• No results found

A new tool for prioritization of sequence variants from whole exome sequencing data

N/A
N/A
Protected

Academic year: 2020

Share "A new tool for prioritization of sequence variants from whole exome sequencing data"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 The seven-level filtration framework that makes up the backbone of TAPER™. (Abbreviations: 1KGP – 1000 Genomes Project; ESP6500 – ExomeSequencing Project 6500; GERP – Genomic Evolutionary Rate Prediction Score; FATHMM – Functional Annotation Through Hidden Markov Models)
Table 1 Stepwise breakdown of results obtained by TAPER™ using WES datasets for which the causal mutations have previously been identified

References

Related documents

The Government’s guidelines for external reporting for state- owned companies adopted in November 2007, (see pages 17–18 and 22–31) with special requirements on state-owned companies

We find that all asset allocations based on multivariate return forecast models outperform the market index, the passive 1/N portfolio and asset allocations based on the

[9] developed a fault-tolerant model that extends the traditional Primary Backup model on cloud and further, proposed a dynamic fault-tolerant scheduling algorithm to improve

Specifically, this Article examines: (1) the evolution of academic support programs in law schools to include bar passage programs, with a brief description of the types of

spectrum licenses should be flexible with respect to the technologies used and the services provided, subject to the ability to police interference efficiently;

For these reasons, we begin our analysis of how households respond to changing elec- tricity and gas prices by considering the elasticity of household electricity and gas demand

If Donna were to file a charge of discrimination with the EEOC, a court applying the subjective-perception test would likely find that she has a viable same- sex

The use of the prioritisation strategy "Direct Connected Pax Prioritisation" leads in the simulation to only the group of 45 late arriving passengers on the selected