Gas Lift System Design
INSTRUCTOR :
Greg Stephenson
•
CONTINUOUS FLOW GAS LIFT
•
INTERMITTENT GAS LIFT
•
CONVENTIONAL & WIRELINE RETRIEVABLE
GAS LIFT EQUIPMENT
•
TO ENABLE WELLS THAT WILL NOT FLOW NATURALLY TO PRODUCE
•
TO INCREASE PRODUCTION RATES IN FLOWING WELLS
•
TO UNLOAD A WELL THAT WILL LATER FLOW NATURALLY
•
TO REMOVE OR UNLOAD FLUID IN GAS WELLS
•
TO BACK FLOW SALT WATER DISPOSAL WELLS
•
Initial downhole equipment costs lower
•
low operational and maintenance cost
•
Simplified well completions
•
Flexibility - can handle rates from 10 to 50,000 bpd
•
Can best handle sand / gas / well deviation
•
Must have a source of gas
•
Imported from other fields
•
Produced gas - may result in start up problems
•
Possible high installation cost
•
Top sides modifications to existing platforms
•
Compressor installation
•
Limited by available reservoir pressure
and bottom hole flowing pressure
INJECTION GAS CHOKE CLOSED
TOP VALVE OPEN
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
0
2000
6000
8000
10000
12000
14000
4000
2000
4000
D
E
P
T
H
F
T
T
V
D
SIBHP
TUBING PRESSURE
CASING PRESSURE
3000
1000
5000
C A S IN G PR ES S U R E T U B IN G PR E S S U R E6000
7000
INJECTION GAS CHOKE OPEN
TOP VALVE OPEN
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
SIBHP
TUBING PRESSURE
CASING PRESSURE
INJECTION GAS CHOKE OPEN
TOP VALVE OPEN
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
SIBHP
TUBING PRESSURE
CASING PRESSURE
INJECTION GAS CHOKE OPEN
TOP VALVE OPEN
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
SIBHP
TUBING PRESSURE
CASING PRESSURE
DRAWDOWNFBHP
INJECTION GAS CHOKE OPEN
TOP VALVE OPEN
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
TUBING PRESSURE
CASING PRESSURE
DRAWDOWNFBHP
SIBHP
INJECTION GAS CHOKE OPEN
TOP VALVE CLOSED
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
TUBING PRESSURE
CASING PRESSURE
DRAWDOWNFBHP
SIBHP
INJECTION GAS CHOKE OPEN
TOP VALVE CLOSED
SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
TUBING PRESSURE
CASING PRESSURE
DRAWDOWNFBHP
SIBHP
INJECTION GAS CHOKE OPEN
TOP VALVE CLOSED
SECOND VALVE CLOSED THIRD VALVE OPEN FOURTH VALVE OPEN
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
TUBING PRESSURE
CASING PRESSURE
DRAWDOWNFBHP
SIBHP
0
200
400
600
800
1000
1200
1400
1600
1800
2000
12:00 AM
03:00 AM
06:00 AM
09:00 AM
12:00 PM
03:00 PM
06:00 PM
T ime
P
re
s
s
u
re
p
s
i
GAS LIFT WELL KICK-OFF
•
Unload well carefully
–
50 - 100 psi (3.5 bar) per 10 min
–
1 - 2 bbl per min
•
Maximize production choke opening
•
Gradually increase gas injection rate
•
Monitor well clean up and stability
•
Get to target position
•
Perform step rate production test
•
Optimize gas injection rate
KEY LEARNING OBJECTIVES
UPON COMPLETION OF THIS SEGMENT, YOU SHOULD BE ABLE TO:
•
Explain the procedure for running and pulling gas lift valves from a side
pocket mandrel.
•
Describe the precautions that should be taken during running and
pulling operations.
•
Explain the operation of the OK series kickover tool.
•
Explain the operation of the BK-1 latch.
•
List and describe the different latch profiles available and explain the
importance of latch / pocket compatability.
•
Methodical
•
Equalise pressure
•
Valve catcher
•
Latches
•
Running / pulling tools
•
Pressure tests
•
Experience
KEY LEARNING OBJECTIVES
UPON COMPLETION OF THIS SEGMENT, YOU SHOULD BE ABLE TO:
•
Understand the purpose of a gas lift valve latch.
•
Identify key latch components.
SIDE POCKET
MANDRELS
CONVENTIONAL
MANDREL
ENGINEERING DATA
PART NUMBER
05712-000-00001
SIZE
5 1/2”
MAX O.D.
7.982”
MIN I.D.
4.756”
DRIFT I.D.
4.653”
THREAD
17 LB/FT MANN BDS B x P
TEST PRESSURE INTERNAL
7740 PSI
TEST PRESSURE EXTERNAL
6280 PSI
LATCH TYPE
RK, RK-1, RKP, RK-SP
KICKOVER TOOL
OM-1, OM-1M, OM-1S
RUNNING TOOL
RK-1 15079
PULLING TOOL
1 5/8” JDS 15155
MATERIAL
410 S.S., 13 CR 22 HRC MAX
Orienting
Sleeve
Tool
Discrim inator
‘G’ Latch
Lug
Polished
Seal Bore
BASIC DESIGN FEATURESBASIC DESIGN FEATURESBASIC DESIGN FEATURESBASIC DESIGN FEATURES KB KB KB KB 1ST IDENTIFIER 1" POCKET M M M M 1ST IDENTIFIER 1-1/2" POCKET M M M
M 2ND IDENTIFIER OVAL BODY PIPE M
M M
M 3RD IDENTIFIER MACHINED POCKET W/TOOL DISCRIMINATOR G
G G
G TOOL DISCRIMNINATOR AND ORIENTING SLEEVE R
RR
R CAMCO DESIGN - ROUND BODY PIPE T
T T
T TRUGUIDE DESIGN - ROUND BODY PIPE A A A A A POCKET PROFILE U U U
U REDUCED O.D. AND I.D. E
E E
E STANDARD POCKET PORTING - BOTTOM EXHAUST EC
EC EC
EC POCKET PORTED TO TUBING - BOTTOM EXHAUST W
W W
W WATERFLOOD
BASIC DESIGN VARIATIONSBASIC DESIGN VARIATIONSBASIC DESIGN VARIATIONSBASIC DESIGN VARIATIONS
2 22
2 SLIGHTLY REDUCED MAJOR O.D. 3
33
3 SPECIAL THREADING CONSIDERATIONS 4
44
4 THREAD RECUTS 5
55
5 EXTERNAL GUARD DEVICES 7
77
7 SPECIAL INTERNAL MODIFICATIONS 8
88
8 SPECIAL POCKET MODIFICATION 9
99
9 BOTTOM LATCH ONLY 10 10 10 10 PLUGGABLE OR NO PORTS LT LT LT
LT SIDEPIPE POCKET PORTING LTS
LTS LTS
3 basic types of gas lift valve, each available in 1” & 1-1/2” sizes:
Dummy valves
Orifice valves
Unloading valves
•
•
Square edged
Square edged
•
•
Venturi
Venturi
(nova)
(nova)
•
•
Injection pressure (casing)
Injection pressure (casing)
operated valves
operated valves
•
•
production pressure (fluid)
production pressure (fluid)
operated valves
operated valves
•
•
Throttling/proportional response
Throttling/proportional response
valves
•
Normally required during unloading phase
only
•
Open only when annulus and tubing
pressures are high enough to overcome valve
set pressure
•
Valve closes after transfer to next station
Spring
Stem
Stem Tip
Port
Downstream
Upstream
Upstream/
Casing
Downstream/Tubing
F = P X A
F = P X A
Pc
1Pd
Pd
Pt
Pt
WHEN THE VALVE IS CLOSED
WHEN THE VALVE IS CLOSED
TO OPEN IT…..
TO OPEN IT…..
Pd x
Pd x
Ab
Ab
=
=
Pc
1(Ab - Ap) + Pt Ap
Pd
Pd
Pc
2WHEN THE VALVE IS OPEN
WHEN THE VALVE IS OPEN
TO CLOSE IT…..
TO CLOSE IT…..
Pd x
CLOSING FORCE (IPO VALVE)
Fc = PbAb
OPENING FORCES (IPO VALVE)
Fo
1
= Pc (Ab- Ap)
Fo
2
= Pt Ap
TOTAL OPENING FORCE
Fo = Pc (Ab - Ap) + Pt Ap
JUST BEFORE THE VALVE OPENS THE FORCES ARE EQUAL
Pc (Ab - Ap) + Pt Ap = Pb Ab
Pb - Pt (Ap/Ab)
SOLVING FOR Pc
Pc =
---1 - (Ap/Ab)
WHERE:
Pb
= Pressure in bellows
Pt
= Tubing pressure
Pb - Pt (Ap/Ab)
Pc =
---1 - (Ap/Ab)
Pb - Pt (R)
Pc =
---1 - R
Pb = Pc (1 - R) + Pt (R)
INJECTION GAS
2000
6000
8000
10000
12000
14000
4000
D
E
P
T
H
F
T
T
V
D
DRAWDOWN0
2000
6000
8000
10000
12000
14000
4000
1000
2000
D
E
P
T
H
F
T
T
V
D
1500
500
2500
DRAWDOWN3000
3500
INJECTION GAS
AT SURFACE
AT SURFACE
VALVE # 1
VALVE # 1
VALVE # 2
VALVE # 2
VALVE # 3
VALVE # 3
DOME P.
DOME P.
1200 PSI
1200 PSI
1260 PSI
1260 PSI
1300 PSI
1300 PSI
TUBING P.
TUBING P.
@ DEPTH
@ DEPTH
890 PSI
890 PSI
740 PSI
740 PSI
560 PSI
560 PSI
? PSI
? PSI
? PSI
? PSI
? PSI
? PSI
1340 PSI
Pt Pc Bellows Square Edged Seat Check Valve Chevron Packing Stack Chevron Packing Stack
Stem Tip (Ball)
Pt Pc Bellows Check Valve Chevron Packing Stack Chevron Packing Stack
Stem Tip (Ball) Square Edged Seat
Pt Pc Bellows Tapered T.C. Seat Check Valve Chevron Packing Stack Chevron Packing Stack Large T.C. Ball Pt Pc Square Edged Seat Check Valve Chevron Packing Stack Chevron Packing Stack
Stem Tip (Ball) Spring Adjustment Nut & Lock Nuts