04 QM-4 - Tactical TMA and En-route Queue Management 05.06.05 QM-5 - NOP Maintenance and Transition Queue Management 05.06.06 QM-6 - ASAS Sequencing and Merging (TMA-8)

05.06.07 QM-7 - Integrated Sequence Building/Optimisation of Queues 05.07 TMA Trajectory and Separation Management

05.07.02 Development of 4D Trajectory-Based Operations for separation management using RNAV/PRNAV

05.07.03 Controller Team Organisation, Roles and Responsibilities in a Trajectory Based Operation (including Multi-Sector Planner) 05.07.04 Full Implementation of PRNAV in TMA

(2)

06.00 Global Co-ordination & Management

06.02 Coordination and consolidation of operational concept definition and validation 06.03 Integrated and pre-validation

06.03.01 The Airport in the ATM environment 06.03.02 Airport ATM performance (execution phase) 06.03.03 Full integration of airport planning and execution 06.05 Collaborative airport planning

06.05.01 Airport Operations Plan Definition 06.05.02 Airport Operations Plan Validation 06.05.03 Airport Capacity and Flow Management 06.05.04 AirPort Operations Centre (APOC) definition 06.05.05 Integration of MET Data into APOC processes 06.06 Airport CDM

06.06.01 Operations in adverse weather and/or exceptional operating conditions/recovery management 06.06.02 Integration of airport - airline/ground handlers - ATC processes (incl. turnaround) in ATM 06.07 Surface management

06.07.01 Airport safety support tolls for pilots, vehicle drivers and controllers 06.07.02 A-SMGCS Routing and planning functions

06.07.03 A-SMGCS Guidance Function 06.08 Runway management

06.08.01 Flexible and Dynamic Use of Wake Vortex Separations 06.08.02 Brake to vacate

06.08.03 Separation minima reductions across flight phases 06.08.04 Coupled AMAN-DMAN

06.08.05 GBAS operational implementation

06.08.07 Improved weather resilience - re-classify criteria for Low Visibility Procedures (LVP) 06.09 Tower management & CWP

06.09.02 Advanced integrated CWP (A-iCWP) 06.09.03 Remote & virtual TWR

07.02 Co-ordination and Consolidation of Concept Definition and Validation 07.03 Integrated and Pre-Operational Validation

07.03.01 AOM and DCB Integrated Process 07.03.02 Integrated Network CDM

07.05 Airspace Organisation & Management 07.05.02 Advanced Flexible Use of Airspace 07.05.03 User Preferred Routing 07.05.04 Dynamic Airspace Configurations

07.06 Business/Mission Trajectory Management & Demand Capacity Balancing 07.06.01 Collaborative NOP

07.06.02 Business/Mission Trajectory Management 07.06.03 DCB/ASM Scenarios Management 07.06.04 UDPP

07.06.05 Dynamic DCB 07.07 Transition Scenarios

08.00 Global Co-ordination and Management 08.01 Information Models Development

08.01.01 Operational Requirements & Demands concerning organisation of the ATM information Management within the Scope of the European ATM Enterprise Architecture 08.01.03 AIRM Deliverable

08.01.04 Aeronautical information (AIS Airport Manning, Airport Network, Terrain and Obstacles 08.01.05 Information modelling Flow & Demand & Capacity Domain

08.01.06 Information Modelling Meteorological Domain 08.01.07 Information Modelling Surveillance Domain 08.01.08 Information Modelling Environment Domain 08.01.09 Information Modelling Flight Data Domain 08.01.10 Information Modelling Airport Domain 08.01.11 Information Modelling Other Domains 08.03 Information Service Models Development

(3)

08.03.02 Operational ATM Requirements and Demands concerning ATM Information Catalogue & Registry Services 08.03.03 Identify and Develop Aeronautical Information ATM Services

08.03.04 Identify and Develop ATC Operators (En Route and TMA) Information Services 08.03.05 Identify and Develop European ATM Network and Sub-regional (FAB) Information Services 08.03.06 Identify and Develop Airport Operators ATM Information Services

08.03.07 Identify and Develop AIRSPACE USERS (incl. AOC) ATM Information Services 08.03.10 Information Service Modelling deliverables

09.00 Global Co-ordination and Management 09.01 Airborne Initial 4D Trafectory Management

09.02 Airborne Full 4D Trajectory Management & 4D contract capability 09.03 Interoperability of Business Trajectory and Mission Trajectory 09.05 ASA-ASPA

09.06 ASAS-ASEP

09.09 RNP Transition to xLS (x = G I M) 09.10 Approach with Vertical Guidance APV 09.11 Aircraft Systems for Wake Encounter Alleviation 09.12 GBAS Cat II/III

09.13 Airport Surface Taxi Clearances 09.14 Airport Surface Alerts (ownership and traffic) 09.16 New Communication Technology at Airport 09.19 SWIM Air-Ground Capability

09.20 Military Data Link Accommodation 09.21 ADS-B - 1090 Higher Performance Study 09.22 Mid & Full ADS-B Capability - Research 09.24 ADS-B In/Out for military aircraft

09.27 Multi-constellation GNSS Airborne navigation Systems 09.28 Enhanced Vision (Head Down and Head Up) Solutions 09.29 Enhanced & Synthetic Vision

09.30 Weather Hazards / Wake Vortex Sensor 09.31 Aeronautical databases

09.33 ATS Datalink Operational Improvements 09.38 ASAS - SSEP

09.39 Continuous Climbing Cruise

09.40 Long-term CDA & Steeper Approach Airborne Architecture 09.44 Flexible Communication Avionics

09.47 TCAS Evolution

09.48 AIS/MET Services & Data Distribution

09.49 Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap 10.00 Global Coordination and Management

10.01 ATC System and Supervision Definition 10.01.07 ATC System Specification

10.01.09 ATC System Supervision 10.02 Trajectory Management 10.02.01 ATC Trajectory Management Design

10.02.02 Trajectory Management Exchange Formats Definition 10.02.03 ATC system support to RBT/MT Revision 10.02.05 Flight Object IOP System Requirement & Validation 10.03 Separtion Management

10.03.01 Handling free routing, new approach & departure procedures and mixed separation modes 10.03.02 ATC Support to ASAS sequencing and merging operations

10.03.03 ATC support to ASAS in Trail Procedure (ITP) 10.03.08 ATC System support to Precision Trajectory Clearances 10.04 Controller Tools and Safety Nets

10.04.01 Enhanced Tools for Conflict Detection and Resolution 10.04.02 Precision Conformance Monitoring

10.04.03 Safety Nets adaptation to new modes of operation 10.04.04 Time Based Separation

10.05.01 System impact of the use of flexible, new types of, & restricted airspace 10.07.01 Enhanced Datalink Features for all phase of flight

(4)

10.08.01 Complexity Assessment and Resolution 10.09 Queue Management and route optimisation 10.09.01 Integration of Queue Management 10.09.02 Multiple airport arrival/departure management 10.09.04 CDA and CCD in high density traffic

10.10 iCWP Human Factors aspectis and User interface Design 10.10.02 iCWP Human Factors Design

10.10.03 iCWP Prototyping 11.02.01 Title to be completed 11.02.02 Title to be completed

12.00 Global Co-ordination and Management 12.01 Overall Airport Systems Specification

12.01.07 Airport Systems Specification drafting and maintenance 12.01.09 ATC Systems Supervision

12.02 Runway Management 12.02.01 Runway Management Tools

12.02.02 Runway Wake Vortex Detection, Prediction and decision support tools 12.03 Surface Management

12.03.01 Improved Surveillance for surface management 12.03.02 Enhanced Surface Safety Nets

12.03.03 Enhanced Surface Routing 12.03.04 Enhanced Surface Guidance 12.03.05 Enhanced Sequencing Tools 12.04 Tower Management and ATC 12.04.01 Baseline for airport controller tools 12.04.03 Enhanced FDPs at airports

12.04.04 Integration of Departure Management and Surface Management 12.04.06 Remotely Operated Tower Technology Enablers

12.04.07 Remotely Operated Tower Multiple Controlled Airports with Integrated Working Position 12.04.08 Remotely Operated Tower Technology used for Contingency and Enhanced Local Operations 12.04.09 3d Modelling for remote tower operations

12.04.10 Remotely Operated Tower Computer Augmented Dynamic Vision 12.05 Controller Working Position

12.05.02 Airport Safety Nets and wind-shear detection and alert for Controllers 12.05.03 Enhance Controller Tools to manage all aspects of 4D trajectories

12.05.04 Integrated Tower Working Position (iCWP) Design, Specification Prototyping and Test/Validation 12.05.05 iCWP Usability and Human Factors Engineering

12.05.07 Performance Based, Monitoring and Decision Support within the HMI of the iCWP 12.06 Airport CDM and Collaborative Planning

12.06.02 The Airport Operations Plan (AOP), decision support tools and conflict detection tools to be integrated in APOC for managing the overall performance of the Airport 12.06.03 Enhanced MET-systems with CDM

12.06.07 AMAN, SMAN, and DMAN fully integrated into CDM processes 12.06.08 Introduction of the UDPP and collaborative departure sequence 12.06.09 Integration of CDM in the SWIM environment

12.07 Airport Performance Assessment Systems

12.07.03 Airport Performance Assessment and Management Support Systems 12.07.05 Improved weather information systems

13.00 Global Co-ordination & Management 13.01 Network Systems Definition

13.01.01 Network Sub-Systems Definition & verification

13.01.04 Impact of new Roles & responsibilities on local/sub-regional/regional Network (Sub)-systems 13.02 Sub-system definition & verification

13.02.01 Network Planning sub-system definition

13.02.02 Aeronautical Information Management sub-system definition 13.02.03 Network Operations & Monitoring sub-system definition 13.02.04 Network Technical Sub-systems

14.00 Global Co-ordination & Management

(5)

14.01.01 SWIM SUIT FP6 project follow-up and alignment 14.01.02 Identification of Technology and services options 14.01.03 SWIM Design

14.01.04 Interface specification and Services Technical requirements 14.02 SWIM Test Platforms

14.02.01 SWIM Middleware 14.02.02 Swim Security solutions 14.02.03 SWIM technical supervision

14.02.09 SWIM Platform Development and Demonstration Delivery 14.04 SWIM Exploitation

15.00 Global Co-ordination & Management 15.01.06 Spectrum Management & Impact Assessment 15.02 Communications

15.02.04 Future Mobile data Link system definition 15.02.06 Future Mobile Satellite Communication 15.02.07 Airport Surface Datalink

15.02.08 Civil-Military Data Link Interoperability

15.02.10 Terrestrial communication infrastructure - SWIM backbone 15.03 Navigation

15.03.01 Navigation technologies specifications 15.03.02 Navigation Infrastructure Rationalisation 15.03.04 GNSS Baseline Study

15.03.05 Enhanced SBAS - GNSS Evolution for Aeronautic Aspects 15.03.06 GBAS Cat II/III L1 Approach

15.03.07 Multi GNSS CAT II/III GBAS 15.04 Surveillance

15.04.01 Surveillance infrastructure rationalisation study 15.04.03 ACAS Monitoring

15.04.05.a Surveillance ground system enhancements for ADS-B

15.04.05.b Surveillance ground system enhancements for ADS-B (Prototype development) 15.04.09.a Weather sensing technologies specifications

15.04.09.b Weather infrastructure requirements Study 15.04.09.c Ground Weather Monitoring System 16.00 Global Coordination and Management 16.01 Safety

16.01.01 Develop a top-down accident-incident model and a Safety Target Achievement Roadmap (STAR) (ex 16.1.1.1) 16.01.02 Ensuring ATM with SESAR is kept resilient (ex 16.1.1.9)

16.01.03 Develop techniques for Dynamic Risk Modelling (ex 16.1.1.11)

16.01.04 Develop the notion of 'proof of concept' for aircraft certification when introducing new concept of operations (ex 16.1.1.14) 16.02 ATM Security

16.02.01 ATM Security management - ATM Security Framework (ex 16.2.1.1) 16.02.02 ATM Security management - Security management tools (ex 16.2.1.3) 16.02.03 Security Risk assessment - Security risk assessment methodology (ex 16.2.3.1) 16.02.04 Security Risk assessment - Security validation process (ex 16.2.3.2) 16.02.05 Harmonised ATM Security best practices (ex 16.2.5.1)

16.03 Environmental sustainability

16.03.01 Development of the SESAR environmental validation framework (metrics, methods, models, tools) 16.03.02 Support to development of performance indicators

16.03.03 Develop framework to establish interdependencies vs. other performance areas 16.03.04 Options to Mitigate Future Environmental Risks to ATM System Capacity 16.03.07 Future regulatory scenarios and impacts

16.04 Human Performance Management System R&D

16.04.01 Evolution from ATM HF Case to a HP Case Methodology for SESAR (ex 16.5.1.1) 16.04.02 HP Tool Repository of SESAR standard HP methods and tools (ex 16.5.1.3)

16.04.03 Impacts of future systems and procedures on selection, training, competence and staffing requirements (ex 16.5.1.4) 16.04.04 Social and Cultural Factors impacting on SESAR Changes (ex 16.5.1.8)

16.05 Human performance in Automation support

16.05.01 Identification and integration of Automation Related Best Practices (ex 16.5.2.1) 16.05.02 Trade-off between planning and flexibility (ex 16.5.2.3)

(6)

16.05.03 Guidance for an effective information presentation (ex 16.5.2.6)

16.05.04 Selection and training requirements to work with automated decision and support tools (ex 16.5.2.8) 16.06 TA coordination and support function

16.06.01 Safety support and coordination function 16.06.02 Security support and coordination function 16.06.03 Environment support and coordination function 16.06.05 Human Performance support and coordination function 16.06.06 Business Case Maintenance, support and coordination B.00 Global Co-ordination and Management

B.01 Consolidation & Coordination of ATM Target Concept

B.04.01 Development & maintenance of the ATM performance and business aspects of the European ATM Enterprise Architecture B.04.02 Update and maintenance of the development of the Concept of Operations (CONOPS) and associated ATM Services B.04.03 Development of the high level logical system architecture (SOA) and the technical system architecture (SoS) B.05 Performance Analysis of ATM Target Concept

C.00 Global Co-ordination & Management C.01 Administrate ATM Master Plan Updates C.02 Deployment/Performance planning and reporting C.03 Maintain Standardisation and Regulatory Roadmaps E.01.01 ComplexWorld E.01.02 HALA! E.02.01 SUPEROPT E.02.02 NEWO E.02.03 STREAM E.02.04 ONBOARD E.02.05 ASHiCS E.02.06 POEM E.02.07 TESA E.02.08 MUFASA E.02.09 ADAHR E.02.10 MAREA E.02.11 C-SHARE E.02.12 COMPASS E.02.13 ALIAS E.02.14 CASSIOPEIA E.02.15 UTOPIA E.02.16 ZeFMaP E.02.17 SPAD E.02.18 ELSA

References

Related documents

Dissertation defense by end of Summer Term. Warning if no dissertation prospectus by beginning of fall semester. Warning if no prelim by beginning of fall semester. Probation

Therefore, we need to search for an algorithm, that will be deadlock-free and will be using not the shortest existing paths but the shortest possible paths that does not cause

  Studie  naar  praktijkverschillen  bij  electieve  chirurgische  ingrepen  in  België.  Information  diffusion  and  best  practice

Investors support long-term strategies when these are communicated using language that underscores the advent of the future (time-moving frame) as well as the capacity of the firm

Additionally, programs must employ equity-minded practitioners, or those practitioners who are aware that things like “power asymmetries” in our culture affect at-risk student