• No results found

Z A M B E Z I R E S O U R C E S ZAMBEZI RESOURCES LIMITED ARBN:

N/A
N/A
Protected

Academic year: 2021

Share "Z A M B E Z I R E S O U R C E S ZAMBEZI RESOURCES LIMITED ARBN:"

Copied!
75
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1: Kangaluwi Copper Project Mineral Resource at 0.3% Cu Cut-off Grade

References

Related documents

The present study was conducted to test the hypotheses that patients with right- or left-sided TKA show a signifi- cant increase in BRT from pre-operative (pre-op, 1 day before

The MID in the HHS pain function, physical function, deformity, and total scores (range from 2.28 to 11.26) are generally higher than those of the SF-36 subscales (range from 12.37

The lack of good quality studies, variation in defin- ition of success and limited follow-up of patients means the success rate of clubfoot treatment using the Ponseti method

reported a subluxa- tion/reluxation rate of 13% (six of 45 operated knees) in an average follow-up examination period of 13.5 years, where 14 patients and 15 Roux-Elmslie-Trillat

Mas enfim, mesmo quando você pensa numa organização assim grande, até o micro, que é uma organização local como a Redes da Maré, você tem dificuldades de trazer o gênero, eu acho

The present analysis extended the use of this Bayesian framework to fit the model against hypoxic volume data and examined how parameter estimation and predictive uncertainty can

Pakistanis to about ten percent of the Qatar resident population. In a follow-up joint Pakistan- Qatar Trade and Investment Conference in March, 2019, Pakistan proposed 32

Background: The purpose of our study was to assess the clinical and imaging outcome of autologous matrix-induced chondrogenesis (AMIC) technique consisting of microfractures followed