PROJECT: The Bridges Phase 1 PROJECT NUMBER60520157 SHEET NUMBER1 CALCULATION TITLE: Cooling load Estimate PREPARED BYKamlesh 17/4/2017DATE CHECKED BYTanveer 17/4/2017DATE VERIFIED BYTanveer 17/4/2017DATE REVISIONA

REFERENCES/ NOTES:

COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-01 19,759

73,121

1,912.5 1,573.6 338.90 18%

2 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-02 19,751 1,855.1 1,517.8 337.30 18%

3 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-03 19,802 1,893.8 1,567.2 326.60 17%

4 Tower-01- Phase 1 (Ventilation) - 669.5 669.5 -

-5 Tower-02- Phase 1 (Ventilation) - 666.7 666.7 -

-6 Tower-03- Phase 1 (Ventilation) - 715.7 715.7 -

-TOTAL 59,313 73,121 7,713 6,710 -

-Plant Cooling Load (kW) Without Schedule 7,713 kW

2,193 TR

130.0 27.0 105.5

33.3

Total flow rate 206.99 l/s

Plant Cooling Load (kW) With Schedule 6,710 kW

1,908 TR

Diversity Factor of 90 % to be consider between three towers 0.9

Plant Cooling Load (kW) after diversity 6,0391,717 kWTR 2013

572

101.8 34.5 82.6 42.6

Total flow rate 162.07 l/s 54.0

PEAK COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-01 1,676.8 45.00 2 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-02 1,609.9 43.20 3 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-03 1,638.0 43.96

4 Tower-01- Phase 1 (Ventilation with 30% redundancy) 870.4 23.36 870.4

5 Tower-02- Phase 1 (Ventilation with 30% redundancy) 866.7 23.26 866.7

6 Tower-03- Phase 1 (Ventilation with 30% redundancy) 930.4 24.97 930.4

TOTAL 7,592 203.7

Peak Cooling Load (kW) for all three Towers 7,592 kW

2,159 TR

128.0 27.5 103.8

33.9

Total flow rate 203.7 l/s

Air Conditioned Area (m2)

GFA Area (Car Parking area Excluded) (m2)

Plant Cooling Load (kW) Without Schedule

Plant Cooling Load (kW) With Schedule Difference in Plant Load Reduction of Plant Load in (%)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

Peak Cooling

Load (kW) CHW Water Flow Rate (L/s)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

(2)

PROJECT: The Bridges Phase 1 PROJECT NUMBER60520157 SHEET NUMBER1 CALCULATION TITLE: Cooling load Estimate PREPARED BYKamlesh 17/4/2017DATE CHECKED BYTanveer 17/4/2017DATE VERIFIED BYTanveer 17/4/2017DATE REVISIONA

REFERENCES/ NOTES:

COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-01 19,699

73,121

1,910.6 1,570.4 340.20 18%

2 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-02 19,609 1,842.0 1,506.7 335.30 18%

3 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-03 19,748 1,888.8 1,558.4 330.40 17%

4 Tower-01- Phase 1 (Ventilation) - 664.3 664.3 -

-5 Tower-02- Phase 1 (Ventilation) - 635.0 635.0 -

-6 Tower-03- Phase 1 (Ventilation) - 697.4 697.4 -

-TOTAL 59,057 73,121 7,638 6,632 -

-Plant Cooling Load (kW) Without Schedule 7,638 kW

2,172 TR

129.3 27.2 104.5

33.7

Total flow rate 204.97 l/s

Plant Cooling Load (kW) With Schedule 6,632 kW

1,886 TR

Diversity Factor of 90 % to be consider between three towers 0.9

Plant Cooling Load (kW) after diversity 5,9691,697 kWTR 1990

566

101.1 34.8 81.6 43.1

Total flow rate 160.18 l/s

PEAK COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-01 1,672.4 44.88 2 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-02 1,602.9 43.01 3 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-03 1,623.5 43.57

4 Tower-01- Phase 1 (Ventilation with 30% redundancy) 863.5 23.17 11.59 8.91 332.1 431.8

5 Tower-02- Phase 1 (Ventilation with 30% redundancy) 825.5 22.15 11.08 8.52 317.5 412.8

6 Tower-03- Phase 1 (Ventilation with 30% redundancy) 906.7 24.33 12.17 9.36 348.7 453.3

TOTAL 7,495 201.1

863.538

Peak Cooling Load (kW) for all three Towers 7,495 kW

2,131 TR

126.9 27.7 102.5

34.3

Total flow rate 201.1 l/s

Air Conditioned Area (m2)

GFA Area (Car Parking area Excluded) (m2)

Plant Cooling Load (kW) Without Schedule

Plant Cooling Load (kW) With Schedule Difference in Plant Load Reduction of Plant Load in (%)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

Peak Cooling

Load (kW) CHW Water Flow Rate (L/s)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

(3)

PROJECT: The Bridges Phase 1 PROJECT NUMBER60520157 SHEET NUMBER1 CALCULATION TITLE: Cooling load Estimate PREPARED BYKamlesh 17/4/2017DATE CHECKED BYTanveer 17/4/2017DATE VERIFIED BYTanveer 17/4/2017DATE REVISIONA

REFERENCES/ NOTES:

COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-01 19,759

73,121

1,918.3 1,578.1 340.20 18%

2 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-02 19,707 1,879.3 1,543.7 335.60 18%

3 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-03 19,881 1,937.1 1,606.2 330.90 17%

4 Tower-01- Phase 1 (Ventilation) - 664.3 664.3 -

-5 Tower-02- Phase 1 (Ventilation) - 635.0 635.0 -

-6 Tower-03- Phase 1 (Ventilation) - 697.4 697.4 -

-TOTAL 59,348 73,121 7,731 6,725 -

-Plant Cooling Load (kW) Without Schedule 7,731 kW

2,198 TR

130.3 27.0 105.7

33.3

Total flow rate 207.48 l/s

Plant Cooling Load (kW) With Schedule 6,725 kW

1,912 TR

Diversity Factor of 90 % to be consider between three towers 0.9

Plant Cooling Load (kW) after diversity 6,0521,721 kWTR

102.0 34.5 82.8 42.5

Total flow rate 162.41 l/s

PEAK COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-01 1,672.4 44.88 2 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-02 1,602.9 43.01 3 Recirculating Units cooling load (FCU'S) (Peak Load) - Tower-03 1,623.5 43.57

4 Tower-01- Phase 1 (Ventilation with 30% redundancy) 863.5 23.17

5 Tower-02- Phase 1 (Ventilation with 30% redundancy) 825.5 22.15

6 Tower-03- Phase 1 (Ventilation with 30% redundancy) 906.7 24.33

TOTAL 7,495 201.1

Peak Cooling Load (kW) for all three Towers 7,495 kW

2,131 TR

126.3 27.9 102.5

34.3

Total flow rate 201.1 l/s

Air Conditioned Area (m2)

GFA Area (Car Parking area Excluded) (m2)

Plant Cooling Load (kW) Without Schedule

Plant Cooling Load (kW) With Schedule Difference in Plant Load Reduction of Plant Load in (%)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

Peak Cooling

Load (kW) CHW Water Flow Rate (L/s)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

(4)

PROJECT: The Bridges Phase 1 PROJECT NUMBER60520157 SHEET NUMBER1 CALCULATION TITLE: Cooling load Estimate PREPARED BYKamlesh 11/4/2017DATE CHECKED BYTanveer 11/4/2017DATE VERIFIED BYTanveer 11/4/2017DATE REVISIONA

REFERENCES/ NOTES:

COOLING LOAD SUMMARY

Sl. No. Description

1 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-01 19,759

73,121

1,918.3 1,578.1 340.20 18%

2 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-02 19,707 1,879.3 1,543.7 335.60 18%

3 Recirculating Units cooling load (FCU'S) (Plant Load) - Tower-03 19,881 1,937.1 1,606.2 330.90 17%

4 Tower-01- Phase 1 (Ventilation) - 664.3 664.3 -

-5 Tower-02- Phase 1 (Ventilation) - 635.0 635.0 -

-6 Tower-03- Phase 1 (Ventilation) - 697.4 697.4 -

-TOTAL 59,348 73,121 7,731 6,725 -

-Plant Cooling Load (kW) Without Schedule 7,731 kW

2,198 TR

130.3 27.0 105.7

33.3

Total flow rate 207.48 l/s

Plant Cooling Load (kW) With Schedule 6,7251,912 kW

TR

Diversity Factor of 90 % to be consider between three towers 0.9

Plant Cooling Load (kW) after diversity 6,0521,721 kW

TR 102.0

34.5 82.8 42.5

Total flow rate 162.41 l/s

Number of Heat Exchangers 3 Nos

Each HEX Capacity 574 TR

CHW Pumps (3 Duty +1 standby) 54.1 l/s

Air Conditioned Area (m2)

GFA Area (Car Parking area Excluded) (m2)

Plant Cooling Load (kW) Without Schedule

Plant Cooling Load (kW) With Schedule Difference in Plant Load Reduction of Plant Load in (%)

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

As per GFA (m2/TR) m2/TR

As per Air Conditioned area (W/m2) W/m2

As per Air Conditioned area (m2/TR) m2/TR

As per GFA (W/m2) W/m2

(5)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-1

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

BASEMENT-2

Basement 2

MCC Room B2.06.25 T1 MCC Room_Basement 15 4.9 4.9 399 0.13

Electrical Room B2.06.18 T1 Electrical Room_Basement 6 2.8 2.8 222 0.08

Store Store_Basement 6

Lift Lobby B2.00.01 T1 Lobby_Basement 17 2.5 2.5 213 0.07

Lobby B2.00.02 T1 Corridor (Typical Floors) 8 2 2 166 0.05

Sewer Sump Room B2.06.78 Pump Room 15

Sub Total 67 12 12 1000 0.33 BASEMENT-1 Basement 1 MCC Room B1.06.26 T1 MCC Room_Basement 15 5.1 5.1 412 0.14 Store Store_Basement 6 Store - B1.09.02-T1 Store_Basement 23 3.2 3.2 266 0.09

Electrical Room B1.06.18 T1 Electrical Room_Basement 6 2.8 2.8 222 0.08

Lobby B1.00.01 T1 Corridor (Typical Floors) 8 2 2 166 0.05

Lift Lobby B1.00.02 T1 Lobby_Basement 17 2.5 2.5 213 0.07

Waste Room B1.06.95 T1 Waste Room 50 6.5 6.5 832

Store1 - B1.09.01-T1 Store_Basement 42 2.8 2.8 212 0.08

Server Room B1.07.15 T1 ELV Server Room 40 44.5 44.5 3935 1.19

Security Room B1.07.10 T1 Security Control Room 22 5.3 5.3 467 0.14

Main Tel-B1.06.82-T1 Main Tel-B1.06.82 22 29.5 29.5 2570 0.79

Pump Room B1.06.76 T1 Pump Room 50 5.4 5.4 443 0.14

Sub Total 301 110 110 9738 2.77

GROUND FLOOR-T1

Ground Floor-T1

Gym T1.GF.03.01 Gym 132 28 25.4 2082 0.68

Male Toilet T1.GF.03.15 Toilet 20 0.9 1.2 67 0.03

Electrical Room T1.GF.06.18 Electrical Room (Typical Floors) 6 2.8 2.8 222 0.08

Telecom Room T1.GF.06.85 Floor Technology Room 6 5.7 5.7 496 0.15

Lobby T1.GF.00.01 Corridor (Typical Floors) 8 2 2 168 0.05

BOH Corridor T1.GF.06.05 Corridor (Typical Floors) 19 1.4 1.4 116 0.04

StoreGF-T1 Store 31 0.7 0.7 57 0.02

MV Room T1.GF.06.85 HV Room 40 8.1 8.1 646 0.22

LV Room T1.GF.06.58 LV Room 140 25.8 25.8 2119 0.69

Lobby T1.GF.00.01 Lobby 40 6.5 6.5 526 0.17

Corridor T1.GF.00.05 Corridor (Typical Floors) 50 1.8 1.8 150 0.05

FCC/BMS T1.GF.06.45 FCC/BMS 22 7.6 7.6 684 0.20

Emergency LV Room T1.GF.06.28 Emergency LV Room 28 4.2 4.2 336 0.11

Lift Lobby T1.GF.00.02 Elevator Lobby 17 2.5 2.5 213 0.07

(6)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-1

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Ground Floor-T1

Waste Corridor T1.GF.06.90 Corridor (Typical Floors) 10 1.4 1.4 115

Sub Total 591 104 102 8407 2.74

APARTMENT TYPE-1 (1F)

Phase-1 -First Floor -Tower-1

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 286 0.10

1 B/R Apartment (A)-(23) 1 B/R Apartment 54 3.5 3.8 287 0.10

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.5 3.8 291 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4.1 4.4 349 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.7 4 306 0.11

1 B/R Apartment (B)-(28) 1 B/R Apartment 54 4.1 4.5 348 0.12

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 77 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.6 4 303 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.8 1.8 152 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 4.3 4.6 369 0.12

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-BEDROOM(25) 24 1.6 1.6 159 0.04

Sub Total 603 38 42 3321 1.14

APARTMENT TYPE-1 (2F-15F)

Phase-1 -Floor Type-1 (2F-15F)

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 286 0.10

1 B/R Apartment (A)-(23) 1 B/R Apartment 54 3.5 3.8 287 0.10

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.5 3.9 289 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4.2 4.5 350 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.5 3.8 294 0.10

1 B/R Apartment (B)-(28) 1 B/R Apartment 54 4.1 4.5 348 0.12

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 77 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.6 4 303 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.8 1.8 152 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 4.3 4.6 369 0.12

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-BEDROOM(25) 24 1.6 1.6 159 0.04

Sub Total 604 37 42 3308 1.14

APARTMENT TYPE-2 (16F-18F)

Phase-1 -Floor Type-2 (16F-18F)

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 77 0.02

2 B/R Apartment (A)-Living/Dining(22) 2 B/R Apartment 54 3.5 3.8 288 0.10

2 B/R Apartment (A)-Master Bedroom(22) 29 0.9 0.9 77 0.02

(7)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-1

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -Floor Type-2 (16F-18F)

2 B/R Apartment (A)-Master Bedroom(23) 2 B/R Apartment 29 0.9 0.9 77 0.02

2 B/R Apartment (D)-Living/Dining(25) 2 B/R Apartment 54 4.2 4.5 359 0.12

2 B/R Apartment (D)-Master Bedroom(25) 29 0.9 0.9 81 0.02

2 B/R Apartment (D)-Living/Dining(26) 2 B/R Apartment 54 4.2 4.6 360 0.12

2 B/R Apartment (D)-Master Bedroom(26) 29 0.9 0.9 81 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.5 3.8 288 0.10

2 B/R Apartment (B)-Master Bedroom(20) 24 1.8 1.8 152 0.05

3 B/R Apartment (A-LIVING ROOM(24)

3 B/R Apartment

69 4.3 4.6 369 0.12

3 B/R Apartment (A)-MASTER BEDROOM(24) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-BEDROOM(24) 24.3 1.6 1.6 159 0.04

Sub Total 612 36 38 3051 1.03

APARTMENT TYPE-3 (19F-25F)

Phase-1 -Floor Type-3 (19F-25F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 57.7 3.5 3.8 288 0.10 2 B/R Apartment(C)-Master Bedroom-(21) 28.7 0.9 0.9 77 0.02 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 53.6 4.2 4.5 359 0.12 2 B/R Apartment(D)-Master Bedroom-(25) 28.7 0.9 0.9 81 0.02 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 53.6 4.2 4.6 360 0.12 2 B/R Apartment(D)-Master Bedroom-(26) 28.7 0.9 0.9 81 0.02 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 68.9 4.3 4.6 369 0.12

3 B/R Apartment (A)-Master Bedroom(24) 24.3 1.2 1.2 105 0.03

3 B/R Apartment (A)-Bedroom(24) 25.0 1.6 1.6 159 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60.0 3.2 3.5 275 0.09

3 B/R Apartment (B)-Master Bedroom(22) 30.0 1.2 1.2 108 0.03

3 B/R Apartment (B)-Bedroom(22) 21.0 1.1 1.1 110 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60.0 3.2 3.5 275 0.09

3 B/R Apartment (B)-Master Bedroom(23) 30.0 1.2 1.2 108 0.03

3 B/R Apartment (B)-Bedroom(23) 21.0 1.1 1.1 110 0.03

Studio Apartment Studio Apartment 29.0 3.4 3.6 278 0.10

Sub Total 620 36 38 3143 1.03

APARTMENT TYPE-3-(26F)

Phase-1 -Floor Type-3 (26F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 58 3.6 4.1 308 0.11 2 B/R Apartment(C)-Master Bedroom-(21) 29 1.1 1.1 88 0.03 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 54 4.7 5.1 390 0.14 2 B/R Apartment(D)-Master Bedroom-(25) 29 1.2 1.2 97 0.03 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 54 4.6 5 391 0.13 2 B/R Apartment(D)-Master Bedroom-(26) 29 1.2 1.2 97 0.03 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 69 4.3 4.6 369 0.12

(8)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-1

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -Floor Type-3 (26F) 3 B/R Apartment (A)-Bedroom(24)

3 B/R Apartment

25 1.6 1.6 159 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60 3.5 3.9 303 0.10

3 B/R Apartment (B)-Master Bedroom(22) 30 1.4 1.4 119 0.04

3 B/R Apartment (B)-Bedroom(22) 21 1.2 1.2 119 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60 3.5 3.9 303 0.10

3 B/R Apartment (B)-Master Bedroom(23) 30 1.3 1.3 111 0.03

3 B/R Apartment (B)-Bedroom(23) 21 1.2 1.2 117 0.03

Studio Apartment Studio Apartment 29 3.5 3.8 294 0.10

Sub Total 621 39 42 3370 1.12

Phase-1-TYPICAL CORE AREAS (1F-26F)

Phase-1 -Typical Core (1F-26F)

Electrical Room Electrical Room (Typical Floors) 6 3.8 3.8 305 0.10

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 203 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 172 0.06

Lift Lobby Elevator Lobby 17 5.5 6.3 455 0.17

Corridor Corridor (Typical Floors) 77

Sub Total 114 14 15 1135 0.39

ROOF

Phase-1 -Roof

Electrical Room Electrical Room (Roof) 6 2.9 2.9 226 0.08

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 207 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 170 0.06

Lift Lobby Elevator Lobby 17 2.7 2.7 222 0.07

MCC Room MCC Room 15 5.5 5.5 448 0.15

Roof Potable Water Pump Room Pump Room 25 2 2.1 131 0.06

Sub Total 77 18 18 1404 0.47

COOLING LOAD SUMMARY FOR TOWER / APARTMENT AREA

SPACE AREA PER FLOOR (Sq m) TOTAL COIL LOAD PER FLOOR (KW) CHW FLOW RATE PER FLOOR (L/s) TOTAL CHW FLOW (L/s)

BASEMENT-2 67 12 1000 0.33 1 12 1,000 0.33

BASEMENT-1 301 110 9738 2.77 1 110 9,738 2.77

GROUND FLOOR-T1 591 102 8407 2.74 1 102 8,407 2.74

APARTMENT TYPE-1 (1F) 603 42 3321 1.14 1 42 3,321 1.14

DESIGN AIR FLOW PER

(9)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-1

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S) KW KW L/S APARTMENT TYPE-1 (2F-15F) 604 42 3308 1.14 14 592 46,312 15.89 APARTMENT TYPE-2 (16F-18F) 612 38 3051 1.03 3 115 9,153 3.08 APARTMENT TYPE-3 (19F-25F) 620 38 3143 1.03 7 267 22,001 7.18 APARTMENT TYPE-3-(26F) 621 42 3370 1.12 1 42 3,370 1.12

Phase-1-TYPICAL CORE AREAS (1F-26F) 114 15 1135 0.39 26 377 29,510 10.12

ROOF 77 18 1404 0.47 1 18 1,404 0.47

(10)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-2

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

BASEMENT-2

Basement 2

Electrical Room B2.06.20 T2 Electrical Room_Basement 6 2.8 2.8 222 0.08

Store Store_Basement 6

Lift Lobby B2.00.03 T2 Lobby_Basement 17 2.5 2.5 213 0.07

Lobby B2.00.04 T2 Corridor (Typical Floors) 8 2 2 166 0.05

Sewer Sump Room B2.06.79 Pump Room 15

Sub Total 52 7 7 601 0.20

BASEMENT-1

Basement 1

Store Store_Basement 6

Electrical Room B1.06.20 T2 Electrical Room_Basement 6 2.8 2.8 222 0.08

Lobby B1.00.03 T2 Corridor (Typical Floors) 8 2 2 166 0.05

Lift Lobby B1.00.04 T2 Lobby_Basement 17 2.5 2.5 213 0.07

Pool Plant Room B1.06.72 T2 Pool Plant Room 82 7.6 7.6 584 0.20

MCC Room B1.06.23 T2 MCC Room_Basement 24 5.1 5.1 412 0.14

Main Tel-B1.06.81-T2 Main Tel-B1.06.81 17 30.1 30.1 2624 0.81

Sub Total 160 50 50 4221 1.34

GROUND FLOOR-T2

Ground Floor-T2

Electrical Room T2.GF.06.20 Electrical Room (Typical Floors) 6 2.8 2.8 22 0.08

Telecom T2.GF.06.86 Floor Technology Room 6 5.7 5.7 496 0.15

Lobby T2.GF.00.03 Corridor (Typical Floors) 8 2 2 168 0.05

Community Club T2.GF.03.04 Community Facility 141 17.1 20.6 1365 0.55

Kids Play Area T2.GF.03.07 Kids Play Area 52 9.9 10.2 819 0.27

Kids Toilet T2.GF.03.14 Toilet 0.00

Male & FemaleToilet T2.GF Toilet 60 2.8 3.4 211 0.09

ETS Room ETS Room 220 9.5 9.5 627 0.25

Electrical Room T2.GF.06.22 Electrical Room 34 25.1 25.1 1973 0.67

Electrical Room T2.GF.06.23 Electrical Room 32 5.6 5.6 453 0.15

FCC/BMS T2.GF.06.45 FCC/BMS 26 8.1 8.1 702 0.22

Lobby T2.GF.00.01 Lobby 65 6.5 7 530 0.19

Lift Lobby T2.GF.00.04 Elevator Lobby 17 2.6 2.6 217 0.07

Sub Total 667 95 99 7583 2.75

APARTMENT TYPE-1 (1F)

Phase-1 -First Floor Tower-2

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 286 0.10

1 B/R Apartment (A)-(23) 1 B/R Apartment 54 3.5 3.8 287 0.10

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.5 3.9 289 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4.2 4.5 350 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.5 3.8 294 0.10

(11)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-2

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -First Floor Tower-2 2 B/R Apartment (A)-Living/Dining(21)2 B/R Apartment (A)-MASTER BEDROOM(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

29 0.9 0.9 77 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.7 4 308 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.9 1.9 157 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 4.4 4.7 373 0.13

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.3 1.3 110 0.03

3 B/R Apartment (A)-BEDROOM(25) 24 1.7 1.7 166 0.05

Sub Total 603 38 43 3334 1.15

APARTMENT TYPE-1 (2F-15F)

Phase-1 -Floor Type-1 (2F-15F)

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 286 0.10

1 B/R Apartment (A)-(23) 1 B/R Apartment 54 3.5 3.8 287 0.10

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.5 3.9 289 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4.2 4.5 350 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.5 3.8 294 0.10

1 B/R Apartment (B)-(28) 1 B/R Apartment 54 4.1 4.5 348 0.12

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 77 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.6 4 303 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.8 1.8 152 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 4.3 4.6 369 0.12

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-BEDROOM(25) 24.3 1.6 1.6 159 0.04

Sub Total 604 37 42 3308 1.14

APARTMENT TYPE-2 (16F-18F)

Phase-1 -Floor Type-2 (16F-18F)

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 77 0.02

2 B/R Apartment (A)-Living/Dining(22) 2 B/R Apartment 54 3.5 3.8 288 0.10

2 B/R Apartment (A)-Master Bedroom(22) 29 0.9 0.9 77 0.02

2 B/R Apartment (A)-Livinf/Dining(23) 2 B/R Apartment 54 3.5 3.9 289 0.10

2 B/R Apartment (A)-Master Bedroom(23) 29 0.9 0.9 77 0.02

2 B/R Apartment (D)-Living/Dining(25) 2 B/R Apartment 54 4.2 4.5 359 0.12

2 B/R Apartment (D)-Master Bedroom(25) 29 0.9 0.9 81 0.02

2 B/R Apartment (D)-Living/Dining(26) 2 B/R Apartment 54 4.2 4.6 360 0.12

2 B/R Apartment (D)-Master Bedroom(26) 29 0.9 0.9 81 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.5 3.8 288 0.10

2 B/R Apartment (B)-Master Bedroom(20) 24 1.8 1.8 152 0.05

3 B/R Apartment (A-LIVING ROOM(24)

3 B/R Apartment

69 4.3 4.6 369 0.12

(12)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-2

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -Floor Type-2 (16F-18F)

3 B/R Apartment (A)-BEDROOM(24)

3 B/R Apartment

24 1.6 1.6 159 0.04

Sub Total 612 36 38 3051 1.03

APARTMENT TYPE-3 (19F-25F)

Phase-1 -Floor Type-3 (19F-25F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 58 3.5 3.8 288 0.10 2 B/R Apartment(C)-Master Bedroom-(21) 29 0.9 0.9 77 0.02 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 54 4.2 4.5 359 0.12 2 B/R Apartment(D)-Master Bedroom-(25) 29 0.9 0.9 81 0.02 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 54 4.2 4.6 360 0.12 2 B/R Apartment(D)-Master Bedroom-(26) 29 0.9 0.9 81 0.02 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 69 4.3 4.6 369 0.12

3 B/R Apartment (A)-Master Bedroom(24) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-Bedroom(24) 25 1.6 1.6 159 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60 3.2 3.5 275 0.09

3 B/R Apartment (B)-Master Bedroom(22) 30 1.2 1.2 108 0.03

3 B/R Apartment (B)-Bedroom(22) 21 1.1 1.1 110 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60 3.2 3.5 275 0.09

3 B/R Apartment (B)-Master Bedroom(23) 30 1.2 1.2 108 0.03

3 B/R Apartment (B)-Bedroom(23) 21 1.1 1.1 110 0.03

Studio Apartment Studio Apartment 29 3.4 3.6 278 0.10

Sub Total 621 36 38 3143 1.03

APARTMENT TYPE-3-(26F)

Phase-1 -Floor Type-3 (26F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 58 3.6 4.1 308 0.11 2 B/R Apartment(C)-Master Bedroom-(21) 29 1.1 1.1 88 0.03 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 54 4.7 5.1 390 0.14 2 B/R Apartment(D)-Master Bedroom-(25) 29 1.2 1.2 97 0.03 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 54 4.6 5 391 0.13 2 B/R Apartment(D)-Master Bedroom-(26) 29 1.2 1.2 97 0.03 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 69 4.3 4.6 369 0.12

3 B/R Apartment (A)-Master Bedroom(24) 24 1.2 1.2 105 0.03

3 B/R Apartment (A)-Bedroom(24) 25 1.6 1.6 159 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60 3.5 3.9 303 0.10

3 B/R Apartment (B)-Master Bedroom(22) 30 1.4 1.4 119 0.04

3 B/R Apartment (B)-Bedroom(22) 21 1.2 1.2 119 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60 3.5 3.9 303 0.10

3 B/R Apartment (B)-Master Bedroom(23) 30 1.3 1.3 111 0.03

3 B/R Apartment (B)-Bedroom(23) 21 1.2 1.2 117 0.03

Studio Apartment Studio Apartment 29 3.5 3.8 294 0.10

(13)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-2

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1-TYPICAL CORE AREAS (1F-26F)

Phase-1 -Typical Core (1F-26F)

Electrical Room Electrical Room (Typical Floors) 6 3.8 3.8 305 0.10

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 203 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 172 0.06

Lift Lobby Elevator Lobby 17 5.5 6.3 458 0.17

Corridor Corridor (Typical Floors) 77

Sub Total 114 14 15 1138 0.39

ROOF

Phase-1 -Roof

Electrical Room Electrical Room (Roof) 6 2.9 2.9 226 0.08

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 207 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 170 0.06

Lift Lobby Elevator Lobby 17 2.7 2.7 222 0.07

MCC Room MCC Room 15 5.5 5.5 448 0.15

Roof Potable Water Pump Room Pump Room 25 2 2.1 131 0.06

Sub Total 77 18 18 1404 0.47

COOLING LOAD SUMMARY FOR TOWER / APARTMENT AREA

SPACE AREA PER FLOOR (Sq m) TOTAL COIL LOAD PER FLOOR (KW) CHW FLOW RATE PER FLOOR (L/s) TOTAL CHW FLOW (L/s)

BASEMENT-2 52 7 601 0.20 1 7 601 0.20 BASEMENT-1 160 50 4221 1.34 1 50 4,221 1.34 GROUND FLOOR-T2 667 99 7583 2.75 1 99 7,583 2.75 APARTMENT TYPE-1 (1F) 603 43 3334 1.15 1 43 3,334 1.15 APARTMENT TYPE-1 (2F-15F) 604 42 3308 1.14 14 592 46,312 15.89 APARTMENT TYPE-2 (16F-18F) 612 38 3051 1.03 3 115 9,153 3.08 APARTMENT TYPE-3 (19F-25F) 621 38 3143 1.03 7 267 22,001 7.18 APARTMENT TYPE-3-(26F) 621 42 3370 1.12 1 42 3,370 1.12

Phase-1-TYPICAL CORE AREAS (1F-26F) 114 15 1138 0.39 26 377 29,588 10.12

ROOF 77 18 1404 0.47 1 18 1,404 0.47

TOTAL

56

1610

127567

43.29

DESIGN AIR FLOW PER

(14)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S) KW KW L/S BASEMENT-2 Basement 2 MCC Room B2.06.24 T3 MCC Room_Basement 17 5 5 402 0.13 Store Store_Basement 6

Lift Lobby B2.00.05 T3 Lobby_Basement 17 2.5 2.5 213 0.07

Lobby B2.00.06 T3 Corridor (Typical Floors) 8 2 2 166 0.05

Electrical Room B2.06.21 T3 Electrical Room_Basement 6 2.8 2.8 222 0.08

Sewer Sump Room B2.06.80 Pump Room 15

Potable Water Pump Room B2.06.75 T3 Pump Room 42 4.5 4.5 316 0.12

Sub Total 111 17 17 1319 0.45

BASEMENT-1

Basement 1

MCC Room B1.06.24 T3 MCC Room_Basement 17 5 5 402 0.13

Store Store_Basement 6

Electrical Room B1.06.21 T3 Electrical Room_Basement 6 2.8 2.8 222 0.08

Lobby_ B1.00.05 T3 Corridor (Typical Floors) 8 2 2 166 0.05

Lift Lobby B1.00.06 T3 Lobby_Basement 17 2.5 2.5 213 0.07

Main Tel-B1.06.80-T3 Main Tel-B1.06.80 13 30.4 30.4 2659 0.82

Irrigation Pump Room B1 Pump Room 22 4.7 4.7 389 0.13

Store - B1.09.02-T3 Store_Basement 34 3.2 3.2 266 0.09

Sub Total 123 51 51 4317 1.36

GROUND FLOOR-T3

Ground Floor-T3

Gym T3.GF.03.01 Gym 132 28.3 25.7 2096 0.69

Male Toilet T3.GF.03.15 Toilet 20 0.9 1.2 67 0.03

Electrical Room T3.GF.06.21 Electrical Room (Typical Floors) 6 3.8 3.8 305 0.10

Telecom Room T3.GF.06.87 Floor Technology Room 6 5.7 5.7 496 0.15

Lobby T3.GF.00.05 Corridor (Typical Floors) 8 2.1 2.1 172 0.06

Waste Room T3.GF.06.95 Waste Room 104 11.4 11.4 1446

Waste Corridor Corridor (Typical Floors) 10 1.3 1.3 101

MV Room T3.GF.06.65 HV Room 50 8.4 8.4 674 0.23

LV Room T3.GF.06.58 LV Room 107 27.5 27.5 2180 0.74

Lobby T3.GF.00.01 Lobby 40 6 6 491 0.16

Corridor T3.GF.00.08 , T3.GF.00.07 Corridor (Typical Floors) 47 1.6 1.6 136 0.04

FCC/BMS T3.GF.06.45 FCC/BMS 22 7.9 7.9 684 0.21

Store T3.GF.09.01 Storage 57 1.5 1.5 117 0.04

Lift Lobby T3.GF.00.06 Elevator Lobby 17 2.6 2.6 217 0.07

FM Tech Office T3.GF.10.02 FM Office 56 10.8 10.8 887 0.29

FM Tech Meeting T3.GF.10.01 FM Office 17 5.5 5.5 448 0.15

(15)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S) KW KW L/S AMENITIES AMENITIES Retails/F&B B-1 Retails/F&B 29 5 5 463 0.13 Retails/F&B GF Retails/F&B 90 14.1 14.1 1172 0.38 Sub Total 119 19 19 1635 0.51 APARTMENT TYPE-1 (1F)

Phase-1 -First Floor Tower-3

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 293 0.10

(16)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -First Floor Tower-3

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.5 3.9 299 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4 4.3 336 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.6 4 297 0.11

1 B/R Apartment (B)-(28) 1 B/R Apartment 54 3.9 4.3 334 0.12

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.8 296 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 81 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.8 4.1 319 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.7 1.7 144 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 3.7 4.1 319 0.11

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.1 1.1 90 0.03

3 B/R Apartment (A)-BEDROOM(25) 24 1.4 1.4 139 0.04

Sub Total 603 36 41 3241 1.11

APARTMENT TYPE-1 (2F-15F)

Phase-1 -Floor Type-1 (2F-15F)

1 B/R Apartment (A)-(22) 1 B/R Apartment 54 3.5 3.8 293 0.10

1 B/R Apartment (A)-(23) 1 B/R Apartment 54 3.5 3.8 294 0.10

1 B/R Apartment (A)-(24) 1 B/R Apartment 54 3.6 3.9 296 0.10

1 B/R Apartment (A)-(26) 1 B/R Apartment 54 4 4.3 336 0.12

1 B/R Apartment (A)-(27) 1 B/R Apartment 54 3.5 3.8 287 0.10

1 B/R Apartment (B)-(28) 1 B/R Apartment 54 3.9 4.3 334 0.12

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.8 296 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 81 0.02

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.8 4.1 313 0.11

2 B/R Apartment (B)-MASTER BEDROOM(20) 25 1.7 1.7 143 0.05

3 B/R Apartment (A)-Living/Dining(25)

3 B/R Apartment

69 3.7 4.1 319 0.11

3 B/R Apartment (A)-MASTER BEDROOM(25) 24 1.1 1.1 90 0.03

3 B/R Apartment (A)-BEDROOM(25) 24.3 1.4 1.4 139 0.04

Sub Total 604 36 41 3221 1.10

APARTMENT TYPE-2 (16F-18F)

Phase-1 -Floor Type-2 (16F-18F)

2 B/R Apartment (A)-Living/Dining(21) 2 B/R Apartment 54 3.5 3.8 296 0.10

2 B/R Apartment (A)-MASTER BEDROOM(21) 29 0.9 0.9 81 0.02

2 B/R Apartment (A)-Living/Dining(22) 2 B/R Apartment 54 3.5 3.9 296 0.10

2 B/R Apartment (A)-Master Bedroom(22) 29 0.9 0.9 81 0.02

2 B/R Apartment (A)-Livinf/Dining(23) 2 B/R Apartment 54 3.5 3.8 296 0.10

2 B/R Apartment (A)-Master Bedroom(23) 29 0.9 0.9 81 0.02

2 B/R Apartment (D)-Living/Dining(25) 2 B/R Apartment 54 4.1 4.5 344 0.12

2 B/R Apartment (D)-Master Bedroom(25) 29 0.9 0.9 77 0.02

2 B/R Apartment (D)-Living/Dining(26) 2 B/R Apartment 54 4.1 4.5 345 0.12

(17)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -Floor Type-2 (16F-18F)

2 B/R Apartment (B)-Living/Dining(20) 2 B/R Apartment 58 3.6 3.9 299 0.10

2 B/R Apartment (B)-Master Bedroom(20) 24 1.7 1.7 143 0.05

3 B/R Apartment (A-LIVING ROOM(24)

3 B/R Apartment

69 3.7 4.1 319 0.11

(18)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1 -Floor Type-2 (16F-18F)

3 B/R Apartment (A)-BEDROOM(24)

3 B/R Apartment

24 1.4 1.4 139 0.04

Sub Total 612 35 37 2964 1.00

APARTMENT TYPE-3 (19F-25F)

Phase-1 -Floor Type-3 (19F-25F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 58 3.6 3.9 299 0.10 2 B/R Apartment(C)-Master Bedroom-(21) 29 0.9 0.9 81 0.02 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 54 4.1 4.5 344 0.12 2 B/R Apartment(D)-Master Bedroom-(25) 29 0.9 0.9 77 0.02 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 54 4.1 4.5 345 0.12 2 B/R Apartment(D)-Master Bedroom-(26) 29 0.9 0.9 77 0.02 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 69 3.7 4.1 319 0.11

3 B/R Apartment (A)-Master Bedroom(24) 24 1.1 1.1 90 0.03

3 B/R Apartment (A)-Bedroom(24) 25 1.4 1.4 139 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60 3.3 3.7 285 0.10

3 B/R Apartment (B)-Master Bedroom(22) 30 1.3 1.3 112 0.03

3 B/R Apartment (B)-Bedroom(22) 21 1.1 1.1 111 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60 3.3 3.7 284 0.10

3 B/R Apartment (B)-Master Bedroom(23) 30 1.3 1.3 112 0.03

3 B/R Apartment (B)-Bedroom(23) 21 1.1 1.1 111 0.03

Studio Apartment Studio Apartment 29 3.3 3.6 273 0.10

Sub Total 621 35 38 3059 1.02

APARTMENT TYPE-3-(26F)

Phase-1 -Floor Type-3 (26F)

2 B/R Apartment(C)-Living/Dining-(21) 2 B/R Apartment 58 3.9 4.3 332 0.12 2 B/R Apartment(C)-Master Bedroom-(21) 29 1.2 1.2 97 0.03 2 B/R Apartment(D)-Living/Dining-(25) 2 B/R Apartment 54 4.3 4.6 362 0.12 2 B/R Apartment(D)-Master Bedroom-(25) 29 1.1 1.1 88 0.03 2 B/R Apartment(D)-Living/Dining-(26) 2 B/R Apartment 54 4.3 4.7 362 0.13 2 B/R Apartment(D)-Master Bedroom-(26) 29 1.1 1.1 88 0.03 3 B/R Apartment (A)-Living/Dining(24) 3 B/R Apartment 69 3.7 4.1 319 0.11

3 B/R Apartment (A)-Master Bedroom(24) 24 1.1 1.1 90 0.03

3 B/R Apartment (A)-Bedroom(24) 25 1.4 1.4 139 0.04

3 B/R Apartment (B)-Living/Dining(22)

3 B/R Apartment

60 3.7 4.1 319 0.11

3 B/R Apartment (B)-Master Bedroom(22) 30 1.6 1.6 130 0.04

3 B/R Apartment (B)-Bedroom(22) 21 1.3 1.3 125 0.03

3 B/R Apartment (B)-Living/Dining(23)

3 B/R Apartment

60 3.7 4.1 319 0.11

3 B/R Apartment (B)-Master Bedroom(23) 30 1.4 1.4 119 0.04

3 B/R Apartment (B)-Bedroom(23) 21 1.3 1.3 123 0.03

Studio Apartment Studio Apartment 29 3.5 3.7 286 0.10

(19)

PROJECT:

The Bridges Phase 1

PROJECT NUMBER SHEET NUMBER

60520157 1

CALCULATION TITLE:

COOLING LOAD ESTIMATE

PREPARED BY DATE CHECKED BY DATE VERIFIED BY DATE REVISION

KAMLESH 11-Apr-17 TANVEER 11-Apr-17 TANVEER 11-Apr-17 A

TOWER/ APARTMENTS COOLING LOAD CALCULATION FOR TOWER-3

FLOORS

SPACE INFORMATION HAP LOAD (WITHOUT FA)-WITH SCHEDULE Chilled Water

SPACE NAME ROOM TEMPLATE AREA (Sq. m)

SENSIBLE COIL LOAD TOTAL COIL LOAD DESIGN AIR FLOW

CHW Flow (L/S)

KW KW L/S

Phase-1-TYPICAL CORE AREAS (1F-26F)

Phase-1 -Typical Core (1F-26F)

Electrical Room Electrical Room (Typical Floors) 6 3.8 3.8 305 0.10

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 204 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 172 0.06

Lift Lobby Elevator Lobby 17 5.5 6.3 455 0.17

Corridor Corridor (Typical Floors) 77 0.00

Sub Total 114 14 15 1136 0.39

ROOF

Phase-1 -Roof

Electrical Room Electrical Room (Roof) 6 2.9 2.9 226 0.08

Telecom Room Floor Technology Room (Typical Floors) 6 2.3 2.3 208 0.06

Lobby Corridor (Typical Floors) 8 2.1 2.1 170 0.06

Lift Lobby Elevator Lobby 17 2.7 2.7 222 0.07

MCC Room MCC Room 15 5.5 5.5 448 0.15

Roof Potable Water Pump Room Pump Room 25 2 2.1 131 0.06

Sub Total 77 18 18 1405 0.47

COOLING LOAD SUMMARY FOR TOWER / APARTMENT AREA

SPACE AREA PER FLOOR (Sq m) TOTAL COIL LOAD PER FLOOR (KW) CHW FLOW RATE PER FLOOR (L/s) TOTAL CHW FLOW (L/s)

BASEMENT-2 111 17 1319 0.45 1 17 1,319 0.45 BASEMENT-1 123 51 4317 1.36 1 51 4,317 1.36 GROUND FLOOR-T3 699 123 10517 2.96 1 123 10,517 2.96 AMENITIES 119 19 1635 0.51 1 19 1,635 0.51 APARTMENT TYPE-1 (1F) 603 41 3241 1.11 1 41 3,241 1.11 APARTMENT TYPE-1 (2F-15F) 604 41 3221 1.10 14 574 45,094 15.40 APARTMENT TYPE-2 (16F-18F) 612 37 2964 1.00 3 112 8,892 2.99 APARTMENT TYPE-3 (19F-25F) 621 38 3059 1.02 7 266 21,413 7.14 APARTMENT TYPE-3-(26F) 621 41 3298 1.10 1 41 3,298 1.10

Phase-1-TYPICAL CORE AREAS (1F-26F) 114 15 1136 0.39 26 377 29,536 10.12

ROOF 77 18 1405 0.47 1 18 1,405 0.47

TOTAL

56

1638.0

130667

43.62

DESIGN AIR FLOW PER

(20)

PROJECT:

The Bridges Phase 1

CALCULATION TITLE:

VENTILATION CALCULATION-TREATED FRESH AIR AND GENERAL EXHAUST

1. ASHRAE Standard 62.1 - 2007 Table 6-1 Minimum Ventilation Rates in Breathing Zone (for fresh air flow rates) 2. ASHRAE Standard 62.1 - 2007 Table 6-4 Minimum Exhaust Rates (for exhaust rates)

FLOORS

Occupancy Based on ASHRAE 62.1 FRESH AIR-ASHARE

SPACE NAME ROOM TYPE Room Pressure NO. OF PEOPLE NO. OF PEOPLE NO. OF PEOPLE

BASEMENT-2

Basement 2

MCC Room B2.06.25 T1

15

3.6

Electric Room

P

0

0

0

0

0

Electrical Room B2.06.18 T1

6

3.6

Electric Room

P

0

0

0

0

0

Lift Lobby B2.00.01 T1

17

3.6

Entrance Lobby

P

10

2

0

2

2.5

Lobby B2.00.02 T1

8

3.6

Entrance Lobby

P

10

1

1

1

2.5

Electrical Room B2.06.20 T2

6

3.6

Electric Room

P

0

0

0

0

0

Lift Lobby B2.00.03 T2

17

3.6

Entrance Lobby

P

10

2

1

2

2.5

Lobby B2.00.04 T2

8

3.6

Entrance Lobby

P

10

1

0

1

2.5

MCC Room B2.06.24 T3

17

3.6

Electric Room

P

0

0

0

0

0

Electrical Room B2.06.21 T3

6

3.6

Electric Room

P

0

0

0

0

0

Lift Lobby B2.00.05 T3

17

3.6

Entrance Lobby

P

10

2

0

2

2.5

Lobby B2.00.06 T3

8

3.6

Entrance Lobby

P

10

1

0

1

2.5

Potable Water Pump Room B2.06.75 T3

42

3.6

Plant Room

P

0

0

0

0

0

Store-T1 -B2-09.01

13

3.6

Store

P

0

0

0

0

0

Store-T2-B2-05.42

13

3.6

Store

P

0

0

0

0

0

Store-T3-B2-09.02

5.2

3.6

Store

P

0

0

0

0

0

Store-T3-B2-06.87

6

3.6

Store

P

0

0

0

0

0

Sub Total

203.2

BASEMENT-1

Basement 1

MCC Room B1.06.26 T1

15

3.8

Electric Room

P

0

0

0

0

0

Electrical Room B1.06.18 T1

6

3.8

Electric Room

P

0

0

0

0

0

Lobby B1.00.01 T1

8

3.8

Entrance Lobby

P

10

1

0

1

2.5

Pump Room B1.06.76 T1

50

3.8

Plant Room

P

0

0

0

0

0

Waste Room B1.06.95 T1

50

3.8

Store

N

0

0

0

0

0

Lift Lobby B1.00.02 T1

17

3.8

Entrance Lobby

P

10

2

0

2

2.5

Occupancy Based on Furniture layout/Report/Clien t input Selected Occupancy AREA (m2) CEILING HEIGHT (m) OCCUPANT DENSITY #/100 m2 PEOPLE OUTDOOR AIR RATE Rp (L/s.person)

(21)

PROJECT:

The Bridges Phase 1

CALCULATION TITLE:

VENTILATION CALCULATION-TREATED FRESH AIR AND GENERAL EXHAUST

1. ASHRAE Standard 62.1 - 2007 Table 6-1 Minimum Ventilation Rates in Breathing Zone (for fresh air flow rates) 2. ASHRAE Standard 62.1 - 2007 Table 6-4 Minimum Exhaust Rates (for exhaust rates)

FLOORS

Occupancy Based on ASHRAE 62.1 FRESH AIR-ASHARE

SPACE NAME ROOM TYPE Room Pressure NO. OF PEOPLE NO. OF PEOPLE NO. OF PEOPLE

Occupancy Based on Furniture layout/Report/Clien t input Selected Occupancy AREA (m2) CEILING HEIGHT (m) OCCUPANT DENSITY #/100 m2 PEOPLE OUTDOOR AIR RATE Rp (L/s.person)

Basement 1

Main Telecom B1.06.82 T1

22

3.8

P

0

0

0

0

0

Server Room B1.07.15 T1

40

3.8

P

0

0

0

0

0

Security Room B1.07.10 T1

22

3.8

P

5

2

0

2

2.5

Store B1.09.02_T1

42

3.8

Store

P

0

0

0

0

0

Store B1.11.03_T1

23

3.8

Store

P

0

0

0

0

0

Store B1.06.86_T2

6

3.8

Store

P

0

0

0

0

0

Electrical Room B1.06.20 T2

6

3.8

Electric Room

P

0

0

0

0

0

Lobby B1.00.03 T2

8

3.8

Entrance Lobby

P

10

1

0

1

2.5

Lift Lobby B1.00.04 T2

17

3.8

Entrance Lobby

P

10

2

0

2

2.5

Pool Plant Room B1.06.72 T2

82

3.8

Plant Room

P

0

0

0

0

0

MCC Room B1.06.23 T2

24

3.8

Electric Room

P

0

0

0

0

0

Main Telecom B1.06.81 T2

17

3.8

P

0

0

0

0

0

MCC Room B1.06.24 T3

17

3.8

Electric Room

P

0

0

0

0

0

Electrical Room B1.06.21 T3

6

3.8

Electric Room

P

0

0

0

0

0

Lobby_ B1.00.05 T3

8

3.8

Entrance Lobby

P

10

1

0

1

2.5

Lift Lobby B1.00.06 T3

17

3.8

Entrance Lobby

P

10

2

0

2

2.5

Store B1.09.02 T3

13

3.8

Store

P

0

0

0

0

0

Store

12

3.8

Store

P

0

0

0

0

0

Store B1.09.01 T3

34

3.8

Store

P

0

0

0

0

0

Main Telecom Room B1.06.80 T3

13

3.8

P

0

0

0

0

0

Irrigation Pump Room B1.06.76 T3

22

3.8

Plant Room

P

0

0

0

0

0

Waste Chute-T1

1.6

3.8

N

0

0

0

0

0

Waste Chute-T2

1.6

3.8

N

0

0

0

0

0

Waste Chute-T3

1.6

3.8

N

0

0

0

0

0

Sub Total

601.3

SECURITY/BMS CONTROL

ROOM

SECURITY/BMS CONTROL

ROOM

SECURITY/BMS CONTROL

ROOM

SECURITY/BMS CONTROL

ROOM

SECURITY/BMS CONTROL

ROOM

(22)

PROJECT:

The Bridges Phase 1

CALCULATION TITLE:

VENTILATION CALCULATION-TREATED FRESH AIR AND GENERAL EXHAUST

1. ASHRAE Standard 62.1 - 2007 Table 6-1 Minimum Ventilation Rates in Breathing Zone (for fresh air flow rates) 2. ASHRAE Standard 62.1 - 2007 Table 6-4 Minimum Exhaust Rates (for exhaust rates)

FLOORS

Occupancy Based on ASHRAE 62.1 FRESH AIR-ASHARE

SPACE NAME ROOM TYPE Room Pressure NO. OF PEOPLE NO. OF PEOPLE NO. OF PEOPLE

Occupancy Based on Furniture layout/Report/Clien t input Selected Occupancy AREA (m2) CEILING HEIGHT (m) OCCUPANT DENSITY #/100 m2 PEOPLE OUTDOOR AIR RATE Rp (L/s.person)

GROUND FLOOR-T1

Ground Floor-T1

Gym T1.GF.03.01

132

5.1

P

7

10

0

10

10

Male Toilet T1.GF.03.15

20

5.1

Toilets

N

0

0

2

2

0

Electrical Room T1.GF.06.18

6

5.1

Electric Room

P

0

0

0

0

0

Telecom Room T1.GF.06.85

6

5.1

Telecom Room

P

0

0

0

0

0

Lobby T1.GF.00.01

8

5.1

Entrance Lobby

P

0

0

1

1

2.5

BOH Corridor T1.GF.06.05

19

5.1

Corridor

P

0

0

1

1

0

StoreGF-T1

31

3.8

Store

P

0

0

0

0

0

Waste Corridor T1.GF.06.90

10

5.1

Corridor

P

0

0

1

1

0

MV Room T1.GF.06.85

40

5.1

Electric Room

P

0

0

0

0

0

LV Room T1.GF.06.58

140

5.1

Electric Room

P

0

0

0

0

0

Lobby T1.GF.00.01

72

5.1

Entrance Lobby

P

10

8

0

8

2.5

Corridor T1.GF.00.05

16

5.1

Corridor

P

0

0

1

1

0

FCC/BMS T1.GF.06.45

22

5.1

FCC Room

P

5

2

0

2

2.5

Emergency LV Room T1.GF.06.28

28

5.1

Electric Room

P

0

0

0

0

0

Lift Lobby T1.GF.00.02

17

5.1

Corridor

P

10

2

0

2

0

Community Manager Office T1.GF.07.01

32

5.1

Office

P

10

4

0

4

2.5

Waste Chute

1.6

5.1

N

0

0

0

0

0

Transformer Room

61

5.1

Electric Room

P

0

0

0

0

0

Generator Room

78

5.1

Electric Room

P

0

0

0

0

0

Gas Room

5

5.1

Plant Room

P

0

0

0

0

0

Sub Total

744.3

0

GROUND FLOOR-T2

Ground Floor-T2

Male Toilet T2.GF.03.15

30

5.1

Toilets

N

0

0

2

2

0

Gym,Sport Arena (play

area)

(23)

PROJECT:

The Bridges Phase 1

CALCULATION TITLE:

VENTILATION CALCULATION-TREATED FRESH AIR AND GENERAL EXHAUST

1. ASHRAE Standard 62.1 - 2007 Table 6-1 Minimum Ventilation Rates in Breathing Zone (for fresh air flow rates) 2. ASHRAE Standard 62.1 - 2007 Table 6-4 Minimum Exhaust Rates (for exhaust rates)

FLOORS

Occupancy Based on ASHRAE 62.1 FRESH AIR-ASHARE

SPACE NAME ROOM TYPE Room Pressure NO. OF PEOPLE NO. OF PEOPLE NO. OF PEOPLE

Occupancy Based on Furniture layout/Report/Clien t input Selected Occupancy AREA (m2) CEILING HEIGHT (m) OCCUPANT DENSITY #/100 m2 PEOPLE OUTDOOR AIR RATE Rp (L/s.person)

Ground Floor-T2

Female Toilet T2.GF.03.10

30

5.1

Toilets

N

0

0

2

2

0

Janitor

5

5.1

Toilets

N

0

0

2

2

0

Electrical Room T2.GF.06.20

6

5.1

Electric Room

P

0

0

0

0

0

Electrical Room T2.GF.06.22

24

5.1

Electric Room

P

0

0

0

0

0

Telecom T2.GF.06.86

6

5.1

Telecom Room

P

0

0

0

0

0

Lobby T2.GF.00.03

8

5.1

Entrance Lobby

P

10

1

0

1

2.5

Community Club T2.GF.03.04

141

5.1

Lobbies/Prefunction

P

30

43

0

43

3.8

Kids Play Area T2.GF.03.07

52

5.1

P

7

4

0

4

10

Kids Toilet T2.GF.03.14

5

5.1

Toilets

N

0

0

2

2

0

ETS ROOM

220

5.1

Plant Room

P

0

0

0

0

0

FCC/BMS T2.GF.06.45

26

5.1

FCC Room

P

5

2

0

2

2.5

Lobby T2.GF.00.01

65

5.1

Entrance Lobby

P

10

7

0

7

2.5

Lift Lobby T2.GF.00.04

17

5.1

Corridor

P

10

2

0

2

0

Electrical Room T2.GF.06.23

32

5.1

Electric Room

0

0

0

0

0

Waste Chute

1.6

5.1

N

0

0

0

0

0

Sub Total

668.2

GROUND FLOOR-T3

Ground Floor-T3

Gym T3.GF.03.01

132

5.1

Gym

P

7

10

0

10

10

Female Toilet T3. GF.03.10

15

5.1

Toilets

N

0

0

2

2

0

Toilet T3.GF.03.19

13

5.1

Toilets

N

0

0

2

2

0

Electrical Room T3.GF.06.21

6

5.1

Electric Room

P

0

0

0

0

0

Telecom Room T3.GF.06.87

6

5.1

Telecom Room

P

0

0

0

0

0

Lobby T3.GF.00.05

8

5.1

Entrance Lobby

P

10

1

1

2.5

Waste Room T3.GF.06.95

104

5.1

Store

N

0

0

0

0

0

Gym,Sport Arena (play

area)

References

Related documents

“No” signifies that the use of private chart data is not accepted as meeting carriage requirements and that if used in ECDIS a full set of official paper charts must be carried

Using a nationwide database of hospital admissions, we established that diverticulitis patients admitted to hospitals that encounter a low volume of diverticulitis cases have

18 th Sunday in Ordinary Time Saint Rose of Lima Parish Parroquia Santa Rosa de Lima.. August

The analysis of the questionnaire data lead to two main outcomes: firstly, understanding how thermal comfort sensation is affected by climatic, personal, psycholog- ical and

This table reports OLS regressions of the log of initial yield spread (logspread) of European prime and non-prime MBS tranches on trustee reputation, deal, collateral and

An associated development was the publication of the textbook, Introductory Indigenous studies in education: The importance of Knowing, (Phillips & Lampert, 2005), with chapters

The research conducted in this thesis investigated fatigue crack initiation and growth in 2024-T3 aluminum alloy specimens at through and corner pits in a central hole exposed to

The total number of individual fish, fish species, fish density (100m 2 ), species richness (>10 individuals), and Simpson’s Index of Diversity for Ushongo Village Reef and