ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT PROJECT NAME PORTLAND STATE UNIVERSITY AGREEMENT #
Full text
Related documents
Where the need arises for the extension of the original completion period of the project as stated in the contract-agreement concluded between the owner & the contractor for
Owner and its representatives (including but not limited to third-party auditing consultants, if any) will be afforded reasonable access, at reasonable times, to all
3.7.13 The Architect/Engineer shall prepare Change Orders, with supporting documentation and data, if deemed necessary by the Architect/Engineer as provided in this
10.5 After written acceptance by the Owner of the Design Development Documents and revised estimates of Construction Cost indicating any specific modifications or changes in
Specific developments have been performed for NDE of thick austenitic steel welds, NDE using guided Lamb waves, telemetry from the outside of reactor vessel, imaging of immersed
All services performed by the Designer not identified as Additional Services in Article 5 or in a written Amendment or Agreement entered into by the Owner and
The main results from the benchmark model are that the welfare impact of a small altruis- tic commitment is ambiguous (Propositions 1 and 2), a full commitment is optimal only if
Objective: To use decision analysis to compare the costs associated with minimally invasive parathyroidectomy (MIP) and bilateral neck exploration (BNE) in patients with