PURSUANT TO SPECIAL CONDITION 6, WE SKY ORYX JOINT VENTURE, VERIFY THAT THIS SUBMITTAL SATISFIES ALL REQUIREMENTS OF THE CONTRACT, WITH THE EXCEPTION OF THE FOLLOWING CLARIFICATIONS/ PROPOSALS ACCEPTED BY THE ENGINEER;
CONTRACTOR'S PROJECT MANAGER;
M. HORIKAWA
PRINT NAME SIGNATURE DATE
DOCUMENT REVIEW STATUS
STATUS 1: WORK MAY PROCEED.
STATUS 2: REVISE & RESUBMIT.WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED .
STATUS 3: REVISE & RESUBMIT. WORK MAY PROCEED.
STATUS 4: REVIEW NOT REQUIRED. WORK MAY PROCEED.
PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS, CALCULATIONS, ANALYSES, TEST METHODS, OR MATERIALS DEVELOPED OR SELECTED BY CONTRACTOR AND SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH THE CONTRACT TECHNICAL SPECIFICATIONS AND DRAWINGS.
Overseas Bechtel, Inc.
Document No:25045-A1126-18-ITP-S-027
Prepared Approved Project Manager Syed Kausar QA/QC QA/QC Mgr. CheckedStruct Engg Cond.Mgr. FET Mgr. Rev.No
02 Date Description
ITP FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
CONTRACTOR'S VERIFICATION STAMP
Contract No.: Contract Title: ITP No. Issue date:09-02-2009 Rev. no : 2
25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.2,
Structural Steel Spec. 05120, 05060.
Activity Controlling
No.: Document SSI/C TPIA
(NDT) SOJV
TPIA (BOI)
1.0 Document Review
1.1 • Project Quality Assurance Plan (PQP) • Project Specifications Before Work As oer OBI Status code 1, SOJV-QP-10-02/X-01
• Method Statement • Exhibit-F Commencement 2 and 4
• Inspection and TestMethod Statement Plan (ITP) • Exhibit-B
• Shop drawings H H R
• Material Submittals • WPS, PQR&WQT • NDT (TPIA) Procedures
1.2 • Fabrication Drawings • Project Specifications Before Work Fabrication Drawing SOJV-QP-10-02/X-01
Commencement acceptance to SOJV H H R
2 Meterials-Steel Framing (ASTM A572, ASTM A36) • Spec-05120/Clause 2.1 ASTM, drawings, 05120 MRR, Drawings H H R R
2.1 Paint Material Inspection • Spec-05120 Each D.O. (SOJV-
• Primer Paint • Supplier submittal Delivery MRR-014-01 rev 1 & x-004)
• Manufacturer H H SR
product data, Safety Data & application procedure
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
Engineer not attend Monitoring
NDIA
New Doha International Airpoet Project
INSPECTION AND TEST PLAN
OBI Page: 1 of 6 Inspection* R - Review : Record/ Verifying Documents H R H Document review
FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2
25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Structural Spec 05120, 05060.
Activity Controlling
No.: Document SSI/C TPIA
(NDT) SOJV
TPIA (BOI)
2.2 Welding Consumables • Spec-05120 Each ASME Section ll, Part C/ D.O & Batch
• SMAN Part2.1, Delivery AWS D 1.1, Section 5.3 Certificate /
• FCAW • 05060, part 2.1 Electrode log H H SR
• SAW • Supplier submittal Register
3 Calibration
3.1 • Equipments Calibration • Calibration Procedure As per manufacturer/ • ISO10012-1:1992, • Calibration certificates
• Measuring Instrument calibration agency Part 1 - Metrological • Equipments
• NDT Testing Equipments recommendations. conformation system for Calibrationlog H H H W
measuring equipment. • For NDT Awa D1.1 &
ASME BPVC Section V 4 Fabrication
4.1 Marking and Cutting • Spec-05120 100% Dimensions tolerance Material
Part2.1,2.5c, 2.5.A.2, shall be as per identification and
2.5 I • AISC Specification for tracesbility /
• Approved shop Structural steel Inspection Request H W SR
Drawings Building Part
(25045-A1000-18-ITR-16, Chapter M,M2,2 S-002& 001) • Fabrication Tolerances
± 6 mm. for AESS. • Fabrication Tolerances
are as per AISC for Non- AESS. Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
Engineer not attend Monitoring
Verifying Documents Document review Page: 2 of 6 Inspection* OBI S/R S R NDIA
New Doha International Airpoet Project
INSPECTION AND TEST PLAN
FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
R - Review : Record/
Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2 25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Structural Spec 05120, 05060.
Activity
No.: SSI/C TPIA
(NDT) SOJV
TPIA (BOI)
• AWS code for Weld joint preparation • Marking the high
strength steel as per ASTM A/A6 M.
• Camber if requied by IFC
4.2 Fit-up • Spec -05120, Part 2.6.B • AWS D1.1 Weld Visual Inspection
• Approved shop Drawings • Complicance to Report / Inspection
production Drawing Request H H SR
(25045-A1000-18-ITR-S-003&001)
4.3 Welding Process • Spec-05120, Part • Approved WPS & PQR Weld Visual
2.6 & 05060 Part 3.5 • AWS D1.1 Inspection
• Production Drawings • APProved TPIA to Report / Inspection H H SR
review and certify weld Request
procedures and all
(25045-A1000-18-ITR-welder qualifications S-003&001) 4.4 Welding Repair • Production Drawings • By grinding to smooth Report/ Inspection
• Repairs local surface contour with a Report
imperfection depth below curvature of less than 1
/2
(25045-A1000-18-1/16 inch or less inch (13 mm) in either ITR-S-003&001)
• Repair by welding where required direction. (NDT TPIA- Reports) H H W SR
• Test on repair portion • To ensure that defects
have been temoved prior to depositing any weld metal, examine prepared areas by DPT.
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
Engineer not attend Monitoring
Document review
Inspection* Acceptance Criteria Verifying
Page: 3 of 6 R - Review : Record/ S S Documents Frequency S 100%
FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
Activity Description
100%
OBI New Doha International Airpoet Project
INSPECTION AND TEST PLAN
Controlling Document
Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2
25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Structural Spec 05120, 05060.
Activity
No.: SSI/C (NDT)TPIA SOJV (BOI)TPIA
5 WELDING TESTING
5.1 Visual inspection of Welding • Spec -05060 Part 3.2 C Weld Visual for Surface Weld Visual H W W SR
• Drawings holes, cracks, Undercut, Inspection Report
Confirming to AWS D 1.1 (25045-A1000-18-2004 Section (6.9), Table ITR-S-004)
6.1 (ITPA Endorsement
on Report)
5.2 Liquid Penetration test for Back gauging of Spec -05120, Part 2.9 As needed • AWS D1.1 - 2004 Visual
CP Welds Section (6.10) H H W SR
5.3 • UT on CP Welds • Spec-05060, Part • AWS D1.1 - 2004 UT Report
• UT on 38 mm and thicker 3.2,3.5 & 05120 part 2.9 • Section (6.13) (TPIA -Report)
plate subject throung • Drawings • ASTM E 164 & Weld map H H W SR
thickness weld shrinkage strain.
5.4 • MPI on Fillet Welds • Spec-05060, Part 3.5J • Web- Flange • AWS D1.1 - 2004 MPI Report
• MPI on Partial penetration • Drawings connection 10%,ii) 10% Section (6.10) (TPIA-Report)
Welds Beam and Girder • ASTM E 709 & Weld map H H W SR
connection
where they connection using a clip angle, otherwise 100% • All other connection
s-100% Inspection
H-Hold Point : Written notification required. Contractor W - Witness : Written notification required S - Surveillance : No notification required but may not proceed beyond this point without written but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
confirmation of the Engineer not attend Monitoring
Activity Description 100% R - Review : Record/ 100% S Page: 4 of 6 Controlling
Acceptance Criteria Verifying Inspection*
Document Documents Frequency OBI Document review S S S NDIA
New Doha International Airpoet Project
INSPECTION AND TEST PLAN
Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2 25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Structural Spec 05120, 05060.
Activity
No.: SSI/C (NDT)TPIA SOJV TPIA (BOI)
5.5 • RT on CP Welds • Spec-05120 part 2.9 E Rt Re[prt
• Drawings (TPIA-Report & Weld) map H H W SR
• NDT Procedure
6.0 Final Inspection (Fabrication)
6.1 • Final Inspection • Spec-05060 Part 3.2 Before Painting Check for dimension, Dimension
• Visual Inspection & 3.2, 05120 Part tolerance, orientation, Reports
• Dimensional check 2.5, 2.6.B depth, camber, holes
(25045-A1000-18-• Approved shop positions, distortion, ITR-S-005)
Drawings straightness, Erection (TPIA Endorsement
marks, etc & confirming on all fabrication
to AISC "Code of Records) H H SR
Standards Practice for steel Buildings Section 6,6.4.
Weld visual for surface holes, cracks, Undercut, Confirming to AWS D 1.1-2004 Section 6.9, Table 6.1
7.0 Sand blasting and Primer Painting
7.1 Surface Preparation by Shot / Grit Blasting • Spec-05120, part 2.7 Each Fabricated • As per SSpc-sp 14/ Paint Report
• For AESS-Spec-09805 component NACE No.8
(25045-A1000-18-part 3.2.A.1 inspection • For AESS confirming ITR-S-006) H W SR
with SSPC SP-6 Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
Engineer not attend Monitoring
25%
Page: 5 of 6
Activity Description Inspection*
Document Documents OBI
Document review S S S R - Review : Record/ Controlling
Frequency Acceptance Criteria NDIA
New Doha International Airpoet Project
INSPECTION AND TEST PLAN
FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2
25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Structural Spec 05120, 05060.
Activity
No.: SSI/C TPIA
(NDT) SOJV
TPIA (BOI)
7.2 Primer Paint Application & Inspection • Spec-05120, part 2.3,2.7 Each Batch Check for Surface Paint report • For AESS-Spec-09805 random inspection cleaning, Atmosphere (DFT)
part 2.3 conditions
(25045-A1000-18-(Temperatures & Humidity), ITR-S-006) recommended maerials,
Dry Film Thickness (DFT not less than 38μ) and
confirming with H W SR
Manufacturer's recommendations. • For AESS primer DFT
(76μ ± 12.7 μ) • Keep steel members
off ground and spaced using pallets, dunnage, or other supports and spacers. 8.0 Final Inspection (Before Packing )
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/
Engineer not attend Monitoring
Documents
Verifying Inspection*
FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
Activity Description Controlling Frequency Acceptance Criteria Document
Page: 6 of 6
OBI NDIA
New Doha International Airpoet Project
INSPECTION AND TEST PLAN
S
R - Review : Record/ Document review
INSPECTION REQUEST NUMBER:
DATE:
CONTRACT NO:
CONTRACTOR NAME:
REPORT NO:
DRAWING NO:
AREA / LOCATION / SUBJECT :
TYPE OF INSPECTION
MATERIAL
FIT UP
WELDING
NDT
PAINTING
SURVEY
FINAL INSPECTION
OTHER
DATE & TIME INSPECTION REQUIRED:
CONTRATOR :
DATE & TIME :
RECEVIED BY :
DATE & TIME :
REPLY
Approved
Approved as noted
Not Approved
SUB CON QC REP:
DATE:
SUB CONTRACTOR QC REP:
DATE:
OBI REP:
DATE:
( PRINT NAME AND SIGN )
Document No: 25045-A1126-18-ITR-S-001
INSPECTION REQUEST
( PRINT NAME AND SIGN )
( PRINT NAME AND SIGN )
Weight Material Date Delivery
(kgs.) Specification Received Order No.
REMARKS :
DATE :
DATE :
DATE :
__________________________________________________
Document No. : 25045-A1126-18-ITR-S-001,ForM a
REPORT NO. : LOCATION : SIAM STEEL BANGNA FACTORY STORAGE AREA : SIAM STEEL BANGNA FACTORY YARD SHEET NO. :
MATERIAL RECEIVING REPORT
(RAW STEEL MATERIALS)
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. DATE :
Item No.
Description Qty. Manufacturer
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
Heat No. Mill Test Certificate No.
CONTRACTOR QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
WITHNESS & REVIEW ONLY REVIEW
(PRINT NAME AND SIGN)
________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
INSPECTION REQUEST NO.: DATE :
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Marking/ Cutting DATE : _________________________________________________________________________ DATE : _________________________________________________________________________
OBI REPRESENTATIVE : DATE :
_________________________________________________________
Document No. : 25045-18-ITR-S-002
MATERIAL IDENTIFICATION AND TRACEABILITY REPORT
REPORT NO. :
Item
No. Part No./Mark
CONTRACTOR QC REPRESENTATIVE :
SOJV QC REPRESENTATIVE :
SHEET NO. :
Qty.
Description Material Heat No. Mill Test Certificate No. Specification
(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN)
ONLY REVIEW WITHNESS & REVIEW
REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
DRAWING NO. : WELD JOINT KEYPLAN :
(SEE ATTACHED SHEETS)
LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD
DATE :
__________________________________________________________
DATE :
__________________________________________________________
OBI REPRESENTATIVE : DATE :
______________________________
Document No. :25045-A1126-18-ITR-S-003 FIT- UP INSPECTION REPORT
(WELD GROOVE)
INSPECTION REQUESTNO.: DATE :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
CONTRACT NO. CP - 18
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : SHEET NO. :
Groove Angle STRUCTURE TYPE :
Joint No. Root Gap Root Face Groove Remark
Angle Root Gap Root Face Remark
ONLY REVIEW WITNESS &REVIEW
(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN)
CONTRACTOR QC REPRESENTATIVE :
SOJV QC REPRESENTATIVE :
REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
DRAWING NO. WELD JOINT KEYPLAN :
(SEE ATTACHED SHEETS)
LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD
DATE :
__________________________________________________________
DATE :
__________________________________________________________
OBI REPRESENTATIVE : DATE :
______________________________ (PRINT NAME AND SIGN)
Document No. :25045-A1126-18-ITR-S-003,Form b FIT- UP INSPECTION REPORT
(WELD GROOVE)
INSPECTION REQUESTNO.: DATE :
Root Face Groove
Angle Remark PIECE MARK : STRUCTURE TYPE : CONTRACT NO. CP - 18 WITNESS &REVIEW Joint No. SHEET NO. : PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
LOCATION : SIAM STEEL BANGNA FACTORY
DRAWING NO.
CONTRACTOR QC REPRESENTATIVE :
Root Gap
ONLY REVIEW
PIECE MARK REV.
(PRINT NAME AND SIGN) (PRINT NAME AND SIGN)
REPORT NO. : CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
MATERIAL SPECIFICATION: DRAWING NO. :
VASUAL INSPECTION SUMMARY (As per AWS D1.1/D1.1M:2006 Sectuib 6.9, Tavle 6.1):
OTHER REMARKS (IF ANY):
Refer to attached weld joint keyplan
DATE :
__________________________________________________________
DATE :
__________________________________________________________
OBI REPRESENTATIVE : DATE :
______________________________
Document No. : 25045-A1126-18-ITR-S-004 SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
INSPECTION REQUESTNO.: DATE :
CONTRACT NO. CP - 18
WELD VISUAL INSPECTION REPORT
Welding Process
Welder Id No.
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
Visual WPS No.
STRUCTURE TYPE :
Joint
No. Fit-Up Report No.
Marking / Cutting Report No.
CONTRACTOR QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
Item No. Inspection Category Result Item No.
(PRINT NAME AND SIGN) ONLY REVIEW
(PRINT NAME AND SIGN)
WITNESS &REVIEW
Result Inspection Category
INSPECTION REQUEST NO.:
CONTRACT NO.: CP-18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
PIECE MARK :
DRAWING No.:
INSPECTION RESULT:
OTHER REMARKS (IF ANY):
DATE : __________________________________________________________ DATE : __________________________________________________________ DATE : __________________________________________________________
OBI REPRESENTATIVE : DATE :
______________________________ (PRINT NAME AND SIGN)
Document No. : 25045-A1126-18-ITR-S-005
FINAL INSPECTION REPORT
MATERIAL SPECIFICATION: ASTM A572 Grade 50
(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS) DATE :
INSPECTION REPORTS SUMMARY
WITNESS &REVIEW ONLY REVIEW PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
LOCATION : SIAM STEEL BANGNA FACTORY
TPIA REPRESENTATIVE
(PRINT NAME AND SIGN)
Inspection Report
No.
ITP Activity No.
Description
SOJV QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
STRUCTURE TYPE:
SHEET NO. :
CONTRACTOR QC REPRESENTATIVE :
INSPECTION REQUEST NO.: DATE :
CONTRACT NO.: CP-18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. : PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE: DRAWING No.:
Document No. : 25045-A1126-18-ITR-S-005, form b MATERIAL SPECIFICATION: ASTM A572 Grade 50
(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS)
FINAL INSPECTION REPORT
Non-Destructive Examination (NDE) Report Summary
INSPECTION REQUEST NO.: DATE : CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. REPORT NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : SHEET NO. :
STRUCTURE TYPE: DRAWING NO.: LOCATION : SIAM STEEL BANGNA FACTORY
E
(mm)
(mm)
LEGEND:
SUBCONTRACTOR QC REPRESENTATIVE DATE :
_________________________________________________________________________
SOJV QC REPRESENTATIVE : DATE :
_________________________________________________________________________
OBI REPRESENTATIVE : DATE :
________________________________________________________________
Document No. : 25045-A1126-18-ITR-S-005,Form C
e1 E (mm) (mm) DD DD E B35 B11 DD E
DIMENSIONAL INSPECTION REPORT
H3 DD (mm) DD E (mm) (mm) (mm) (mm) (mm) (mm) B8 B9 B10 (mm) DD (mm) (mm) E DD E E L4 L5 H1 H2 (mm) (mm) (mm) (mm) H4 DD E DD E DD DD E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) DD E (mm) DD (mm) (mm) (mm) DD (mm) (mm) (mm) (mm) DD (mm) DD B32 DD E (mm) (mm) (mm) (mm) (mm) (mm) DD E (mm) DD DD (mm) (mm) E (mm)
(SINGLE PRODUCT)
ONLY REVIEW WITHNESS & REVIEW(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN)
(PRINT NAME AND SIGN) (mm) (mm) (mm) (mm) DD E DD E B33 B34 E DD E B30 B31 (mm) (mm) (mm) (mm) DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) E DD E E DD E DD E DD E B28 B29 E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) B24 B25 B26 B27 DD E DD E DD E DD E (mm) (mm) (mm) (mm) (mm) (mm) (mm) B15 DD E DD E DD E (mm) (mm) B12 B13 B14 (mm) (mm) (mm) (mm) (mm) (mm) DD E DD E DD E B2 B3 4-6ARCH1 L1 DD (mm) (mm) e2 B1 DD L2 L3 PIEXE MARK E DD E (mm) (mm) (mm) (mm) B21 B22 B23 B20 DD E B16 B17 B18 B19 E B4 B5 B6 B7 DD E DD E E
INSPECTION REQUEST NO.: DATE : REPORT NO.: CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Surface Preparation: Sa 2.5 No. of Coats: Blasting & Painting Date: Weather :
Paint Specification: 25045-a1100-18-ssd-s-xxxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)
Paint Material: Relative Humidity (%): Dew Point (๐C)
1st 2nd 3rd 1st 2nd 3rd 1st 2nd 3rd
OTHER REMARKS (IF ANY):
Note: Refer to Sheet 3 of 3 for DFT Spot Measuring Keyplan.
DATE :
____________________________________________________________________________
DATE :
_____________________________________________________________________________
OBI REPRESENTATIVE : DATE :
________________________________________________________________
Document No. : 25045-A1126-18-ITR-S-006
(PRINT NAME AND SIGN)
Spot No. Spot No. Gage Readings
WITHNESS & REVIEW Primer Coat DFT (microns)
(PRINT NAME AND SIGN) ONLY REVIEW
CONTRACTOR QC REPRESENTATIVE :
SOJV QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
PAINTING INSPECTION REPORT
Average Average
Primer Coat DFT (microns) Spot No.
Primer Coat DFT (microns)
Average
INSPECTION REQUEST NO.: DATE : REPORT NO.: CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Surface Preparation: Sa 2.5 No. of Coats: One (1) Blasting & Painting Date: Weather :
Paint Specification: 25045-a1100-18-ssd-s-xxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)
Paint Material: Relative Humidity (%): Dew Point (๐C)
1st 2nd 3rd
DATE :
____________________________________________________________________________
DATE :
_____________________________________________________________________________
OBI REPRESENTATIVE : DATE :
________________________________________________________________
Document No. : 25045-A1126-18-ITR-S-006,form b
PAINTING INSPECTION REPORT
CONTRACTOR QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
(PRINT NAME AND SIGN)
Average DFT
(microns) Inspection Result Piece Mark
WITHNESS & REVIEW ONLY REVIEW
(PRINT NAME AND SIGN)
Spot No.
Primer Coat DFT (microns) Gage Readings
Average