Workpackages
This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.
CODE TITLE
03.00 Global Co-ordination and Management 03.01 Validation Infrastructure Requirements Definition 03.01.01 Validation and Verification Needs
03.01.02 Tools and Analysis Support 03.01.03 V&V Platform System Requirements 03.02 Validation Infrastructure Analysis 03.02.01 IBPs & Tools Baseline Documentation 03.02.02 IBPs Use Planning
03.03 Tools Development and Acceptance 03.03.01 V&V Platform architecture and specifications 03.03.02 V&V Platform Development
03.03.03 V&V Platform acceptance and support 04.00 Global co-ordination & management
04.02 Consolidation of operational concept definition and validation including operating mode and air-ground task sharing. 04.03 Integrated and pre-operational validation & cross validation
04.05 Trajectory management framework in En route 04.07 En route trajectory and separation management 04.07.01 Complexity Management in En Route
04.07.02 Separation Task in En Route Trajectory based environment
04.07.03 Use of Performance Based Navigation (PBN) for En Route Separation Purposes 04.07.04.a ATSA-ITP Pioneer Trials
04.07.04.b ASAS-ASEP Oceanic Applications 04.07.05 Self Separation in Mixed Mode Environment
04.07.06 En Route Trajectory and Separation Management - ASAS Separation (Cooperative Separation) 04.07.07 Implementation of the Dynamic Capacity Management in a high density area
04.07.08 Controller Team Organisation, roles and responsibilities in a trajectory based operation within En-route airspace (including multi-sector planner) 04.08 En Route and TMA ground and airborne safety nets
04.08.01 Evolution of Ground Based Safety Nets 04.08.02 Evolution of Airborne Safety Nets 04.08.03 Ground-Airborne Safety Net Compatibility 04.08.04 CNS/ATM Services for General Aviation 05.00 Global Coordination and Management
05.02 Consolidation of Operational Concept Definition and Validation 05.03 Integrated and Pre-Operational Validation & Cross Validation 05.04 TMA and En-route co-operative Planning
05.04.01 TMA-1 Co-operative Planning in the TMA
05.04.02 TMA-2 Co-Operative Planning Requirements and Validation 05.05 TMA Trajectory Management Framework
05.05.01 Trajectory Management Framework in TMA
05.05.02 Improved Airline Flight Plan Information into ATC Trajectory Prediction (TP) Tools 05.06 Queue Management in TMA and En-route
05.06.01 QM1 - Ground and Airborne Capabilities to Implement Sequence 05.06.02 QM-2 - Improving Vertical Profile
05.06.03 QM-3 - Approach Procedure with Vertical Guidance (APV) 05.06.04 QM-4 - Tactical TMA and En-route Queue Management 05.06.05 QM-5 - NOP Maintenance and Transition Queue Management 05.06.06 QM-6 - ASAS Sequencing and Merging (TMA-8)
05.06.07 QM-7 - Integrated Sequence Building/Optimisation of Queues 05.07 TMA Trajectory and Separation Management
05.07.02 Development of 4D Trajectory-Based Operations for separation management using RNAV/PRNAV
05.07.03 Controller Team Organisation, Roles and Responsibilities in a Trajectory Based Operation (including Multi-Sector Planner) 05.07.04 Full Implementation of PRNAV in TMA
06.00 Global Co-ordination & Management
06.02 Coordination and consolidation of operational concept definition and validation 06.03 Integrated and pre-validation
06.03.01 The Airport in the ATM environment 06.03.02 Airport ATM performance (execution phase) 06.03.03 Full integration of airport planning and execution 06.05 Collaborative airport planning
06.05.01 Airport Operations Plan Definition 06.05.02 Airport Operations Plan Validation 06.05.03 Airport Capacity and Flow Management 06.05.04 AirPort Operations Centre (APOC) definition 06.05.05 Integration of MET Data into APOC processes 06.06 Airport CDM
06.06.01 Operations in adverse weather and/or exceptional operating conditions/recovery management 06.06.02 Integration of airport - airline/ground handlers - ATC processes (incl. turnaround) in ATM 06.07 Surface management
06.07.01 Airport safety support tolls for pilots, vehicle drivers and controllers 06.07.02 A-SMGCS Routing and planning functions
06.07.03 A-SMGCS Guidance Function 06.08 Runway management
06.08.01 Flexible and Dynamic Use of Wake Vortex Separations 06.08.02 Brake to vacate
06.08.03 Separation minima reductions across flight phases 06.08.04 Coupled AMAN-DMAN
06.08.05 GBAS operational implementation
06.08.07 Improved weather resilience - re-classify criteria for Low Visibility Procedures (LVP) 06.09 Tower management & CWP
06.09.02 Advanced integrated CWP (A-iCWP) 06.09.03 Remote & virtual TWR
07.02 Co-ordination and Consolidation of Concept Definition and Validation 07.03 Integrated and Pre-Operational Validation
07.03.01 AOM and DCB Integrated Process 07.03.02 Integrated Network CDM
07.05 Airspace Organisation & Management 07.05.02 Advanced Flexible Use of Airspace 07.05.03 User Preferred Routing 07.05.04 Dynamic Airspace Configurations
07.06 Business/Mission Trajectory Management & Demand Capacity Balancing 07.06.01 Collaborative NOP
07.06.02 Business/Mission Trajectory Management 07.06.03 DCB/ASM Scenarios Management 07.06.04 UDPP
07.06.05 Dynamic DCB 07.07 Transition Scenarios
08.00 Global Co-ordination and Management 08.01 Information Models Development
08.01.01 Operational Requirements & Demands concerning organisation of the ATM information Management within the Scope of the European ATM Enterprise Architecture 08.01.03 AIRM Deliverable
08.01.04 Aeronautical information (AIS Airport Manning, Airport Network, Terrain and Obstacles 08.01.05 Information modelling Flow & Demand & Capacity Domain
08.01.06 Information Modelling Meteorological Domain 08.01.07 Information Modelling Surveillance Domain 08.01.08 Information Modelling Environment Domain 08.01.09 Information Modelling Flight Data Domain 08.01.10 Information Modelling Airport Domain 08.01.11 Information Modelling Other Domains 08.03 Information Service Models Development
08.03.02 Operational ATM Requirements and Demands concerning ATM Information Catalogue & Registry Services 08.03.03 Identify and Develop Aeronautical Information ATM Services
08.03.04 Identify and Develop ATC Operators (En Route and TMA) Information Services 08.03.05 Identify and Develop European ATM Network and Sub-regional (FAB) Information Services 08.03.06 Identify and Develop Airport Operators ATM Information Services
08.03.07 Identify and Develop AIRSPACE USERS (incl. AOC) ATM Information Services 08.03.10 Information Service Modelling deliverables
09.00 Global Co-ordination and Management 09.01 Airborne Initial 4D Trafectory Management
09.02 Airborne Full 4D Trajectory Management & 4D contract capability 09.03 Interoperability of Business Trajectory and Mission Trajectory 09.05 ASA-ASPA
09.06 ASAS-ASEP
09.09 RNP Transition to xLS (x = G I M) 09.10 Approach with Vertical Guidance APV 09.11 Aircraft Systems for Wake Encounter Alleviation 09.12 GBAS Cat II/III
09.13 Airport Surface Taxi Clearances 09.14 Airport Surface Alerts (ownership and traffic) 09.16 New Communication Technology at Airport 09.19 SWIM Air-Ground Capability
09.20 Military Data Link Accommodation 09.21 ADS-B - 1090 Higher Performance Study 09.22 Mid & Full ADS-B Capability - Research 09.24 ADS-B In/Out for military aircraft
09.27 Multi-constellation GNSS Airborne navigation Systems 09.28 Enhanced Vision (Head Down and Head Up) Solutions 09.29 Enhanced & Synthetic Vision
09.30 Weather Hazards / Wake Vortex Sensor 09.31 Aeronautical databases
09.33 ATS Datalink Operational Improvements 09.38 ASAS - SSEP
09.39 Continuous Climbing Cruise
09.40 Long-term CDA & Steeper Approach Airborne Architecture 09.44 Flexible Communication Avionics
09.47 TCAS Evolution
09.48 AIS/MET Services & Data Distribution
09.49 Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap 10.00 Global Coordination and Management
10.01 ATC System and Supervision Definition 10.01.07 ATC System Specification
10.01.09 ATC System Supervision 10.02 Trajectory Management 10.02.01 ATC Trajectory Management Design
10.02.02 Trajectory Management Exchange Formats Definition 10.02.03 ATC system support to RBT/MT Revision 10.02.05 Flight Object IOP System Requirement & Validation 10.03 Separtion Management
10.03.01 Handling free routing, new approach & departure procedures and mixed separation modes 10.03.02 ATC Support to ASAS sequencing and merging operations
10.03.03 ATC support to ASAS in Trail Procedure (ITP) 10.03.08 ATC System support to Precision Trajectory Clearances 10.04 Controller Tools and Safety Nets
10.04.01 Enhanced Tools for Conflict Detection and Resolution 10.04.02 Precision Conformance Monitoring
10.04.03 Safety Nets adaptation to new modes of operation 10.04.04 Time Based Separation
10.05.01 System impact of the use of flexible, new types of, & restricted airspace 10.07.01 Enhanced Datalink Features for all phase of flight
10.08.01 Complexity Assessment and Resolution 10.09 Queue Management and route optimisation 10.09.01 Integration of Queue Management 10.09.02 Multiple airport arrival/departure management 10.09.04 CDA and CCD in high density traffic
10.10 iCWP Human Factors aspectis and User interface Design 10.10.02 iCWP Human Factors Design
10.10.03 iCWP Prototyping 11.02.01 Title to be completed 11.02.02 Title to be completed
12.00 Global Co-ordination and Management 12.01 Overall Airport Systems Specification
12.01.07 Airport Systems Specification drafting and maintenance 12.01.09 ATC Systems Supervision
12.02 Runway Management 12.02.01 Runway Management Tools
12.02.02 Runway Wake Vortex Detection, Prediction and decision support tools 12.03 Surface Management
12.03.01 Improved Surveillance for surface management 12.03.02 Enhanced Surface Safety Nets
12.03.03 Enhanced Surface Routing 12.03.04 Enhanced Surface Guidance 12.03.05 Enhanced Sequencing Tools 12.04 Tower Management and ATC 12.04.01 Baseline for airport controller tools 12.04.03 Enhanced FDPs at airports
12.04.04 Integration of Departure Management and Surface Management 12.04.06 Remotely Operated Tower Technology Enablers
12.04.07 Remotely Operated Tower Multiple Controlled Airports with Integrated Working Position 12.04.08 Remotely Operated Tower Technology used for Contingency and Enhanced Local Operations 12.04.09 3d Modelling for remote tower operations
12.04.10 Remotely Operated Tower Computer Augmented Dynamic Vision 12.05 Controller Working Position
12.05.02 Airport Safety Nets and wind-shear detection and alert for Controllers 12.05.03 Enhance Controller Tools to manage all aspects of 4D trajectories
12.05.04 Integrated Tower Working Position (iCWP) Design, Specification Prototyping and Test/Validation 12.05.05 iCWP Usability and Human Factors Engineering
12.05.07 Performance Based, Monitoring and Decision Support within the HMI of the iCWP 12.06 Airport CDM and Collaborative Planning
12.06.02 The Airport Operations Plan (AOP), decision support tools and conflict detection tools to be integrated in APOC for managing the overall performance of the Airport 12.06.03 Enhanced MET-systems with CDM
12.06.07 AMAN, SMAN, and DMAN fully integrated into CDM processes 12.06.08 Introduction of the UDPP and collaborative departure sequence 12.06.09 Integration of CDM in the SWIM environment
12.07 Airport Performance Assessment Systems
12.07.03 Airport Performance Assessment and Management Support Systems 12.07.05 Improved weather information systems
13.00 Global Co-ordination & Management 13.01 Network Systems Definition
13.01.01 Network Sub-Systems Definition & verification
13.01.04 Impact of new Roles & responsibilities on local/sub-regional/regional Network (Sub)-systems 13.02 Sub-system definition & verification
13.02.01 Network Planning sub-system definition
13.02.02 Aeronautical Information Management sub-system definition 13.02.03 Network Operations & Monitoring sub-system definition 13.02.04 Network Technical Sub-systems
14.00 Global Co-ordination & Management
14.01.01 SWIM SUIT FP6 project follow-up and alignment 14.01.02 Identification of Technology and services options 14.01.03 SWIM Design
14.01.04 Interface specification and Services Technical requirements 14.02 SWIM Test Platforms
14.02.01 SWIM Middleware 14.02.02 Swim Security solutions 14.02.03 SWIM technical supervision
14.02.09 SWIM Platform Development and Demonstration Delivery 14.04 SWIM Exploitation
15.00 Global Co-ordination & Management 15.01.06 Spectrum Management & Impact Assessment 15.02 Communications
15.02.04 Future Mobile data Link system definition 15.02.06 Future Mobile Satellite Communication 15.02.07 Airport Surface Datalink
15.02.08 Civil-Military Data Link Interoperability
15.02.10 Terrestrial communication infrastructure - SWIM backbone 15.03 Navigation
15.03.01 Navigation technologies specifications 15.03.02 Navigation Infrastructure Rationalisation 15.03.04 GNSS Baseline Study
15.03.05 Enhanced SBAS - GNSS Evolution for Aeronautic Aspects 15.03.06 GBAS Cat II/III L1 Approach
15.03.07 Multi GNSS CAT II/III GBAS 15.04 Surveillance
15.04.01 Surveillance infrastructure rationalisation study 15.04.03 ACAS Monitoring
15.04.05.a Surveillance ground system enhancements for ADS-B
15.04.05.b Surveillance ground system enhancements for ADS-B (Prototype development) 15.04.09.a Weather sensing technologies specifications
15.04.09.b Weather infrastructure requirements Study 15.04.09.c Ground Weather Monitoring System 16.00 Global Coordination and Management 16.01 Safety
16.01.01 Develop a top-down accident-incident model and a Safety Target Achievement Roadmap (STAR) (ex 16.1.1.1) 16.01.02 Ensuring ATM with SESAR is kept resilient (ex 16.1.1.9)
16.01.03 Develop techniques for Dynamic Risk Modelling (ex 16.1.1.11)
16.01.04 Develop the notion of 'proof of concept' for aircraft certification when introducing new concept of operations (ex 16.1.1.14) 16.02 ATM Security
16.02.01 ATM Security management - ATM Security Framework (ex 16.2.1.1) 16.02.02 ATM Security management - Security management tools (ex 16.2.1.3) 16.02.03 Security Risk assessment - Security risk assessment methodology (ex 16.2.3.1) 16.02.04 Security Risk assessment - Security validation process (ex 16.2.3.2) 16.02.05 Harmonised ATM Security best practices (ex 16.2.5.1)
16.03 Environmental sustainability
16.03.01 Development of the SESAR environmental validation framework (metrics, methods, models, tools) 16.03.02 Support to development of performance indicators
16.03.03 Develop framework to establish interdependencies vs. other performance areas 16.03.04 Options to Mitigate Future Environmental Risks to ATM System Capacity 16.03.07 Future regulatory scenarios and impacts
16.04 Human Performance Management System R&D
16.04.01 Evolution from ATM HF Case to a HP Case Methodology for SESAR (ex 16.5.1.1) 16.04.02 HP Tool Repository of SESAR standard HP methods and tools (ex 16.5.1.3)
16.04.03 Impacts of future systems and procedures on selection, training, competence and staffing requirements (ex 16.5.1.4) 16.04.04 Social and Cultural Factors impacting on SESAR Changes (ex 16.5.1.8)
16.05 Human performance in Automation support
16.05.01 Identification and integration of Automation Related Best Practices (ex 16.5.2.1) 16.05.02 Trade-off between planning and flexibility (ex 16.5.2.3)
16.05.03 Guidance for an effective information presentation (ex 16.5.2.6)
16.05.04 Selection and training requirements to work with automated decision and support tools (ex 16.5.2.8) 16.06 TA coordination and support function
16.06.01 Safety support and coordination function 16.06.02 Security support and coordination function 16.06.03 Environment support and coordination function 16.06.05 Human Performance support and coordination function 16.06.06 Business Case Maintenance, support and coordination B.00 Global Co-ordination and Management
B.01 Consolidation & Coordination of ATM Target Concept
B.04.01 Development & maintenance of the ATM performance and business aspects of the European ATM Enterprise Architecture B.04.02 Update and maintenance of the development of the Concept of Operations (CONOPS) and associated ATM Services B.04.03 Development of the high level logical system architecture (SOA) and the technical system architecture (SoS) B.05 Performance Analysis of ATM Target Concept
C.00 Global Co-ordination & Management C.01 Administrate ATM Master Plan Updates C.02 Deployment/Performance planning and reporting C.03 Maintain Standardisation and Regulatory Roadmaps E.01.01 ComplexWorld E.01.02 HALA! E.02.01 SUPEROPT E.02.02 NEWO E.02.03 STREAM E.02.04 ONBOARD E.02.05 ASHiCS E.02.06 POEM E.02.07 TESA E.02.08 MUFASA E.02.09 ADAHR E.02.10 MAREA E.02.11 C-SHARE E.02.12 COMPASS E.02.13 ALIAS E.02.14 CASSIOPEIA E.02.15 UTOPIA E.02.16 ZeFMaP E.02.17 SPAD E.02.18 ELSA