Ontario Ministry of the Environment and Climate Change - Record of Site Condition # 216766

Record of Site Condition

Under Part XV.1 of the Environment Protection Act

Summary

Notice to Readers Concerning Due Diligence

This record of site condition has been filed in the Environmental Site Registry to which the public has access and which contains a notice advising users of the Environmental Site Registry who have dealings with any property to consider conducting their own due diligence with respect to the environmental condition of the property, in addition to reviewing information in the Environmental Site Registry.

Contents of this Record of Site Condition

This record of site condition consists (RSC) of this document which is available to be printed directly from the Environmental Site Registry as well as all supporting documentation indicated in this RSC to have been submitted in electronic format to the Ministry of the Environment and Climate Change.

Record of Site Condition Number 216766

Date Filed to Environmental Site Registry 2015/02/09

Certification Date 2014/11/20

Current Property Use Community

Intended Property Use Institutional

Certificate of Property Use Number No CPU

Applicable Site Condition Standards** ESA Phase 1

Property Municipal Address 0 MOULIN ROUGE CRESCENT,

MISSISSAUGA, ON, L5V 1R6

1 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(2)

PART 1: PROPERTY OWNERSHIP, PROPERTY INFORMATION AND OWNER'S CERTIFICATIONS

Information about the owner who is submitting or authorizing the submission of the RSC

Owner Name MAKKAH HOLDINGS INC. Authorized Person MOHAMMAD QAZI

Mailing Address 935 EGLINTON AVENUE WEST, MISSISSAUGA ONTARIO, CANADA

Postal Code L5V 1R6

Phone (416) 939-0931

Fax

Email Address mqazi@masjidfarooq.com

Information about the agent

Agent Name PAUL WILSON

Mailing Address 3, 1705 ARGENTIA ROAD, MISSISSAUGA ONTARIO, CANADA

Postal Code L5N 3A9

Phone (416) 657-2367

Fax (416) 657-2367

Email Address pwilson@aeonegmond.com

2 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(3)

RSC Property Location Information

Municipal Address(es) 0 MOULIN ROUGE CRESCENT, MISSISSAUGA, ON L5V 1R6 Municipality Mississauga

Legal Description See Attached Lawyer’s Letter Assessment Roll Number(s) 210504009675716000007 Property Identifier Number(s) 13508-0007 (LT)

RSC Property Geographical References

Coordinate System UTM

Datum NAD 83

Zone 17

Easting 606,848.00

Northing 4,826,792.00

RSC Property Use Information

The following types of property uses are defined by the Regulation: Agricultural or other use, Commercial use, Community use, Industrial use, Institutional use, Parkland use, and Residential use.

Current Property Use Community Intended Property Use Institutional Certificate of Property

Use has been issued under section 168.6 of the EPA

No

3 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(4)

Please See the Signed Statements of Property Owner, or Agent, or Receiver at the End of this RSC

The rest of this page has been left intentionally blank

4 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(5)

PART 2: LIST OF REPORTS, SUMMARY OF SITE CONDITIONS AND QUALIFIED PERSON’S STATEMENTS AND CERTIFICATIONS

Qualified Person's Information

Name PAUL WILSON

Type of Licence Under Professional Engineers Act

Licence

Licence Number 50487602

QP Employer Name AEON EGMOND LTD.

Mailing Address 3, 1705 ARGENTIA ROAD, MISSISSAUGA ONTARIO, L5N 3A9 CANADA

Phone (416) 657-2367

Fax (416) 657-2367

Email Address pwilson@aeonegmond.com

Municipal Information

Local or Single-Tier Municipality

Mississauga

Upper-Tier Municipality Peel

Ministry of the Environment and Climate Change District Office

District Office Halton-Peel District Office

District Office Address 4145 North Service Road, Suite 300, Burlington ON L7L 6A3

5 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(6)

Phase One Environmental Site Assessment Report

Document used as the phase one environmental site assessment report and updates in submitting the RSC for filing

The date the last work on all of the records review, interviews and site reconnaissance components of the phase one environmental site assessment was done (refer to clause 28(1)(a)

of O. Reg. 153/04)

(YYYY/MM/DD) 2014-11-20

Type of

Report Report Title

Date of Report (YYYY/MM/DD) Author of Report Name of Consulting Company

P1 ESA Phase I Environmental Site Assessment 935 Eglinton Avenue West and 0 Moulin Rouge Crescent, Mississauga, Ontario

2014-11-20 Charna Kozole and Paul Wilson

AEON EGMOND LTD.

Reports and Other Documents Related to the Phase One Environmental Site Assessment

Reports and other documents relied upon in certifying the information set out in section 10 of Schedule A or otherwise used in conducting the phase one environmental site assessment

Report Title Date of Report

(YYYY/MM/DD)

Author of Report

Name of Consulting Company

Phase I Environmental Site Assessment - Final 935 Eglinton Avenue West and 0 Moulin rouge Crescent, Mississauga, Ontario

2012-06-15 Harinder Singh and Muhammad Shahid

exp Services Inc.

6 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(7)

Site Condition Information

Certification date (YYYY/MM/DD) 2014/11/20

Total area of RSC property (in hectares) 0.30000

Number of any previously filed RSC that applies to any part of the RSC property Number of any previously filed Transition Notice that applies to any part of the RSC property

Soil brought from another property to this RSC property to remain there following the filing of the RSC?

No

7 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(8)

Qualified Person’s Statements and Certifications

As the qualified person, I certify that:

A phase one environmental site assessment of the RSC property, which includes the evaluation of the information gathered from a records review, site reconnaissance, interviews, a report and any updates required, has been conducted in accordance with the regulation by or under the supervision of a qualified person as required by the regulation.

As of 2014/11/20, no phase two environmental site assessment is required by the regulation for the

RSC property and based on the phase one environmental site assessment for the RSC property, in my opinion, it is not necessary for any other reason to conduct a phase two environmental site assessment for the RSC property.

As of 2014/11/20, in my opinion, based on the phase one environmental site assessment, there is no

evidence of any contaminants in the soil, ground water or sediment on, in or under the RSC property that, if the RSC property were put to any of the types of property uses listed in subsection 1 (2) of the regulation, are likely to

interfere with any of those types of property uses.

I am a qualified person and have the qualifications required by section 5 of the regulation. I have in place an insurance policy that satisfies the requirements of section 7 of the regulation.

I acknowledge that the RSC will be submitted for filing in the Environmental Site Registry, that records of site condition that are filed in the Registry are available for examination by the public and that the Registry contains a notice advising users of the Registry who have dealings with any property to consider conducting their own due diligence with respect to the environmental condition of the property, in addition to reviewing information in the Registry.

The opinions expressed in this RSC are engineering or scientific opinions made in accordance with generally accepted principles and practices as recognized by members of the environmental engineering or science profession or discipline practising at the same time and in the same or similar location.

I do not hold and have not held and my employer AEON EGMOND LTD.

does not hold and has not held a direct or indirect interest in the RSC property or any property

which includes the RSC property and was the subject of a phase one or two environmental site assessment or risk assessment upon which this record of site condition is based

To the best of my knowledge, the certifications and statements in this part of the RSC are true as of 2014/11/20. By signing this RSC, I make no express or implied warranties or guarantees.

By checking the boxes above, and entering my membership/licence number in this submission, I, PAUL WILSON, a qualified person as defined in section 5 of O. Reg. 153/04 am, on 2015/02/06:

a) signing this record of site condition submission as a qualified person; and

b) making all certifications required as a qualified person for this record of site condition. I Agree

8 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(9)

Additional Documentation Provided by Property Owner or Agent

The following documents have been submitted to the Ministry of the Environment and Climate Change as part of the record of site condition

Certificate of Status or equivalent for the owner Authorization for Agent to submit RSC for filing

Lawyer’s letter consisting of a legal description of the property

Copy of any deed(s), transfer(s) or other document(s) by which the RSC property was acquired A Current plan of Survey

Table of Current and Past Uses of the Phase One Property Phase 1 Conceptual Site Model

Owner or agent certification statements

5.2.6

9 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(10)

10 of 10 Filed Record of Site Condition # 216766 on 2015/02/09

(11)

Request ID: 017302322 Province of Ontario Date Report Produced: 2015/02/06

Demande n° : Province de l'Ontario Document produit le :

Transaction ID: 56702479 Ministry of Government Services Time Report Produced: 09:59:16 Transaction n° : Ministère des Services gouvernementaux Imprimé à :

Category ID: CT Catégorie :

CERTIFICATE OF STATUS

ATTESTATION DU STATUT JURIDIQUE

This is to certify that according to the

D'après les dossiers du Ministère des

records of the Ministry of Government

Services gouvernementaux, nous attestons

Services

que la société

M A K K A H H O L D I N G S I N C .

Ontario Corporation Number

Numéro matricule de la société (Ontario)

0 0 1 7 3 0 6 2 8

is a corporation incorporated,

est une société constituée, prorogée ou née

amalgamated or continued under

d'une fusion aux termes des lois de la

the laws of the Province of Ontario.

Province de l'Ontario.

The corporation came into existence on

La société a été fondée le

M A R C H 3 0 M A R S , 2 0 0 7

and has not been dissolved.

et n'est pas dissoute.

Dated

Fait le

F E B R U A R Y 0 6 F É V R I E R , 2 0 1 5

Director

Directeur

The issuance of this certifcate in electronic form is authorized by the Ministry of Government Services.

(12)
(13)
(14)
(15)
(16)

Phase I and RSC

Property Boundary

(red)

(17)

"TABLE OF CURRENT AND PAST USES OF THE PHASE ONE PROPERTY" (Refer to clause 16(2)(b), Schedule D, O. Reg. 153/04)

Year(s) Name of Owner Description of Property Use Property Use

Other Observations from Aerial Photographs,  Fire Insurance Plans, Etc.

1820 Timothy Street Farmland/Vacant Agriculture or  No records available

1820 William Smith Farmland/Vacant Agriculture or 

other use No records available

1821 Hugh Carfrae Farmland/Vacant Agriculture or 

other use No records available

1825 Thomas Sibbald Farmland/Vacant Agriculture or 

other use No records available

1839 John Sibbald Farmland/Vacant Agriculture or 

other use No records available

1909 William John Coulter Farmland/Vacant Agriculture or 

other use No records available

1912 Charles Watson Farmland/Vacant Agriculture or 

other use No records available

1912 George Stegall Farmland/Vacant Agriculture or 

other use No records available

1928 Edward Stegall Farmland/Vacant Agriculture or 

other use No records available

1949 Robert Stewart Farmland/Vacant Agriculture or 

other use

From 1946 aerial photograph, site appears to be 

a field, possibly farm land. No other records are 

available

1969 Labreiss Investments Limited Farmland/Vacant Agriculture or 

other use

From 1960 and 1969 aerial photographs, site 

appears to be a field, possibly farm land. No 

significant changes from 1946 aerial photograph. 

No other records are available

1972 Arosa Properties Limited Farmland/Vacant Agriculture or 

other use

From 1960 and 1969 aerial photographs, site 

appears to be a field, possibly farm land. No 

significant changes from 1946 aerial photograph. 

No other records are available 1973

Irber Holdings Litmited, Damis 

Holdings Limited and Sabel 

Holdings Limited

Farmland/Vacant Agriculture or 

other use

From 1960 and 1969 aerial photographs, site 

appears to be a field, possibly farm land. No 

significant changes from 1946 aerial photograph. 

(18)

"TABLE OF CURRENT AND PAST USES OF THE PHASE ONE PROPERTY" (Refer to clause 16(2)(b), Schedule D, O. Reg. 153/04)

Year(s) Name of Owner Description of Property Use Property Use

Other Observations from Aerial Photographs,  Fire Insurance Plans, Etc.

1990 Eglinton‐SecondLine Investments 

Limited Farmland/Vacant

Agriculture or 

other use

From 1976, 1980 and 1988 aerial photographs, 

site appears to be a field, possibly farm land. No 

significant changes from 1969 aerial photograph. 

No other records are available

1996 Trezal Homes Limited Vacant Community

From 1976, 1980 and 1988 aerial photographs, 

site appears to be a field, possibly farm land. No 

significant changes from 1969 aerial photograph. 

No other records are available

2007 Franton Homes Incorporated Vacant Community

From 2006 and 2007 aerial photographs, site is 

clearly visible, as cleared vacant land. No other 

records are available 2008 to 

Present Makkah Holdings Incorporated Vacant Community

From 2006 and 2007 aerial photographs, site is 

clearly visible, as cleared vacant land. From 2009 

aerial photograph, site appears to have had a 

gravel surface added. No other records are 

(19)

Phase I Environmental Site Assessment

Conceptual Site Model

0 Moulin Rouge Crescent, Mississauga,

Ontario

Prepared by:

AEL environment (a division of Aeon Egmond Ltd.)

1705 Argentia Road, Unit 3,

Mississauga, ON, L5N 3A9

Telephone and Facsimile: (416) 657-2367

January 9, 2015

(20)

Masjid Al-Farooq Islamic Centre

January 9, 2015

10577a – Phase I ESA – 0 Moulin Rouge Cres., Mississauga, ON

Page i

I.

Table of Contents

1.

Phase One Conceptual Site Model (CSM) ... 1

1.1

Phase I Environmental Site Assessment ... 1

1.2

Areas of Potential Concern... 2

1.3

Contaminants of Potential Concern ... 3

1.4

Effects of Underground Utilities ... 3

1.5

Geological and Hydrogeological Conditions ... 3

1.6

Uncertainties ... 4

II.

Tables

Table 1

Properties and Property Uses Within the Phase One Study Area

III.

Figures

Figure 1

Phase I Site and Study Area

(21)

Masjid Al-Farooq Islamic Centre

January 9, 2015

10577a – Phase I ESA – 0 Moulin Rouge Cres, Mississauga, ON

Page 1

1.

Phase One Conceptual Site Model (CSM)

1.1

Phase I Environmental Site Assessment

A Phase I ESA was conducted by AEL, as reported to the Client in January, 2015. Figure 1 shows the Phase I study area. The Site consisted of the property located at 0 Moulin Rouge Crescent, Mississauga (herein referred to as “the Site”), consisting of gravel covered land. A mix of residential, community and commercial lands surrounded the Site. Figure 2 outlines the site and surrounding property addresses. Table 1 outlines current property owners within the Phase I study area, and the property use as determined during the site walk over.

The Site was operational at the time of the Site walk over, consisting of gravel covered land. The Site periodically functions as overflow parking for the neighbouring property to the north east (Masjid Al-Farooq Islamic Centre). Driveway access was from the north east. A fence line was present around portions of the property.

A titles search and city directory search indicate that the property was first developed around the late 1960’s for residential use, and in the late 2000’s for its current use. National Air Photo Library (NAPL) aerial photos show clear evidence of development on the Site by 1969. Prior to this period, the Site was likely farmland, vacant prior to the 1800s, with signs of initial development by the 1960’s. Surrounding lands were developed around the same time.

The future use of the Site is intended to be an institutional development. On the basis of the reviewed materials and documents it is the opinion of the Qualified Person that there are currently no environmental liabilities at the Site as of the report date and the Site is suitable for institutional property use.

Table 1 Properties and Property Uses Within the Phase One Study Area

Property Address Occupant as of Report

Date Property Use (As Determined During Site Walk Over)

0 Moulin Rouge Cres. (Site) Masjid Al-Farooq Islamic

Centre Community

935 Eglinton Ave. W. (north east of the

site) Masjid Al-Farooq Islamic Centre Community 983 Eglinton Ave. W. (south west of

site) Toemar Garden Supplies and Firewood Commercial 5026, 5028, 5030, 5032, 5034 and

(22)

Masjid Al-Farooq Islamic Centre

January 9, 2015

10577a – Phase I ESA – 0 Moulin Rouge Cres, Mississauga, ON

Page 2

Table 1 Properties and Property Uses Within the Phase One Study Area

Property Address Occupant as of Report

Date Property Use (As Determined During Site Walk Over)

5033, 5035, 5037 and 5039 Moulin

Rouge Cres. Private Residences Residential 5036, 5038, 5040 and 5042

Warwickshire Way Private Residences Residential 1051, 1053, 1055, 1057, 1059, 1061,

1063 and 1065 Felicity Cres. Private Residences Residential 1048 – 1058 Felicity Cres. (north east

of site) Private Residences Residential 4657, 4659, 4663 and 4665 Wayside

Crt. Private Residences Residential 4660, 4662 and 4664 Wayside Crt. Private Residences Residential 4678, 4680 and 4682 Penhallow Rd. Private Residences Residential 4649, 4651, 4653, 4655, 4657, 4659,

4661 and 4663 Penhallow Rd. Private Residences Residential 4640, 4642, 4646 and 4648 Penhallow

Rd. Private Residences Residential

1.2

Areas of Potential Concern (APC)

No APC were identified on site during the Phase I ESA. At the time of reporting, the land use type at the Site is community. The Site was operational as periodic overflow parking for the neighbouring property to the north east (Masjid Al-Farooq Islamic Centre), with the client preparing to change the property use to institutional. A titles search, city directory search and interviews indicate that the property was first developed around the mid to late-1960’s as a residence. It was first developed for its current use in the late 2000’s. National Air Photo Library (NAPL) aerial photos show clear evidence of development on Site by 1969. Prior to this period, NAPL aerial photos show the site as likely farmland in 1946 and 1960. Prior to this, no information is available, but the Site was likely farmland, vacant prior to the 1800s, with signs of initial development by the mid to late-1960’s. Aerial photographs and a city directory search indicate surrounding lands were developed around the same time.

(23)

Masjid Al-Farooq Islamic Centre

January 9, 2015

10577a – Phase I ESA – 0 Moulin Rouge Cres, Mississauga, ON

Page 3

No staining was observed during the site walk over.

1005 Eglinton Avenue West, located adjacent to the south west side of the Site, was operational as a commercial garden centre at the time of the Site walk over. Records reviewed indicate that the garden centre was a limited vendor of pesticides at one time. This would be considered a potentially contaminating activity (PCA). However, this property is located down-gradient to the Site with respect to the inferred local and regional groundwater flow in an area of soils with low permeability. Based on this the property is not considered a potential impacting source to the RSC property.

1.3

Contaminants of Potential Concern (COPC)

No COPC were identified on site during the Phase I ESA.

1005 Eglinton Avenue West, located adjacent to the south west side of the Site, was operational as a commercial garden centre at the time of the Site walk over. Records reviewed indicate that the garden centre was a limited vendor of pesticides at one time. Pesticides would be considered a COPC. However, this property is located down-gradient to the Site with respect to the inferred local and regional groundwater flow in an area of soils with low permeability. Based on this the property is not considered a potential impacting source to the RSC property.

1.4

Effects of Underground Utilities

At the time of the investigation there were no subsurface structures present on site. The site is not service by telephone, gas, hydro or water. A catch basin was located near the east side of Moulin Rouge at the north edge of the Site. This catch basin is believed to be connected to sewer lines along Moulin Rouge Crescent, away from the Site. Residential properties are north of the site so no contaminants of concern from this direction are anticipated.

1.5

Geological and Hydrogeological Conditions

1.5.1

Topography

The OBM map updated between 1978 and 1995 shows the Site at an approximate elevation of 175 m above sea level (asl). The closest visible body of water is a tributary of Mary Fix Creek, located approximately 330 m north of the Site, which is connected to the Credit River and Lake Ontario. The local site topography is almost flat with a slight slope towards the south and Etobicoke Creek.

1.5.1

Physiography

The regional physiography is dominated by the South Slope. Lying between the Iroquois Plain and Peel Plain, it occupies about 2400 square kilometers, extending from the Niagara escarpment to the Trent River.

(24)

Masjid Al-Farooq Islamic Centre

January 9, 2015

10577a – Phase I ESA – 0 Moulin Rouge Cres, Mississauga, ON

Page 4

AEL did not undertake a geotechnical investigation of the Site. Upon review of the Ministry of Northern Development and Mine’s “Surficial Geology” layer from OGSEarth, the surficial soils consist of clay to silt-textured till, derived from glaciolacustrine deposits or shale. AEL reviewed the Canada Land Inventory, and found the Site soils are predominately Chinguacousy Clay Loam, characterized by high runoff potential and low infiltration rates, due to the clay components. These materials will resist the infiltration of fluids.

1.5.1

Geology

Upon review of the Ministry of Northern Development and Mine’s “Bedrock Geology” layer from OGSEarth, the bedrock consists of Georgian Bay, Blue Mountain and Billings Formations, Collingwood Member and Eastview Member (shale, limestone, dolostone and siltstone) of the Phanerozoic, Paleozoic, Ordovician, Upper Ordovician eras. The depth to bedrock is anticipated to be less than 25 meters, based on information gleaned from MOE water well records for four (4) wells located within the Phase One study area.

1.5.1

Fill Materials

During the Site walkover AEL observed gravel fill over the entire Site. Fill appeared to be for surface cover only, with no staining visible.

1.5.1

Water Bodies and Areas of Natural Significance

The closest visible body of water is a tributary of Mary Fix Creek, located 330 m north of the Site. It is connected to the Credit River, which drains into Lake Ontario.

1.6

Uncertainties

Uncertainty or absence of information obtained regarding all spills and the presence, or not, of any above-or-underground tanks on neighbouring Sites in each of the components of the phase one environmental site assessment could affect the validity of the CSM. Due to the predominantly residential and new nature of surrounding developments the presence of tanks that could affect the site on surrounding lands is minimal.

(25)

Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Source:

Eglington Ave Mosque

Phase 1 Drawings

Site Plan - Study Area

Notes:

0 30 60 Meters

¯

^

0 2 km

Ontario Ministry of Natural Resources 0 Moulin Rouge Cres

Mississauga, Ontario #10577

Legend

Roads Study Area (250 m) Site Boundary Eglin gton A ve W Wain scot Dr Mou lin R ouge C res Warw ickshire W ay Penh allow Rd Way side Ct Felicity C t

Figure 1

(26)

Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Source:

Eglington Ave Mosque

Phase 1 Drawings

Surrounding Addresses

Notes: 0 10 20 Meters

¯

^

0 2 km

Ontario Ministry of Natural Resources 0 Moulin Rouge Cres

Mississauga, Ontario #10577

Legend

Roads Site Boundary Surrounding Parcels 4648 4646 4642 4640 46494651 465346554657 46594661 4663 4664 4662 4660 4678 4680 4682 4665 4663 4659 4657 104810501052 105410561058 105110531055 1057105910611063 1065 5033 5035 5037 5039 5042 50405038 5036 5026 5028 5030 5032 5034 5036 93 5 983 Eglin gton A ve W Wainsc ot Dr Mou lin R ouge C res Warwicksh ire W ay Penh allow Rd Waysi de Ct Felici ty Cres 0 Infe rred GW Flo w

(Commercial)

(Community)

Figure 2

Figure

Updating...

References

Updating...

Related subjects :