MCCCD Project Amendment Request 800017 CFS R12 Upgrade

9/13/2010, Page 1

PROJECT NAME 800017 CFS R12 Upgrade

DATE 9/3/2010

CLIENT Business Services

EXECUTIVE CHAMPION George Kahkedjian, Debra Thompson PROJECT MANAGER Philip Cram

AFFECTED AREAS (please check all that apply)

Project Start Date Project End Date Development Costs Total Costs

Project Scope Proposed Technology Major Deliverables/Outcomes Roles/Responsibilities

NOTE: If there are changes in the project cost you must provide: • REVISED Funding Source: 774420 - Enterprise Applications • REVISED Funding Timeline:

o September ITC

o October Governing Board • Project Sponsor Signatures:

o George Kahkedjian o Debra Thompson

Current Recorded Dates/Costs Requested Revisions to Dates/Costs

Start Date 10/2009 End Date 3/2011 Development Cost ($000) Total Cost ($000) $530,000

Start Date End Date

3/2012 Development Cost ($000) Total Cost ($000) $2,092,400 Justification Summary

The R12 Upgrade Project has been working over the past year to upgrade CFS to Release 12 of Oracle Applications. The project began with the pre-upgrade readiness assessment from Solution Beacon in the Fall of 2009. This year, a vendor was selected, HighPoint Consulting, to partner with MCCCD to complete the upgrade project. The vendor selection process was based on a RFQ issued to qualified vendors under RFP# 2977-10.

Following best practices and configuration suggestions from Solution Beacon, HighPoint, and Oracle, it has become evident that additional funds are needed for the project. These additional funds can be broken into three separate categories: Hardware, Additional R12 Upgrade Costs and New Application Modules. Hardware includes the new hardware and operating software support. The Additional R12 Upgrade Costs includes consulting and training dollars. The New Application Modules includes the upgrade of the application software license along with the costs for implementation of three new modules for Business Services.

Hardware and Operating System

The hardware that hosts the CFS application needs to be replaced. This will allow CFS to separate the database and the application server tiers to provide for better system performance, as recommended by Solution Beacon. It will also position CFS for external access to the application for such services as iSupplier, an application module that allows external suppliers to maintain their own supplier record with MCCCD. Additionally, the new hardware will provide a more robust development environment so that more instances can be created for testing and developmental purposes. As with the current system, an upgrade

(2)

P

ROJECT

A

MENDMENT

R

EQUEST

MCCCD Project Amendment Request 800017 CFS R12 Upgrade

9/13/2010, Page 2

in production hardware also requires an upgrade to the disaster recovery hardware, and that is included. Also included is three years of support for the operating systems for the database and application servers. Total cost for the Hardware and Operating System Upgrade is $120,000

R12 Upgrade Additional Consulting and Training

The original budget request for the R12 Upgrade Project was based on research on other public and governmental agencies that had allocated monies for an R12 upgrade; those estimates ranged from a low of $837,000 and a high of $1,901,000. An optimistic request of $540,000 was submitted, but after a year of working with consultants and vendors, it seems that the original request was lacking. The estimate for consulting for the project from the vendor selected to perform the upgrade shows that we will need additional monies for services including a fixed-price performance tuning engagement and additional dollars for customization/modification development and remediation to the new software version. Along with UPK for the users, the DBA’s and developers will need to update their skills to maintain the new version of CFS once the upgrade is complete. Under the original project request, there was an $84,000 line item for training, but those dollars were absorbed by the consulting required for the upgrade project, so training dollars need to be added back into the project budget. Total cost for the R12 Upgrade Additional Consulting and training is $295,000.

UPK Content

Project discussions with various vendors have uncovered a method that will allow for better training of our on-line users. UPK, or User Productivity Kit, is an interactive product that users can access while in the application for documentation of application processes. MCCCD owns UPK developer licenses that can be used to customize content, and Oracle provides already-built content for the eBusiness suite modules. Total cost for UPK Content is $152,000.

New Application Modules

Solution Beacon, the company that performed the pre-upgrade readiness assessment, included a future footprint in their report that included recommendations on additional modules for Oracle eBusiness. These additional modules align closely with 21st Century goals for effectiveness and efficiency, including modules such as iExpense, which will allow for the automation of the expense reporting process and iSupplier, a product that enables MCCCD suppliers to actively maintain their supplier record within CFS. iExpense will save MCCCD dollars on processing expense reports and payments, and iSupplier will free up Purchasing Office employee time spent maintaining the supplier records. In addition to these two modules, Business Services has been interested in implementing the Treasury module for a number of years, which will provide efficiencies for the management of MCCCD’s monetary and bond accounts. These new application modules will require an upgrade to the application software license and implementation consulting costs.

Application Software License Upgrade

MCCCD’s application license is for individual modules of the eBusiness Suite and is based on a licensing metric of named users. This license dates back 15 years when MCCCD first purchased the application from Oracle. Oracle has changed the metric by which the software is licensed, but they grandfathered MCCCD’s licensing structure as long as there were no changes to application license. Since MCCCD wants to license additional new modules, the licensing structure needs to be converted to what is called an Enterprise license which is based on annual budgets rather than named users. A by-product of this license conversion is that MCCCD will be licensed for the full version of eBusiness suite, which will allow unlimited access to all seven of the eBusiness modules instead of the four MCCCD currently licenses. The

conversion cost will include the licensing for the three new modules and also include the first year of support. Total cost for the Application Software License Upgrade is $695,000.

(3)

P

ROJECT

A

MENDMENT

R

EQUEST

MCCCD Project Amendment Request 800017 CFS R12 Upgrade

9/13/2010, Page 3

New Module Implementation

MCCCD will require additional consulting for the new modules that will include the functional configuration and setup of the new modules as well as testing and validation of the software. The implementation of the new modules will be included as part of the R12 upgrade project and be completed in March 2012. Total cost for New Module Implementation is $226,000.

800017 CFS R12 Upgrade Project Budget

Original Budget Allocation $530,000

CFS R12 Upgrade Project Amendment Hardware and Operating System

CFS Hardware $101,000

CFS Operating Systems $19,000

Subtotal Hardware and Operating System $120,000 Additional R12 Upgrade Costs

Additional Consulting and Training

Performance Tuning $75,000

CEMLI Development/Remediation $150,000

DBA/Developer Training $70,000

Total Additional Consulting and Training $295,000 UPK Content

UPK Content $125,000

Support Costs - 1st year $27,000

Total UPK Content $152,000

Subtotal Additional R12 Upgrade Costs $447,000 New Application Modules

Application Software License Upgrade

Conversion/Licensing $570,000

Support Costs - 1st year $125,000

Total Application Software License Upgrade $695,000 New Module Implementation

Consulting Services $226,000

Total New Module Implementation $226,000

Subtotal New Application Modules $921,000

Total CFS R12 Upgrade Project Amendment $1,488,000

5% Contigency $74,400

(4)

P

ROJECT

A

MENDMENT

R

EQUEST

MCCCD Project Amendment Request 800017 CFS R12 Upgrade

9/13/2010, Page 4

Note: Above figures include estimated taxes

Note: The VC Information Technology/CIO signature is required for this form. Submitted By (Printed Name & Signature)

Philip Cram

Date:

VC Information Technology/CIO (Printed Name and Signature) George Kahkedjian

(5)

IT Partners 2828 N. Central Ave, Suite 1203 Phoenix, AZ 85004 Richard Cook [email protected] Company: Attention: Phone: Address: Email: Bob Carrigan [email protected] Date: Quote: Prepared By: Terms: 07/08/2010 Troy Wittrock 2411 West 14th Street Tempe, AZ 85281-6942

Maricopa County Community College District

Net 30 (602) 296-6111 (602) 667-0384 (480) 731-8857 Phone: FAX: CFS R12 - budgetary Expires: 08/08/2010 307113

Budgetary Only Quotation

QTY MODEL DESCRIPTION List Price Net Price Extended Price

S.A.V.E. Cooperative Procurement

1 * City of Tempe Contract ID: IT10-132-01 $0.00 $0.00 $0.00 bl465G7 12-core 16GB Memory

6 518857-B21 HP BL465c G7 CTO Blade $1,571.00 $1,335.35 $8,012.10 6 518852-L21 HP BL465c G7 O6172 12C FIO Kit $1,249.00 $1,061.65 $6,369.90 6 518852-B21 HP BL465c G7 O6172 12C Kit $1,249.00 $1,061.65 $6,369.90 6 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $2,034.90 24 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $5,610.00 12 507125-B21 HP 146GB 6G SAS 10K 2.5in DP ENT HDD $269.00 $228.65 $2,743.80 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 6 HA110A3 7XE BL4xxc Svr Bld HW Support $482.00 $409.70 $2,458.20

HP DL385G7 12-core Large Memory Large

1 573122-B21 HP DL385G7 SFF CTO Chassis $1,511.00 $1,284.35 $1,284.35 1 585324-L21 HP 6172 DL385G7 FIO Kit $1,249.00 $1,061.65 $1,061.65 1 585324-B21 HP 6172 DL385G7 Kit $1,249.00 $1,061.65 $1,061.65 8 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $1,870.00 8 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $3,529.20 1 481041-B21 HP Slim 12.7mm SATA DVD Optical Kit $90.00 $76.50 $76.50 1 534916-B21 HP 512MB Flash Backed Write Cache $429.00 $364.65 $364.65 2 512327-B21 HP 750W CS HE Power Supply Kit $299.00 $254.15 $508.30 1 534516-B21 HP PL Foundation Pk Single Rel FIO SW $1.00 $0.85 $0.85 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 1 HA110A3 7G3 Proliant ServerDL38x HWSupport $879.00 $747.15 $747.15 1 TC278AAE HP Insight Ctl ML/DL Bdl E-LTU 24x7 SW $449.00 $381.65 $381.65 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 1 HA110A3 4YD HP IC ML-DL-BL SW Sup $181.00 $153.85 $153.85

bl685G7 12-core Large Memory High

2 518878-B21 HP BL685c G7 CTO Blade $4,191.00 $3,562.35 $7,124.70 2 593675-L21 HP BL685c G7 O6172 12C 2P FIO Kit $2,500.00 $2,125.00 $4,250.00

(6)

Quote #: 307113 Quote Date: 07/08/2010

QTY MODEL DESCRIPTION List Price Net Price Extended Price

2 593675-B21 HP BL685c G7 O6172 12C 2P Kit $2,499.00 $2,124.15 $4,248.30 2 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $678.30 32 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $7,480.00 4 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $1,764.60 2 451871-B21 HP BLc QLogic QMH2562 8Gb FC HBA Opt $849.00 $721.65 $1,443.30 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 2 HA110A3 7XF BL6xxc Svr Bld HW Support $828.00 $703.80 $1,407.60

bl465G7 12-core 32GB Memory

1 518857-B21 HP BL465c G7 CTO Blade $1,571.00 $1,335.35 $1,335.35 1 518852-L21 HP BL465c G7 O6172 12C FIO Kit $1,249.00 $1,061.65 $1,061.65 1 518852-B21 HP BL465c G7 O6172 12C Kit $1,249.00 $1,061.65 $1,061.65 1 588184-B21 HP Smart Array BL465c/685c G7 FIO Cntrlr $399.00 $339.15 $339.15 8 604500-B21 HP 4GB 1Rx4 PC3L-10600R-9 Kit $275.00 $233.75 $1,870.00 2 507127-B21 HP 300GB 6G SAS 10K 2.5in DP ENT HDD $519.00 $441.15 $882.30 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 1 HA110A3 7XE BL4xxc Svr Bld HW Support $482.00 $409.70 $409.70

300GB EVA Drives

8 AG690B HP EVA M6412A 300GB 15K FC Drive $1,660.00 $1,411.00 $11,288.00 1 HA110A3 HP 3y Support Plus 24 SVC $0.00 $0.00 $0.00 8 HA110A3 13H EVA 146-400GB HDD HW Supp $218.00 $185.30 $1,482.40

$92,765.60 Sub Total:

Estimated Shipping Fee: Total:

TBD

$92,765.60

Budgetary use only. Not for Orders

(7)

Standard Sales Terms and Conditions

1. PAYMENT: (a)

(8)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

From:

Robert Carrigan <

[email protected]

>

Sent:

Tuesday, August 17, 2010 5:33 PM

To:

Philip Cram

Cc:

Richard Lang

Subject:

OEL Support for CFS R12 project

Phil,

I was a little off in my original estimate at the meeting, so see what

you think of the following - using Oracle online resources as a

starting point, budgetary pricing for basic 24x7 Oracle Enterprise

Linux support for the hardware being considered is:

$5,751.00 for the 1st year (we'd add renewals to our annual

renewals budget)

Or

$17,253.00 for 3 years (we'd add subsequent renweals for our

annual renewals budget)

Derived from the following...

For the web / app / DR servers: Enterprise Linux Basic Limited

Support

$3,592.80 ($449.10 annually per system, qty = 8)

For the dev / prod database servers: Enterprise Linux Basic Support

$2,158.20 ($1,079.10 annually per system, qty = 2)

For reference, URLs to Oracle's OEL support options is the

following...

https://shop.oracle.com/pls/ostore/product?p1=EnterpriseLinux&sc=ocoml

ink_buynow_enterpriselinux

OEL Support for CFS R12 project.txt

9/13/2010 7:36 AM

(9)

192.168.10.15

PIX firewall PIX firewall

ACE ACE

FWSM firewall FWSM fireall ASA firewall ASA firewall

Internet

CFS R12 Upgrade - Production

Version 1.0 8/31/2010 Maricopa Computers Perimeter Firewall Datacenter Firewall HP BL465 Application and Web servers

Load Balancers HP BL465 Apex Server

VPN concentrator

VPN

HP BL685 Oracle Database Server

Dataguard to Airpark

B2B Client Connections

Storage on EVA4400 (approx 1T) Other systems accessing the

database server include: SIS, HR, BOXI

Note, Imaging, stage1 probably connect to

(10)

192.168.10.15

PIX firewall PIX firewall

ACE ACE FWSM firewall FWSM fireall

CFS R12 Upgrade - Development

Version 1.0 8/31/2010 Maricopa Computers Datacenter Firewall HP BL465 Application and Web servers

Load Balancers HP BL465 Apex Server

VPN concentrator

VPN

HP BL685 Oracle Database Server

Storage on Compellent (if it ever gets ordered) Other systems accessing the

database server include: dev SIS, dev HR, dev BOXI

(11)

MCCCD Financials Pricing License and Support Costs

License Metric

License Qty

Enterprise List Price

Net License

Fees

Net 1st Yr

Support Fees

Total

CORE SW EBS Financials **

Operating Budget 1,600 5,669,975 519,174 114,218 633,392

Included: General Ledger

Accounts Payable Accounts Receivable iAssets Cash Management

Globabl Consolidation Manager

CPG Trade Accounting Purchasing ** Opertating Budget 1,600 Included iSuppler Portal Opertating Budget 1,600 Included Internet Expenses Opertating Budget 1,600 Included Treasury Named User 5 Included CORE SW - SUBTOTAL 5,669,975 519,174 114,218 633,392

ADDITIONAL SW Oracle e-Business Suite UPK - General Ledger

Module 70,000 35,000 7,700 42,700

Oracle e-Business Suite UPK - Accounts Payable

Module 35,000 17,500 3,850 21,350

Oracle e-Business Suite UPK - Accounts Receivable

Module 35,000 17,500 3,850 21,350

Oracle e-Business Suite UPK - Assets

Module 35,000 17,500 3,850 21,350

Oracle e-Business Suite UPK - Internet Expenses

Module 17,600 8,800 1,936 10,736

Oracle e-Business Suite UPK - Purchasing

Module 70,000 35,000 7,700 42,700

Higher Ed Constituent Hub

Operating Budget 1,600 2,440,000 378,200 83,204 461,404

Higher Ed Constituent Hub - Data Steward

Operating Budget 1,600 Included ADDITIONAL SW - SUBTOTAL 2,702,600 509,500 112,090 621,590

SOFTWARE - GRAND TOTAL

8,372,575

1,028,674

226,308

1,254,982

Oracle Corporation Confidential

8/17/2010

(12)

MCCCD Financials Pricing License and Support Costs

3. 1st Year Annual Support is calculated at 22% of Net License Fees.

2. All products are priced using a Perpetual license term.

** The pricing reflects the migration of the existing modules of G/L, A/P, Assets & Purchasing from a concurrent user basis to an enterprise use metric

PRICING NOTES:

1. Operating Budget quantity is listed as Millions Oracle Corporation Confidential

8/17/2010

(13)

Maricopa County Community College District

Budgetary Estimate - eBusiness Suite Financials Upgrade &

Implementation Project August 16, 2010

(14)

8/16/2010

HighPoint Consulting Proprietary and Confidential

2 | Page

HighPoint Team Approach

Timeline & Budgetary

Estimates for Phased Oct. 2011

Upgrade & March 2012

(15)

8/16/2010

HighPoint Consulting Proprietary and Confidential

3 | Page

T&M Functional Resources

$481,600

Fixed Price EBS Upgrade (inc. 2 Upgrade

Migrations & Production Upgrade)

$202,000

Total

$683,600

Optional Services:

T&M CEMLI Remediation

$100,000

T&M CEMLI Development

$50,000

Fixed Price Tuning

$75,000

Budgetary Estimate – EBS Financials Phased Oct.

2011 Upgrade & March 2012 Implementation

(16)

References

Related documents

H1-H4: It was hypothesized that students completing the Community and Civic Engagement Minor at Central Connecticut State University would display significantly higher levels

KEY WORDS: addiction care; drug therapy; treatment research; United States; behavior therapy; cognitive therapy; Alcoholics Anonymous; motivational interviewing; treatment

The workflow of the complete process is shown in Figure 1, starting with the metabolic labeling of the samples, combining and digesting them, followed by the LC-MS analysis

The Spaniards initial goals for the Illinois country were very similar to those of the British across the river Spain needed to exercise m ilitary control over

* Corresponding author. E-mail address: [email protected].. Controversial too are the empirical findings on the effectiveness of social learning, once contextual variables and

In the simplest scheme based on the boolean model for retrieval, we retrieve the documents that have occurrences of both good and teacher.. Such

In other cases, synthetic fabrics may be topically treated with chemicals after the manufacturing process (in the same manner as natural fibers such as cotton), or may

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,