Installation Fire Stopping For: Installation Fire Stopping For:
a.
a. uPVC, uPVC, PPR PPR pipes:pipes:
1. uPVC, PPR pipes smaller than 50mm. 1. uPVC, PPR pipes smaller than 50mm.
2. uPVC, PPR pipes from 50mm up to 160mm. 2. uPVC, PPR pipes from 50mm up to 160mm. 3. uPVC pipes over 160mm.
3. uPVC pipes over 160mm. b.
b. Metal pMetal pipes ipes and and air duct.air duct. c.
c. Electrical Electrical conduits.conduits. d.
d. Electric trunkElectric trunking, cabing, cable trayle tray, ladder., ladder. e.
e. Busduct Busduct system.system.
01/12/08
01/12/08 FIRST ISSUEFIRST ISSUE C.T.PC.T.P -.-.--.-.- L.Q.KL.Q.K J.R.PJ.R.P
A A
1. General: 1. General:
Items: - The Method Statement For Fire Stopping Works Items: - The Method Statement For Fire Stopping Works 2. Aim:
2. Aim:
The objectives is to describe Fire Stopping Works associated with installation The objectives is to describe Fire Stopping Works associated with installation of M&E services in compliance with
of M&E services in compliance with the contract specification, approved shopthe contract specification, approved shop drawings, combine and coordinated all services and structural penetration drawings, combine and coordinated all services and structural penetration shop drawings.
shop drawings. 3.
3. Scope Scope of of Works:Works:
This method statement covers work related to all M&E works of the SAIGON This method statement covers work related to all M&E works of the SAIGON M&C TOWER Project.
M&C TOWER Project. 4. Installation:
4. Installation: a.
a. uPVC, uPVC, PPR PPR pipes:pipes:
For pipe smaller than 50mm: Use Fire SealantFor pipe smaller than 50mm: Use Fire Sealant -
- Clean Clean the the pipe.pipe. -
- Fill Fill rockwool rockwool to to sleeve sleeve (Sleeve (Sleeve size size follow follow table table 1).1). -
- Apply Apply fire fire sealant.sealant. -
- Smooth Smooth fire fire sealantsealant -
- Install Install G.I G.I sheet sheet 0.8mm 0.8mm thk thk - - If If the the pipes pipes exposed exposed ceiling.ceiling.
Table 1: Sleeves Size for Pipes smaller than 50mm Table 1: Sleeves Size for Pipes smaller than 50mm
S
Seerrvviicce e PPPPR R PPiippe e ssiizze e ((mmmm)) SSlleeeevve e SSiizzees s ((mmmm)) D D2200 7700 D D2255 7755 Wall/slab Wall/slab Rockwool (60 kg/m3) Rockwool (60 kg/m3) uPVC/PPR pipe uPVC/PPR pipe Fill Rockwool To Sleeve
Fill Rockwool To Sleeve Sleeve
Wall/Slab Sleeve
Rockwool (60 kg/m3)
Fire sealant uPVC/PPR i e Apply Fire Sealant
Fire sealant
Smooth Fire Sealant
Wall/Slab
uPVC, PPR pipe Sleeve
Fire sealant
Complete surface
Leave complete seal (The pipes concealed ceiling)
Wall/Slab
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) uPVC, PPR pipe
Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Rockwool (60 kg/m3)
Slab Sleeve
10÷15mm 70 mm
Detail Installation Fire Stopping For uPVC, PPR Pipe Through Slab
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm uPVC, PPR pipe
70 mm Wall Sleeve
For pipe from 50mm up to 160mm: Use Fire Wrap - Clean the pipe.
- Cut fire wrap to the correct length (See application table). - Wrap fire wrap around pipe.
- Push fire wrap into the annular pace.
- Fill all gap of fire wrap by fire sealant (If any).
Wrap fire wrap around pipe Cut fire wrap
Fill all gap of fire wrap by fire sealant (If any)
Push fire wrap into the annular pace
Wall
uPVC/PPR pipe
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only)
25mm Sleeve
(Sleeve size follow table 2, 3)
Plastic anchor bolt M4x50mm
Fire wrap 70 mm
Detail Installation Fire Wrap For uPVC, PPR Pipe Through The Wall
Detail Installation Fire Wrap For uPVC, PPR Pipe Through Slab Fire wrap
Rockwool (60 kg/m3) uPVC/PPR pipe
Plastic anchor bolt M4x50mm G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only)
25mm 70mm Slab Sleeve (Sleeve size follow table 2, 3)
Table 2: Sleeves Size for Pipes from 50mm up to 160mm Service Pipe size Sleeve Size (mm)
40A 100 50A 110 65A 125 80A 140 100A 160 125A 190 150A 200
Table 3: Sleeves Size for Condensate Pipes from 50mm up to 160mm Condensate Pipe
Normal size
Condensate Pipe size
with Insulation (mm) Sleeve Size (mm)
20A 67 110 25A 74 120 32A 82 130 40A 90 140 50A 100 150 80A 130 180 100A 154 200
For uPVC pipe over 160mm: Use Fire Collar
- Make measuring points according to pipe size
- Cut fire collar at marked measuring points according to pipe size. - Ben the intumescent side of the collar until it snap.
- Shape the collar to fit the pipe and bevel intumescent edge for close fit.
- Wrap the collar around the pipe and clip the first bracket into slots on both ends.
- Complete other brackets and fit the collar onto wall/slab.
Make measuring points according to pipe size
Cut fire collar
Ben the intumescent side of the collar until it snap
Wrap the collar around the pipe and clip the first bracket into slots on both ends
Complete other brackets and fit the collar onto wall/slab
Fire collar
Wall uPVC Pipe
uPVC Pipe
Detail Installation Fire Collar For uPVC Through The Wall
Slab
Detail Installation Fire Collar For uPVC Through Slab
Fire collar uPVC pipe
b. Metal pipes & Air ducts: Use Fire Sealant - Clean the pipe, Air duct.
- Fill rockwool (60 kg/m3) to sleeve/opening. Size of sleeve follow table 4 & 6, size of opening follow table 5.
- Apply fire sealant. - Smooth fire sealant
- Install G.I sheet 0.8mm thk- If the pipes, Air duct exposed ceiling.
Wall/slab
Rockwool (60 kg/m3)
Metal pipe/Air duct Fill Rockwool To Sleeve
Sleeve
Wall/Slab
Fire sealant
Apply Fire Sealant Sleeve
Metal pipe/Air duct Rockwool (60 kg/m3)
Table 4: Sleeve size for metal pipes (w/o Insulation) Service Pipe size
(mm) Sleeve Sizes (mm) 15 70 20 80 25 80 32 90 40 100 50 110 65 125 80 140 100 165 125 190 150 220 200 270 250 320 300 370
Table 5: Opening size for installation ducts Ducts size (mm) Opening Sizes (mm) w/o Insulation Opening Sizes (mm) with Insulation
Wide (WD) High (HD) Wide (WO) High (HO) Wide (WO) High (HO)
WD HD WO = WD+50 HO=HD+50 WO = WD+75 HO=HD+75 Note: - WD: Wide of ducts. - WO: Wide of opening. - HD: High of duct. - HO: High of opening.
Table 6: Sleeve size for chiller pipes Service Pipe size
(mm)
Insulation thick (mm)
Pipe Sleeve Sizes (mm) 20 32 140 25 32 150 32 32 150 40 32 150 50 32 175 65 38 200 80 38 210 100 38 240 125 38 265 150 38 300 200 50 370 250 50 420 300 50 470 350 50 500 400 50 550 450 50 600 500 50 650 Fire sealant
Smooth Fire Sealant
Wall/Slab
Metal pipe/Air duct Sleeve
Fire sealant
Complete surface
Leave complete seal
Wall/Slab
Metal pipe/Air duct
Fire sealant Wall/Slab
Air duct
Metal pipe
Complete Fire Sealant For Metal Pipe/Air Duct Concealed Ceiling Through Wall/Slab
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Rockwool (60 kg/m3) Metal pipe Slab Sleeve 10÷15mm 70 mm
Detail Installation Fire Stopping Metal Pipe Through Slab
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Metal pipe
70 mm Wall Sleeve
Fire protection pipes
G.I. sheet cover 0.8mm thk
Detail Installation Fire Stopping For Fire Protection Pipes Exposed Ceiling Through The Wall
Rockwool (48 kg/m3) Insulation
50mm G.I. sheet cover 0.8mm thk
(For pipes exposed ceiling only) Wall
Detail Installation Fire Stopping For Chiller Pipes Through The Wall 70mm
Chiller insulation Rockwool (60 kg/m3)
Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Chiller pipe
10÷15mm
Plastic anchor bolt M4x50mm Rockwool (48 kg/m3)
Insulation
70mm
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
Fire sealant; Depth: 10÷15mm
10÷15mm Chiller pipe Chiller insulation
Detail Installation Fire Stopping For Chiller Pipes Through Slab Sleeve
Slab 50mm
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Rockwool (60 kg/m3) Air duct Slab Opening 10÷15mm 70 mm
Detail Installation Fire Stopping Air duct Through Slab
G.I. sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm Fire sealant; Depth: 10÷15mm Air duct
70 mm Wall Opening
c. Electrical conduits: Use Fire Sealant.
- G.I. conduits: Method statement installation fire stopping for G.I. conduit through the wall/slab is the same Method statement installation fire stopping for metal pipes.
- PVC conduits: Method statement installation fire stopping for PVC conduit through the wall/slab is the same Method statement installation fire stopping for uPVC, PPR pipes smaller than 50mm through wall/slab.
d. Electric trunking, cable tray, ladder: Use Fire Cement. - Clean electric trunking, cable tray, ladder.
- Install form work to side opening (For wall opening). - Install form work to bottom opening (For floor opening). - Apply fire cement to opening (Opening size follow table 4). - Take-out form work.
- Clean electric trunking, cable tray, ladder out-side the wall/slab (If any).
Opening size max. Penetration type L x W (mm) Wall opening 600 x 600 Floor opening 600 x 400 Wall ≥90mm Wall opening ≥90mm ≤600mm Cable tray Fire cement Trunking
≤ 600mm Cable tray Cable trunking Fire cement Floor opening Slab ≥ 105mm
Detail Installation Fire Cement For Cable Trunking, Cable Tray Through Slab
Detail Installation Fire Cement For Cable Trunking Through Slab
Detail Installation Fire Cement For Cable Trunking and Cable Through The Wall
Busduct system: Use Rocwool and G.I. Sheet. - Clean busduct.
- Install G.I sheet 0.8mm thk to side opening (For wall opening). - Install G.I sheet 0.8mm thk to bottom opening (For floor
opening).
- Apply rockwool to opening.
- Install G.I sheet 0.8mm thk to other side opening (For wall opening).
- Install G.I sheet 0.8mm thk to top opening (For floor opening). - Clean busduct, working area.
25mm
Busduct
G.I. sheet cover
0.8mm thk
Slab
Detail Installation Fire Stopping For Busduct Throu h Slab
Rockwool (60 kg/m3)
G.I. sheet cover 0.8mm thk
Busduct
Detail Installation Fire Stopping For Busduct Through Slab ( Bottom View)
Busduct
Rockwool (60 kg/m3)
Detail Installation Fire Stopping For Busduct Through Slab (Top View – Befor Install G.I. Sheet Cover)
Busduct
G.I. sheet cover 0.8mm thk
Detail Installation Fire Stopping For Busduct Through Slab ( Top View)
Rockwool (60 kg/m3)
G.I. sheet cover 0.8mm thk 25mm
Detail Installation Fire Stopping For Busduct Through The Wall
Busduct
Wall
Detail Installation Fire Stopping For Busduct Through The Wall