PURSUANT TO SPECIAL CONDITION 6, WE SKY ORYX JOINT VENTURE, VERIFY THAT THIS SUBMITTAL SATISFIES ALL REQUIREMENTS OF THE CONTRACT, WITH THE EXCEPTION OF THE FOLLOWING CLARIFICATIONS/ PROPOSALS ACCEPTED BY THE ENGINEER;

CONTRACTOR'S PROJECT MANAGER;

M. HORIKAWA

PRINT NAME SIGNATURE DATE

DOCUMENT REVIEW STATUS

STATUS 1: WORK MAY PROCEED.

STATUS 2: REVISE & RESUBMIT.WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED .

STATUS 3: REVISE & RESUBMIT. WORK MAY PROCEED.

STATUS 4: REVIEW NOT REQUIRED. WORK MAY PROCEED.

PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS, CALCULATIONS, ANALYSES, TEST METHODS, OR MATERIALS DEVELOPED OR SELECTED BY CONTRACTOR AND SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH THE CONTRACT TECHNICAL SPECIFICATIONS AND DRAWINGS.

Overseas Bechtel, Inc.

Document No:25045-A1126-18-ITP-S-027

Prepared Approved Project Manager Syed Kausar QA/QC QA/QC Mgr. Checked

Struct Engg Cond.Mgr. FET Mgr. Rev.No

02 Date Description

ITP FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

CONTRACTOR'S VERIFICATION STAMP

(3)

Contract No.: Contract Title: ITP No. Issue date:09-02-2009 Rev. no : 2

25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.2,

Structural Steel Spec. 05120, 05060.

Activity Controlling

No.: Document SSI/C TPIA

(NDT) SOJV

TPIA (BOI)

1.0 Document Review

1.1 • Project Quality Assurance Plan (PQP) • Project Specifications Before Work As oer OBI Status code 1, SOJV-QP-10-02/X-01

• Method Statement • Exhibit-F Commencement 2 and 4

• Inspection and TestMethod Statement Plan (ITP) • Exhibit-B

• Shop drawings H H R

• Material Submittals • WPS, PQR&WQT • NDT (TPIA) Procedures

1.2 • Fabrication Drawings • Project Specifications Before Work Fabrication Drawing SOJV-QP-10-02/X-01

Commencement acceptance to SOJV H H R

2 Meterials-Steel Framing (ASTM A572, ASTM A36) • Spec-05120/Clause 2.1 ASTM, drawings, 05120 MRR, Drawings H H R R

2.1 Paint Material Inspection • Spec-05120 Each D.O. (SOJV-

• Primer Paint • Supplier submittal Delivery MRR-014-01 rev 1 & x-004)

• Manufacturer H H SR

product data, Safety Data & application procedure

Inspection

H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

Engineer not attend Monitoring

NDIA

New Doha International Airpoet Project

INSPECTION AND TEST PLAN

OBI Page: 1 of 6 Inspection* R - Review : Record/ Verifying Documents H R H Document review

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

(4)

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2

25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,

Structural Spec 05120, 05060.

Activity Controlling

No.: Document SSI/C TPIA

(NDT) SOJV

TPIA (BOI)

2.2 Welding Consumables • Spec-05120 Each ASME Section ll, Part C/ D.O & Batch

• SMAN Part2.1, Delivery AWS D 1.1, Section 5.3 Certificate /

• FCAW • 05060, part 2.1 Electrode log H H SR

• SAW • Supplier submittal Register

3 Calibration

3.1 • Equipments Calibration • Calibration Procedure As per manufacturer/ • ISO10012-1:1992, • Calibration certificates

• Measuring Instrument calibration agency Part 1 - Metrological • Equipments

• NDT Testing Equipments recommendations. conformation system for Calibrationlog H H H W

measuring equipment. • For NDT Awa D1.1 &

ASME BPVC Section V 4 Fabrication

4.1 Marking and Cutting • Spec-05120 100% Dimensions tolerance Material

Part2.1,2.5c, 2.5.A.2, shall be as per identification and

2.5 I • AISC Specification for tracesbility /

• Approved shop Structural steel Inspection Request H W SR

Drawings Building Part

(25045-A1000-18-ITR-16, Chapter M,M2,2 S-002& 001) • Fabrication Tolerances

± 6 mm. for AESS. • Fabrication Tolerances

are as per AISC for Non- AESS. Inspection

H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

Engineer not attend Monitoring

Verifying Documents Document review Page: 2 of 6 Inspection* OBI S/R S R NDIA

New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

R - Review : Record/

(5)

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2 25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,

Structural Spec 05120, 05060.

Activity

No.: SSI/C TPIA

(NDT) SOJV

TPIA (BOI)

• AWS code for Weld joint preparation • Marking the high

strength steel as per ASTM A/A6 M.

• Camber if requied by IFC

4.2 Fit-up • Spec -05120, Part 2.6.B • AWS D1.1 Weld Visual Inspection

• Approved shop Drawings • Complicance to Report / Inspection

production Drawing Request H H SR

(25045-A1000-18-ITR-S-003&001)

4.3 Welding Process • Spec-05120, Part • Approved WPS & PQR Weld Visual

2.6 & 05060 Part 3.5 • AWS D1.1 Inspection

• Production Drawings • APProved TPIA to Report / Inspection H H SR

review and certify weld Request

procedures and all

(25045-A1000-18-ITR-welder qualifications S-003&001) 4.4 Welding Repair • Production Drawings • By grinding to smooth Report/ Inspection

• Repairs local surface contour with a Report

imperfection depth below curvature of less than 1

/2

(25045-A1000-18-1/16 inch or less inch (13 mm) in either ITR-S-003&001)

• Repair by welding where required direction. (NDT TPIA- Reports) H H W SR

• Test on repair portion • To ensure that defects

have been temoved prior to depositing any weld metal, examine prepared areas by DPT.

Inspection

H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

Engineer not attend Monitoring

Document review

Inspection* Acceptance Criteria Verifying

Page: 3 of 6 R - Review : Record/ S S Documents Frequency S 100%

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Activity Description

100%

OBI New Doha International Airpoet Project

INSPECTION AND TEST PLAN

Controlling Document

(6)

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2

25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,

Structural Spec 05120, 05060.

Activity

No.: SSI/C (NDT)TPIA SOJV (BOI)TPIA

5 WELDING TESTING

5.1 Visual inspection of Welding • Spec -05060 Part 3.2 C Weld Visual for Surface Weld Visual H W W SR

• Drawings holes, cracks, Undercut, Inspection Report

Confirming to AWS D 1.1 (25045-A1000-18-2004 Section (6.9), Table ITR-S-004)

6.1 (ITPA Endorsement

on Report)

5.2 Liquid Penetration test for Back gauging of Spec -05120, Part 2.9 As needed • AWS D1.1 - 2004 Visual

CP Welds Section (6.10) H H W SR

5.3 • UT on CP Welds • Spec-05060, Part • AWS D1.1 - 2004 UT Report

• UT on 38 mm and thicker 3.2,3.5 & 05120 part 2.9 • Section (6.13) (TPIA -Report)

plate subject throung • Drawings • ASTM E 164 & Weld map H H W SR

thickness weld shrinkage strain.

5.4 • MPI on Fillet Welds • Spec-05060, Part 3.5J • Web- Flange • AWS D1.1 - 2004 MPI Report

• MPI on Partial penetration • Drawings connection 10%,ii) 10% Section (6.10) (TPIA-Report)

Welds Beam and Girder • ASTM E 709 & Weld map H H W SR

connection

where they connection using a clip angle, otherwise 100% • All other connection

s-100% Inspection

H-Hold Point : Written notification required. Contractor W - Witness : Written notification required S - Surveillance : No notification required but may not proceed beyond this point without written but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

confirmation of the Engineer not attend Monitoring

Activity Description 100% R - Review : Record/ 100% S Page: 4 of 6 Controlling

Acceptance Criteria Verifying Inspection*

Document Documents Frequency OBI Document review S S S NDIA

New Doha International Airpoet Project

INSPECTION AND TEST PLAN

(7)

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2 25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,

Structural Spec 05120, 05060.

Activity

No.: SSI/C (NDT)TPIA SOJV TPIA (BOI)

5.5 • RT on CP Welds • Spec-05120 part 2.9 E Rt Re[prt

• Drawings (TPIA-Report & Weld) map H H W SR

• NDT Procedure

6.0 Final Inspection (Fabrication)

6.1 • Final Inspection • Spec-05060 Part 3.2 Before Painting Check for dimension, Dimension

• Visual Inspection & 3.2, 05120 Part tolerance, orientation, Reports

• Dimensional check 2.5, 2.6.B depth, camber, holes

(25045-A1000-18-• Approved shop positions, distortion, ITR-S-005)

Drawings straightness, Erection (TPIA Endorsement

marks, etc & confirming on all fabrication

to AISC "Code of Records) H H SR

Standards Practice for steel Buildings Section 6,6.4.

Weld visual for surface holes, cracks, Undercut, Confirming to AWS D 1.1-2004 Section 6.9, Table 6.1

7.0 Sand blasting and Primer Painting

7.1 Surface Preparation by Shot / Grit Blasting • Spec-05120, part 2.7 Each Fabricated • As per SSpc-sp 14/ Paint Report

• For AESS-Spec-09805 component NACE No.8

(25045-A1000-18-part 3.2.A.1 inspection • For AESS confirming ITR-S-006) H W SR

with SSPC SP-6 Inspection

H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

Engineer not attend Monitoring

25%

Page: 5 of 6

Activity Description Inspection*

Document Documents OBI

Document review S S S R - Review : Record/ Controlling

Frequency Acceptance Criteria NDIA

New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

(8)

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2

25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027

Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,

Structural Spec 05120, 05060.

Activity

No.: SSI/C TPIA

(NDT) SOJV

TPIA (BOI)

7.2 Primer Paint Application & Inspection • Spec-05120, part 2.3,2.7 Each Batch Check for Surface Paint report • For AESS-Spec-09805 random inspection cleaning, Atmosphere (DFT)

part 2.3 conditions

(25045-A1000-18-(Temperatures & Humidity), ITR-S-006) recommended maerials,

Dry Film Thickness (DFT not less than 38μ) and

confirming with H W SR

Manufacturer's recommendations. • For AESS primer DFT

(76μ ± 12.7 μ) • Keep steel members

off ground and spaced using pallets, dunnage, or other supports and spacers. 8.0 Final Inspection (Before Packing )

Inspection

H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/

Engineer not attend Monitoring

Documents

Verifying Inspection*

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Activity Description Controlling Frequency Acceptance Criteria Document

Page: 6 of 6

OBI NDIA

New Doha International Airpoet Project

INSPECTION AND TEST PLAN

S

R - Review : Record/ Document review

(9)

INSPECTION REQUEST NUMBER:

DATE:

CONTRACT NO:

CONTRACTOR NAME:

REPORT NO:

DRAWING NO:

AREA / LOCATION / SUBJECT :

TYPE OF INSPECTION

MATERIAL

FIT UP

WELDING

NDT

PAINTING

SURVEY

FINAL INSPECTION

OTHER

DATE & TIME INSPECTION REQUIRED:

CONTRATOR :

DATE & TIME :

RECEVIED BY :

DATE & TIME :

REPLY

Approved

Approved as noted

Not Approved

SUB CON QC REP:

DATE:

SUB CONTRACTOR QC REP:

DATE:

OBI REP:

DATE:

( PRINT NAME AND SIGN )

Document No: 25045-A1126-18-ITR-S-001

INSPECTION REQUEST

( PRINT NAME AND SIGN )

( PRINT NAME AND SIGN )

(10)
(11)

Weight Material Date Delivery

(kgs.) Specification Received Order No.

REMARKS :

DATE :

DATE :

DATE :

__________________________________________________

Document No. : 25045-A1126-18-ITR-S-001,ForM a

REPORT NO. : LOCATION : SIAM STEEL BANGNA FACTORY STORAGE AREA : SIAM STEEL BANGNA FACTORY YARD SHEET NO. :

MATERIAL RECEIVING REPORT

(RAW STEEL MATERIALS)

CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. DATE :

Item No.

Description Qty. Manufacturer

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :

Heat No. Mill Test Certificate No.

CONTRACTOR QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

OBI REPRESENTATIVE :

WITHNESS & REVIEW ONLY REVIEW

(PRINT NAME AND SIGN)

________________________________________________________________

(PRINT NAME AND SIGN)

SOJV QC REPRESENTATIVE :

(12)
(13)

INSPECTION REQUEST NO.: DATE :

CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY

PIECE MARK : STRUCTURE TYPE : DRAWING NO.:

Marking/ Cutting DATE : _________________________________________________________________________ DATE : _________________________________________________________________________

OBI REPRESENTATIVE : DATE :

_________________________________________________________

Document No. : 25045-18-ITR-S-002

MATERIAL IDENTIFICATION AND TRACEABILITY REPORT

REPORT NO. :

Item

No. Part No./Mark

CONTRACTOR QC REPRESENTATIVE :

SOJV QC REPRESENTATIVE :

SHEET NO. :

Qty.

Description Material Heat No. Mill Test Certificate No. Specification

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN)

ONLY REVIEW WITHNESS & REVIEW

(14)
(15)

REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.

DRAWING NO. : WELD JOINT KEYPLAN :

(SEE ATTACHED SHEETS)

LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD

DATE :

__________________________________________________________

DATE :

__________________________________________________________

OBI REPRESENTATIVE : DATE :

______________________________

Document No. :25045-A1126-18-ITR-S-003 FIT- UP INSPECTION REPORT

(WELD GROOVE)

INSPECTION REQUESTNO.: DATE :

PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY

CONTRACT NO. CP - 18

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : SHEET NO. :

Groove Angle STRUCTURE TYPE :

Joint No. Root Gap Root Face Groove Remark

Angle Root Gap Root Face Remark

ONLY REVIEW WITNESS &REVIEW

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN)

CONTRACTOR QC REPRESENTATIVE :

SOJV QC REPRESENTATIVE :

(16)

REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.

DRAWING NO. WELD JOINT KEYPLAN :

(SEE ATTACHED SHEETS)

LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD

DATE :

__________________________________________________________

DATE :

__________________________________________________________

OBI REPRESENTATIVE : DATE :

______________________________ (PRINT NAME AND SIGN)

Document No. :25045-A1126-18-ITR-S-003,Form b FIT- UP INSPECTION REPORT

(WELD GROOVE)

INSPECTION REQUESTNO.: DATE :

Root Face Groove

Angle Remark PIECE MARK : STRUCTURE TYPE : CONTRACT NO. CP - 18 WITNESS &REVIEW Joint No. SHEET NO. : PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :

LOCATION : SIAM STEEL BANGNA FACTORY

DRAWING NO.

CONTRACTOR QC REPRESENTATIVE :

Root Gap

ONLY REVIEW

PIECE MARK REV.

(PRINT NAME AND SIGN) (PRINT NAME AND SIGN)

(17)
(18)
(19)
(20)

REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.

MATERIAL SPECIFICATION: DRAWING NO. :

VASUAL INSPECTION SUMMARY (As per AWS D1.1/D1.1M:2006 Sectuib 6.9, Tavle 6.1):

OTHER REMARKS (IF ANY):

Refer to attached weld joint keyplan

DATE :

__________________________________________________________

DATE :

__________________________________________________________

OBI REPRESENTATIVE : DATE :

______________________________

Document No. : 25045-A1126-18-ITR-S-004 SHEET NO. :

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :

INSPECTION REQUESTNO.: DATE :

CONTRACT NO. CP - 18

WELD VISUAL INSPECTION REPORT

Welding Process

Welder Id No.

PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY

Visual WPS No.

STRUCTURE TYPE :

Joint

No. Fit-Up Report No.

Marking / Cutting Report No.

CONTRACTOR QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

SOJV QC REPRESENTATIVE :

Item No. Inspection Category Result Item No.

(PRINT NAME AND SIGN) ONLY REVIEW

(PRINT NAME AND SIGN)

WITNESS &REVIEW

Result Inspection Category

(21)
(22)

INSPECTION REQUEST NO.:

CONTRACT NO.: CP-18 REPORT NO. :

CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.

PIECE MARK :

DRAWING No.:

INSPECTION RESULT:

OTHER REMARKS (IF ANY):

DATE : __________________________________________________________ DATE : __________________________________________________________ DATE : __________________________________________________________

OBI REPRESENTATIVE : DATE :

______________________________ (PRINT NAME AND SIGN)

Document No. : 25045-A1126-18-ITR-S-005

FINAL INSPECTION REPORT

MATERIAL SPECIFICATION: ASTM A572 Grade 50

(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS) DATE :

INSPECTION REPORTS SUMMARY

WITNESS &REVIEW ONLY REVIEW PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :

LOCATION : SIAM STEEL BANGNA FACTORY

TPIA REPRESENTATIVE

(PRINT NAME AND SIGN)

Inspection Report

No.

ITP Activity No.

Description

SOJV QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

STRUCTURE TYPE:

SHEET NO. :

CONTRACTOR QC REPRESENTATIVE :

(23)

INSPECTION REQUEST NO.: DATE :

CONTRACT NO.: CP-18 REPORT NO. :

CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. : PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :

PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY

STRUCTURE TYPE: DRAWING No.:

Document No. : 25045-A1126-18-ITR-S-005, form b MATERIAL SPECIFICATION: ASTM A572 Grade 50

(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS)

FINAL INSPECTION REPORT

Non-Destructive Examination (NDE) Report Summary

(24)
(25)

INSPECTION REQUEST NO.: DATE : CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. REPORT NO. :

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : SHEET NO. :

STRUCTURE TYPE: DRAWING NO.: LOCATION : SIAM STEEL BANGNA FACTORY

E

(mm)

(mm)

LEGEND:

SUBCONTRACTOR QC REPRESENTATIVE DATE :

_________________________________________________________________________

SOJV QC REPRESENTATIVE : DATE :

_________________________________________________________________________

OBI REPRESENTATIVE : DATE :

________________________________________________________________

Document No. : 25045-A1126-18-ITR-S-005,Form C

e1 E (mm) (mm) DD DD E B35 B11 DD E

DIMENSIONAL INSPECTION REPORT

H3 DD (mm) DD E (mm) (mm) (mm) (mm) (mm) (mm) B8 B9 B10 (mm) DD (mm) (mm) E DD E E L4 L5 H1 H2 (mm) (mm) (mm) (mm) H4 DD E DD E DD DD E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) DD E (mm) DD (mm) (mm) (mm) DD (mm) (mm) (mm) (mm) DD (mm) DD B32 DD E (mm) (mm) (mm) (mm) (mm) (mm) DD E (mm) DD DD (mm) (mm) E (mm)

(SINGLE PRODUCT)

ONLY REVIEW WITHNESS & REVIEW

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN)

(PRINT NAME AND SIGN) (mm) (mm) (mm) (mm) DD E DD E B33 B34 E DD E B30 B31 (mm) (mm) (mm) (mm) DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) E DD E E DD E DD E DD E B28 B29 E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) B24 B25 B26 B27 DD E DD E DD E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) B15 DD E DD E DD E (mm) (mm) B12 B13 B14 (mm) (mm) (mm) (mm) (mm) (mm) DD E DD E DD E B2 B3 4-6ARCH1 L1 DD (mm) (mm) e2 B1 DD L2 L3 PIEXE MARK E DD E (mm) (mm) (mm) (mm) B21 B22 B23 B20 DD E B16 B17 B18 B19 E B4 B5 B6 B7 DD E DD E E

(26)
(27)

INSPECTION REQUEST NO.: DATE : REPORT NO.: CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY

PIECE MARK : STRUCTURE TYPE : DRAWING NO.:

Surface Preparation: Sa 2.5 No. of Coats: Blasting & Painting Date: Weather :

Paint Specification: 25045-a1100-18-ssd-s-xxxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)

Paint Material: Relative Humidity (%): Dew Point (๐C)

1st 2nd 3rd 1st 2nd 3rd 1st 2nd 3rd

OTHER REMARKS (IF ANY):

Note: Refer to Sheet 3 of 3 for DFT Spot Measuring Keyplan.

DATE :

____________________________________________________________________________

DATE :

_____________________________________________________________________________

OBI REPRESENTATIVE : DATE :

________________________________________________________________

Document No. : 25045-A1126-18-ITR-S-006

(PRINT NAME AND SIGN)

Spot No. Spot No. Gage Readings

WITHNESS & REVIEW Primer Coat DFT (microns)

(PRINT NAME AND SIGN) ONLY REVIEW

CONTRACTOR QC REPRESENTATIVE :

SOJV QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

PAINTING INSPECTION REPORT

Average Average

Primer Coat DFT (microns) Spot No.

Primer Coat DFT (microns)

Average

(28)

INSPECTION REQUEST NO.: DATE : REPORT NO.: CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:

PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY

PIECE MARK : STRUCTURE TYPE : DRAWING NO.:

Surface Preparation: Sa 2.5 No. of Coats: One (1) Blasting & Painting Date: Weather :

Paint Specification: 25045-a1100-18-ssd-s-xxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)

Paint Material: Relative Humidity (%): Dew Point (๐C)

1st 2nd 3rd

DATE :

____________________________________________________________________________

DATE :

_____________________________________________________________________________

OBI REPRESENTATIVE : DATE :

________________________________________________________________

Document No. : 25045-A1126-18-ITR-S-006,form b

PAINTING INSPECTION REPORT

CONTRACTOR QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

SOJV QC REPRESENTATIVE :

(PRINT NAME AND SIGN)

Average DFT

(microns) Inspection Result Piece Mark

WITHNESS & REVIEW ONLY REVIEW

(PRINT NAME AND SIGN)

Spot No.

Primer Coat DFT (microns) Gage Readings

Average

References

Related documents

These test runs, and the output benchmark number show the effect of increased threads on a fixed size, 8 domain problem.. It is not perfect scaling, but additional threads

up-sells in your sales process immediately, and also add a 4-Day Cash machine to your follow

Hazardous reactions: Hazardous reactions will not occur under normal transport or storage conditions. Decomposition may occur on exposure to conditions or materials

Since the authors criticizing the classic approach do not offer coherent new models, neither with regard to the analysis of trauma narratives in general (Craps et al. 908)

Question #5: 

Purchased an account action required error: strange because your google accounts, a new intent for a module at action requires buttons below are in to.. Billing and look in

(a) The required notice period (after lodgement with the Australian Securities and Investment Commission of written notification of the capital reduction) has expired and so

This letter serves as the only notification of the REQUIRED written examination test date, and for the Candidate Physical Ability Test (CPAT) orientation.. Have picture