Full text

(1)

Cedar and South Street Area Flood

Cedar and South Street Area Flood

Remediation Project

Remediation Project

(2)

HEC-RAS Model Cross Sections

Cross Section

Locations

Existing Conditions

Overbank water flows

west along Cedar

Channel capacity exceeded

between 1 or 2 year event

Overtops roadway between

10-year and 25-year event

Overtops roadway between

5-year and 10-year event

25-year Flood Limits

Channel capacity exceeded

at a 10 year event

(3)

Overtops roadway at a 25 year event Bradley Street

Channel capacity exceeded at a 10-year and 25-year event Between South Street and Bradley St. Culvert

Overtops roadway between a 10-year and 25-year event South Street Culvert

Channel capacity exceeded at a 1 or 2 year event Between Cedar Street and South St. Culvert

Overtops roadway between a 5-year and 10-year event Cedar Street Culvert

Channel capacity exceeded at a 10 year event Between Arch St. Culvert and Cedar Street

Flow is contained within the channel upstream of the Arch St 60' RCP culvert. Downstream of the Arch Street culvert flow exits the channel primarily on the eastern side. Backwater upstream of Cedar Street forces water to the west down Cedar Street. The channel between the Arch Street culvert and Bradley is insufficient to convey the flows between the 1-year and 25-year storm events as described below.

Summary of Flooding Impacts/Reduction:

NA Properties Required to Implement Alternative:

Existing conditions

Alternativ e Description:

Existing Conditions

Alternativ e:

Cedar and South Street Flood Remediation Project - Alternatives Assessment

Alternative A

Channel capacity exceeded

between 2 and 10 year event

Overtops roadway between

25-year and 50-year event

Overtops roadway between

10-year and 25-year event

Channel capacity exceeded

Between 25 and 50 year event

(4)

Overtops roadway between a 25-year and 50-year event Bradley Street

Channel capacity exceeded between 25-year and 50-year event Between South Street and Bradley St. Culvert

Overtops roadway between a 25-year and 50-year event South Street Culvert

Channel capacity exceeded between 2-year to 10-year events Between Cedar Street and South St. Culvert

Overtops roadway between a 10-year and 25-year event Cedar Street Culvert

Channel capacity - between 25-year and 50-year events Between Arch St. Culvert and Cedar Street

Summary of Flooding Impacts/Reduction:

Three houses on South St. and the roller rink property. Properties Required to Implement Alternative:

Channel Modifications: none other than removing sediment from the Cedar

Street culvert.

Basins: This alternative considers 18 acre-feet of off-line storage in basins

bounded by Chargin Rd, South St, and the existing channel. Flow would be diverted from the channel downstream of the Pine St or Arch St culvert outlets and discharged back into the channel downstream of Cedar St. Some flow would be maintained in the channel between the points of diversion and discharge to minimize channel permitting issues. The basins would be constructed with a setback from the existing channel bank. This alternative would require culvert crossings of Pine St and Cedar St.

Alternativ e Description:

A

Alternativ e:

Alternative B

Channel capacity exceeded

between 10 and 50-year event

Overtops roadway between

25-year and 50-year event

Overtops roadway between

50 and 100-year event

without modification

Channel capacity

-100 year event

(5)

Overtops roadway between a 25-year and 50-year event Bradley Street

Channel capacity exceeded between 25-year and 50-year event Between South Street and Bradley St. Culvert

Overtops roadway between a 25-year and 50-year event South Street Culvert

Channel capacity exceeded between 10-year to 50-year events Between Cedar Street and South St. Culvert

Overtops roadway between 50-year and 100-year without culvert modifications Cedar Street Culvert

Channel capacity - 100-year Between Arch St. Culvert and Cedar Street

Summary of Flooding Impacts/Reduction:

Three houses on South St. and the roller rink property. Properties Required to Implement Alternative:

Channel Modifications: This alternative considers channel modifications from the outlet

of the Arch St. culvert to South Street. A minimum channel top width of 10' with vertical channel banks wa s created for the man-made bank sections of the channel because of space limtiations. More natural sections were widened where space was available to increase channel conveyance capacity. Sediment should be cleaned from the Cedar Street culvert. Improvements to the Cedar Street culvert should also be considered.

Basins: The basins as described in Alternative A are also included in this alternative. Alternativ e Description:

B

Alternativ e:

Cedar and South Street Flood Remediation Project - Alternatives Assessment

Alternative C

Channel capacity exceeded

between 10 and 50-year event

Overtops roadway between

25-year and 50-year event

Overtops roadway between

50 and 100-year event

without modification

Channel capacity –

100- year event

(6)

Overtops roadway between 25-year and 50-year event Bradley Street

Channel capacity exceeded between 25-year and 50-year event Between South Street and Bradley St. Culvert

Overtops roadway between a 25-year and 50-year event South Street Culvert

Channel capacity exceeded between 10-year to 50-year events Between Cedar Street and South St. Culvert

Overtops roadway between 50-year and 100-year without culvert modifications Cedar Street Culvert

Channel capacity - 100-year Between Arch St. Culvert and Cedar Street

Summary of Flooding Impacts/Reduction:

Three houses on South St. and the roller rink property. Properties Required to Implement Alternative:

Channel Modifications: This alternative considers channel modifications from the outlet

of the Arch St. culvert to South Street as described in Alternative B.

Basins: This alternative increases the storage capaisty of the existing basin to the east

of Chagrin Rd by 25%. The basins as described in Alternative A are also included in this alternative. Alternativ e Description: C Alternativ e:

Alternative D

Channel capacity

exceeded between

25 and 50-year event

Culvert capacity –

100-year event

Culvert capacity

– 100-year event

Channel capacity –

100- year event

Upstream Detention

maintains water

surface elevations at

or below existing levels

(7)

Overtops roadway between 25-year and 50-year event Bradley Street

Channel capacity exceeded between 25-year and 100-year event Between South Street and Bradley St. Culvert

Culvert capacity - 100-year event South Street Culvert

Channel capacity exceeded between 25-year to 50-year events Between Cedar Street and South St. Culvert

Culvert capacity - 100-year event Cedar Street Culvert

Channel capacity - 100-year Between Arch St. Culvert and Cedar Street

Summary of Flooding Impacts/Reduction:

No private property acquisition Properties Required to Implement Alternative:

Culvert - 4'x6' box culvert, connect culverts from exisiting basin and eastern

watersheds

Basins: 4.3 and 0.07 ac-ft at bypass culvert inlet Alternativ e Description:

D

Alternativ e:

Cedar and South Street Flood Remediation Project - Alternatives Assessment

Questions?

References

Related documents

When assessing the total costs — or true cost — of the offshore-delivered services versus onshore delivered services, there is often a very different picture: True costs involve

Conclude the lesson by asking the children to record their ideas about their Jihad as a response to the sentence starter on the response sheet.. Helping other people make their

ت لصاح جیاتن ساسارب زین رضاح شهوژپ رد أ دیک تسد طسوت هک یشهوژپ .دیدرگ ناراکمه و هداشگ ماجنا ریداقم ،دش روتکاف یگدولآ ار یارب نیگنایم رصانع

NHS Employers will be submitting evidence on your behalf to the Doctors and Dentists Review Body (DDRB) and the Review Body for Nursing and Other Health Professions (NOHPRB) and the

tit, 14 § 1201-A (“It is the policy of the state that all persons chosen for jury service be selected at random from the broadest feasible cross section of the population of the

IADC Bit Dull Grading Code INNER ROWS OUTER ROWS DULL CHAR LOCA- TION BRNG/ SEALS GAUGE 1/16” OTHER CHAR REASON PULLED.. Cutting Structure B

Channels to change the checklist can assist hospital emergency response team using the contingency plan of activators and patient from calling.. Which is not challenge the patient

1 The purpose of the $50 million limit was to encourage government securities dealers to split large trades into multiple partial deliveries and, thereby, reduce subsequent