A forecasting model of the economic efficiency of data centre construction project
Full text
Figure
Related documents
Funding: Black Butte Ranch pays full coost of the vanpool and hired VPSI to provide operation and administra- tive support.. VPSI provided (and continues to provide) the
Abstract In this paper the well-known minimax theorems of Wald, Ville and Von Neumann are generalized under weaker topological conditions on the payoff function ƒ and/or extended
Considering the unsatisfactory results from averaging difference maps from different sensors to determine a global average, preference was given to the determination of the
For this study, all analyses from the NHANES 2013-2014 survey data were performed using SAS 9.4 (Statistical Analysis System, Cary, NC, USA). The survey data of
We examined the effects of temporal changes on nitrification, denitrification, anammox, and DNRA activities and respective functional gene abundance in subtidal estuarine sediments
Characteristics and Procedures of Process Costing, Costing by Departments, Product Flow, Procedures for materials, Labor and Factory Overhead Costs The Cost of Production
The association between RAI treatment failure and various clinical parameters includ- ing age, sex, height, weight, body mass index (BMI), thyroid gland volume, and isthmus length
Although the waves do not phase lock, positive vorticity centers amplify whenever the cross-equatorial motion of the WMRG wave lies at the same longitude in the upper