The Maintenance Study Highlights

• 83 companies and production plants were examined in detail with reference to their mainte- nance and asset management performance

• The study shows considerable potential for improvement in all industry sectors analysed • Practically proven design ele-

ments on the way to ex cellent value oriented maintenance are presented

• Quick and sustainable imple- mentation results are realisable

(2)

Page 3

PREFACE

Page 4-22

THE MAINTENANCE STUDY Executive summary

Significance of maintenance

Maintenance and asset management as a competitive advantage

Study based on the results of the ConMoto MaintenanceScoreTest©

Graduated model of Maintenance Excellence Status quo in maintenance and asset management

- findings and need for action

The most effective variables - results by approaching Maintenance Excellence

Appendix

Page 23

AUTHORS AND CONTACT PERSONS

Page 24

CON MOTO

Our consultancy approach Our company

PREF

ACE

THE MAINTENANCE STUDY

AUTHORS AND CONT

ACT PERSONS

CON MOTO

_____________________

(3)

Preface

Do you know the feeling? You prepare yourself for a demanding mountain hike, a marathon or a transalpine on your mountain bike. You train, train and train without feeling that you're getting anywhe-re? Good intentions and back-breaking effort alone only lead to the desired level of performance by chance. If you want to reach your best form, however, you initially need a comprehensive performance diagnosis and, building on this, an individually oriented training concept based on specialist knowledge.

Top business performances are achieved with the same approach. Deficits have to be recognised and, meta-phorically speaking, training methods have to be changed. In this study ConMoto is systematically showing the strengths and weaknesses of European companies' maintenance management and is providing field tested pro-ven design elements on the way to excellent value oriented maintenance.

But why is maintenance important at all? If you consider only business assets in production facilities and related machinery out of all investment goods in Europe, you reach a value of around 9.7 trillion euros in 2008. In Ger-many alone the equipment replacement value amounted to about 1.9 trillion euros. If you calculate a cross sector maintenance costs rate of 4.8 % (corresponding to the average value identified in this study), direct maintenance costs in European production locations add up to over 450 billion euros per year! These figures speak for them-selves. Yet maintenance is not only of enormous significance for European enterprises. Our experiences show that maintenance and asset management, particularly sustainability issues, are also increasingly moving to the forefront in the BRIC states, in the Middle East and in many emerging countries. First of all, in order to meet the resulting high quality and cost related requirements of maintenance systems, a comprehensive overview of the issue is needed. And this is exactly where the ConMoto study “Value oriented maintenance – the strategic dimension of the spanner” comes in. 83 companies and production plants from various sectors were analysed in detail - with amazing results.

Reach your individual targets, develop your maintenance activities into sustainable value drivers to increase your competitiveness and stay motivated and active for your success tomorrow.

Yours

Nils Blechschmidt

PREF

ACE

(4)

THe MainTenance STudy

Value oriented maintenance - the strategic dimension

of the spanner

executive summary

The production of a successful company today has to be not only efficient but also organised flexibly and with adaptability. To meet these requirements the searching gaze of many company managers is increasingly focussing on maintenance activities. Justifiably so, because value oriented maintenance and asset management are decisive for cost effectiveness and flexibility in producing goods. The higher the equipment intensity in a production plant is, the greater the impact of maintenance management. Thus at peak more than 60 % of production costs are directly and indirectly influenced by the efficiency of maintenance activities.

In the past few years the ConMoto Consulting Group has thoroughly examined the maintenance activities of 83 companies and production plants in total and has summarised the results in this study. It is clear that many compa-nies are currently a long way from first class maintenance management. If school marks were used, the compacompa-nies examined would get marks only between "poor" and "satisfactory" for their maintenance management systems. To better classify the conditions characterising maintenance systems (maintenance maturity), ConMoto has deve-loped the graduated model of Maintenance Excellence. If you consider the relationship between the total number of points to the maximum number of points possible (corresponding to Maintenance Excellence) the industry ave-rage is only 46 %. The rear light of the study has considerable potential to catch up with a maintenance maturity of merely 32 %. Even the best company at 60 % has plenty of room for improvement. In an overall comparison, surprisingly it was precisely the most investment intensive and security sensitive process industry that is weakest with an average of 43 %. But also the best-in-class industrial area “automotive and mechanical engineering” is only in the midfield of the graduated model with an average of 51 %.

The analysis of maintenance systems shows considerable potential for improvement within the context of value oriented maintenance. The question remains of what to do to exploit this potential as quickly and sustainably as possible. By combining the current need for action and the respective cost-benefits relation of the implementation areas, five variables could be identified in the study that lead to particularly high gains in efficiency in all the sectors examined. Alongside the maintenance strategy these are “in- and outsourcing of services“, “time management/ capacity planning and scheduling“, “process organisation“ and “Key Performance Indicators and costing“. Con-Moto has developed a methodical approach proven in various industries for each of these design elements. It demonstrates an efficient way how companies can holistically drive forward the optimisation of their maintenance systems. The target is Maintenance Excellence.

The results speak for themselves. It was possible to achieve considerable improvement in all Key Performance In-dicators (KPIs). One of the central cost effectiveness KPIs, the maintenance cost rate, was reduced by 23 % for all projects. The effectiveness, measured on the basis of the KPIs “spare parts months of inventory” (-45 %), “Overall Equipment Effectiveness” (+7 %) and “proportion of preventive maintenance” (+155 %), was significantly improved. Regarding order processing management it was possible to optimise the Key Performance Indicators “planning degree” (+40 %) and “urgency rate” (-63 %), thus achieving considerable gains in efficiency.

The figures prove that maintenance processes can be a central value driver for improving efficiency, minimising costs and for reducing capital requirements, thus increasing the Return on Captial. By systematically optimising these factors companies can use a decisive lever to position themselves even more successfully in the global competition.

(5)

The individual development levels of the model are clearly defined by the 360 status descriptions of the MaintenanceScoreTest© and are outlined briefly below:

Level 1 "Wooden spoon" • Maintenance is disorganised

• Maintenance processes are not sufficiently defined Level 2 “Stragglers“

• Strongly reactive maintenance

• "Fire-fighting activities" are still predominate Level 3 “Lower midtable"

• Proactive maintenance strategy

• Lean principles are basically applied (focus on Overall Equipment Effectiveness, minimising waste, first Key Performance Indicators and visualisation, etc.)

Level 4 “upper midtable"

• All maintenance processes are linked and support each other (there are no more system gaps) • Maintenance processes are controlled in a target-oriented manner and optimised effectively Level 5 “Leaders“

• The entire plant life cycle is considered

• Direct and indirect maintenance costs are recorded and evaluated systematically • Maintenance and asset management are improved consistently and continuously Level 6 “innovators“

• Orientation not only towards life cycle costs but also on functionality of plant and machinery

• The control loop between operators and plant manufacturers is established and preventive maintenance is driven forward innovatively

9

Degree of maintenance and asset managment

Level 6

Wooden spoon Stragglers Lower midtable Upper midtable Leaders Innovators

Bringing up the rear Midtable Leading group

Classification in development levels

Efficiency profile process industry

Reactive Proactive Integration of all relevant processes Life Cycle Asset Management Life Cycle Asset Innovation Disorganised Level 1 Level 2 Level 3 Level 4 Level 5

Efficiency profile automotive and engineering Efficiency profile other industries

1 2 3 4 5 6 7 8 9 10 11 12

Worst Case Maintenance Excellence

Best other industries Worst other industries Worst

Case MaintenanceExcellence Worst

Case MaintenanceExcellence Worst

Case MaintenanceExcellence

Best automotive and engineering industry Best process industry

Worst process industry Worst automotive and engineering industry

In- and outso urcing of Services in crease O.E.E. Structure Indicators Key Performance Maintenance 0 2 4 6 8 10 12 In- and outso urcing of Services I T-To ol s increase O.E.E. Structure W orkplace and work flow P la nn in g a nd s ch ed ulin g Processes Measu res to Costing Indicators Key Perfo rmance Maintenance strategy Staff Spare part manag emen t 0 2 4 6 8 10 12 development I T-To ol s W orkplace and work flow P la nn in g a nd s ch edulin g Costing strategy Staff Spare part manag emen t development Processes Measu res to Maintenance I T-To ol s W orkplace and work flow P la nning a nd sch ed ulin g Costin g strategy Staff Spar e part managem ent development In- and outso urcing of Services increase O .E.E. Structure Measu res to Indicators Key Perfo rmance 2 4 6 8 10 12 0 12 0 12 0 12

Figure 7: Classification of companies according to Maintenance Excellence graduated model

To better classify the conditions characterising maintenance systems (maintenance maturity), ConMoto has deve-loped the graduated model of Maintenance Excellence (Figure 7).

(6)

Facts and figures Project tasks Project results

Reference project automotive and engineering „Risk and Reliability Based

Maintenance Strategy“ at a leading commercial vehicle manufacturer

Industrial sector: automotive industry Number of staff: approx. 2500 Number of plants: 1

Highly linked assembly system

Maintenance costs Processing centres Overall Equipment Effectiveness (O.E.E.) Maintenance costs +9 %-Points -15 % +15 % -18 % Assessment of maintenance efficiency on the

basis of the ConMoto MaintenanceScoreTest©

Developing and implementing a risk and availability driven maintenance strategy to

systematically reduce faultsand optimise

maintenance costs in the gearbox assembly and processing centres

Technical availability

Degree of maintenance and assetmanagment

Level 6

Wooden spoon Stragglers Lower midtable Upper midtable Leaders Innovators Bringing up the rear Midtable Leading group

Reactive Proactive Integration of all relevant processes Life Cycle Asset Management Life Cycle Asset Innovation Disorganised Level 1 Level 2 Level 3 Level 4 Level 5 1 2 3 4 5 6 7 8 9 10 11 12

Worst Case Maintenance Excellence after

71% before

36%

appendix

Reference project success by approaching Maintenance excellence

2

1

Reference project process industry – „Maintenance Excellence“

in three main plants of a well known chemical company

-21 %

-20 %-Points +30 %

Facts and figures Project tasks Project results

Identification of the main variables to increase efficiency of maintenance activities Developing and implementing a risk and availability driven maintenance strategy Introducing KPIs

Setting up an order management system with more efficient schedule and expenditure planning

Building up an optimised stock management system

Strengthening autonomous maintenance by operations personnel

Implementing a systematic contractor management system Industrial sector: process industry

Number of staff: approx. 3000 Number of plants: 3

Maintenance cost rate Fault related plant down-time Urgency rate Planning degree Turnover frequency of spare parts -30 to 40 % +30 %-Points

Degree of maintenance and assetmanagment

Level 6

Wooden spoon Stragglers Lower midtable Upper midtable Leaders Innovators Bringing up the rear Midtable Leading group

Reactive Proactive Integration of all relevant processes Life Cycle Asset Management Life Cycle Asset Innovation Disorganised Level 1 Level 2 Level 3 Level 4 Level 5 1 2 3 4 5 6 7 8 9 10 11 12

Worst Case Maintenance Excellence after

73% before

(7)

Assessment of maintenance efficiency on the

basis of the ConMoto MaintenanceScoreTest©

Developing and implementing a systematic maintenance KPI system and visualisation Implementing optimal maintenance strategies at component level

Capacity planning and organisation adjust-ment

Systematic contractor management Definition of target procurement process and indroducing an efficient spare parts manage-ment system

Facts and figures Project tasks Project results

Reference project other industries - „Lean Maintenance“

at a special tool manufacturer

Industrial sector: high precision technology Number of staff: approx. 600

Real net output ratio: approx. 70 %

Overall Equipment Effectiveness (O.E.E.)

Plant productivity Maintenance cost rate Spare parts inventory

+20 % +25 % -15 % -40 %

Degree of maintenance and assetmanagment

Level 6

Wooden spoon Stragglers Lower midtable Upper midfield Leaders Innovators Bringing up the rear Midtable Leading group

Reactive Proactive Integration of all relevant processes Life Cycle Asset Management Life Cycle Asset Innovation Disorganised Level 1 Level 2 Level 3 Level 4 Level 5 1 2 3 4 5 6 7 8 9 10 11 12

Worst Case Maintenance Excellence after 72% before 36%

2

2

The pages 5 to 8 and 10 to 20 are not included in this preview. Should you be interested in the whole study VALUE ORIEN-TED MAINTENANCE - THE STRATEGIC DIMENSION OF THE SPANNER, please contact:

Melanie Sauer

Communication Manager

ConMoto Consulting Group GmbH Boschetsrieder Str. 69 81379 München Deutschland Telefon +49 (0)89 780 66-138 Fax: +49 (0)89 780 66-101 Email: [email protected]

© 2011 ConMoto Consulting Group GmbH. All rights reserved. For repeat orders and reprinting authorisation

please contact: ConMoto Consulting Group GmbH Boschetsrieder Str. 69 81379 Munich Germany Tel. +49 (0)89 780 66-138 Fax: +49 (0)89 780 66-101 Email: [email protected]

(8)

2

3

authors

Nils Blechschmidt has been a management consultant since 1995 at ConMoto Consulting Group GmbH and since 2002 he is a Senior Partner and shareholder of the company. He is responsible for the field of "Maintenance Excellence". As an expert in this area and with well-founded knowledge of various sectors, such as the aerospace industry, engineering and plant construction, the car and component supplier industry, process industry (chemi-cals, steel, semi-conductors, pharmaceuti(chemi-cals, food), plastics processing industry and transport technology, he gives numerous lectures. Since 1997 he has been a lecturer at various specialist forums with a focus on Main-tenance Excellence and Lean Production. Before his time at ConMoto, Nils Blechschmidt was employed as the Technical Head of an aircraft maintenance business for seven years. He completed his education as a Dipl.-Ing. (graduate engineer) in aerospace technology at the University of the Bundeswehr in Munich and gained his MBA at Henley Management College (UK).

Markus März is the Director Business Development of ConMoto Consulting Group GmbH. Since joining ConMoto in 2003 he had worked as a management consultant and lastly as a project manager, dealing with controlling and finance issues, restructuring, value oriented corporate development as well as lean production and maintenance. Before his time at ConMoto, Markus März was employed as an Analyst Private Equity, primarily in due diligence & corporate valuation, at a listed holding and restructuring company. He completed his education as a Dipl.-Kfm. (graduate in business administration) and BSc at the University of Augsburg.

Dr. Leonhard Weck is a managing partner of ConMoto Consulting Group GmbH. After a twelve year career as a military officer in various applications he was employed at Bosch Siemens Hausgeräte GmbH in Munich for two years with responsibility for brown goods logistics. In 1990 he was one of the three founders of the ConMoto Consulting Group. He was involved in building up the company as a managing partner for over four years. In 1994 he founded the management consultancy Agamus Consult within the Otto Wolff von Amerongen group of companies and ran the consultancy as managing partner until 2001. Subsequently he took over the management of the newly-founded Agamus Holding GmbH as managing partner. Under the roof of this company he founded three further companies in the areas of data transaction and information logistics. These companies include what is Crossgate AG today, which has since become one of the largest data transaction platforms in the B2B area. After the death of Otto Wolff von Amerongen, Dr. Weck left the group at the beginning of 2009 and since then he has again a leading management position in the ConMoto Consulting Group.

(9)

WWW

.CONMOTO.DE

WWW

.CONMOTO-CONSUL

TING.COM

Our consultancy

approach

We create advantage!

This is the guiding approach of our consultancy.

Implementation decides whether a project is successful. Therefore, speed, pragmatism and implementa-tion strength distinguish ConMoto’s work. The decisive basis is formed by an expert and target oriented analysis as well as a solid and realistic concept. To achieve this we combine innovative concepts with the knowledge of what is feasible.

Our company

The ConMoto Consulting Group has been supporting companies for more than 20 years to secure and improve their competitiveness and sustainabili-ty. Around 80 consultants, distributed across our offices in Munich, Stutt-gart, Vienna, St. Gallen, Bratislava and Shanghai, work competently and with commitment to realise the best possib-le benefits for our clients.

Our consultants’ high qualifications, supplemented by many years of pro-fessional experience, guarantee the pronounced implementation skill that is necessary to realise the solution concepts we develop together with our clients. Efficient structures and processes, strong innovation skills, ef-fective management systems and the sustainable mobilisation of staff are the project targets in the context of a pio-neering strategy.

ConMoto Consulting Group GmbH, Munich Boschetsrieder Str. 69 81379 Munich Germany Tel.: +49 (0)89 780 66-0 Fax: +49 (0)89 780 66-100/-101 ConMoto Consulting Group GmbH, Stuttgart Gerokstr. 11 70184 Stuttgart Germany Tel.: +49 (0)711 767 79-0 Fax: +49 (0)711 767 79-205 ConMoto Consulting Group Ges.m.b.H, Vienna Schottenring 16 1010 Vienna Austria Tel.: +43 (0)1 585 0 274-0 Fax: +43 (0)1 585 0 274-11 ConMoto Consulting Group GmbH, St. Gallen Notkerstr. 10 9000 St. Gallen Switzerland Tel.: +41 (0)71 244 08 71 Fax: +41 (0)71 243 18 81

ConMoto Consulting Group GmbH, Shanghai

Unit 1606, Time Square 93 Huai Hai Zhong Rd. 200021 Shanghai People’s Republic of China Tel.: +86 (0)21 6141 5275 Fax: +86 (0)21 6141 5276 ConMoto Consulting Group, Agamus Consult, Bratislava Na vršku 8 811 01 Bratislava Slovakia Tel.: +421 (0)2 5441 3304 Fax: +421 (0)2 5441 0635 Email: [email protected] Web: www.conmoto.de www.conmoto-consulting.com Dr. rer. pol. Leonhard Weck

Dr.-Ing. Ralf Feierabend

Prof. Dr.-Ing. Andreas R. Voegele

Management

References

Related documents

In view of fact that the implementation of Think Aloud Pair Problem Solving (TAPPS) strategy in teaching reading as the teaching strategy, has been proved to be more effective

Running MapReduce on Amazon Elastic MapReduce Example 1: Streaming Work Flow with AWS Management Console Example 1 - Add up integers. What was that comment earlier about an

If the values for blood volume are related to ideal weight, the data show that blood volume is wasted to a certain extent.. Blood viscosity: Increased blood viscosity is one of

Results further indicate that migrating to XML-based authority and bibliographic records, applying controlled-vocabulary tools such as Simple Knowledge Organizations Systems (SKOS)

By default, PHP stores session data in files on disk – this storage method works well and does not depend on any external system, as long as requests coming from a single user

We considered two types of configuration fea- tures: the retrieval model and four parameters related to query expansion (the expansion model, the number of documents used

characterized by a smooth contour, the possibility of gearing with a minimum number of teeth (including single and double gears) without the risk of trimming the profile

More generally, whenever the prevalence of the target interaction is high and the data is sparse, Random Intersection Trees tends to perform quite well. To speed up evaluation of