• No results found

Construction of Quality Hot Mix Asphalt Pavements

N/A
N/A
Protected

Academic year: 2021

Share "Construction of Quality Hot Mix Asphalt Pavements"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

(1)

Construction of Quality Hot Mix Asphalt Pavements 

“Best Practices  for 

Pavement Construction” 

59

th

Annual Asphalt Paving Conference Outline

Placement Best Practices Surface Prep

Project planning Understanding  the paver Factors affecting  the screed

Screed Adjustments Paving process

Surface Preparation

Pavement performance is strongly related to  the condition of the surface on which it is 

constructed

Proof Rolling

•Tire pressure – 90% of maximum

•6600 lb. per tire

•Roll full width

•Two complete passes

•Soft, yielding, unstable:

– Remove – Replace with 

approved material 

•Test roll corrected area

(2)

Construction of Quality Hot Mix Asphalt Pavements 

Preparing to Overlay Existing HMA

Or it may involve one or more of the following:

• Patching

• Cleaning and filling cracks

• Placing a leveling course

• Milling the surface

Failed areas MUST be cleaned, repaired  and brought into good structural condition  before overlaying. 

Patching

• Mark at least 1 foot into the  sound pavement 

• Cut with vertical faces

• Remove all loose material

• Tack base and vertical faces

• Patches must be strong  enough to become part of  the permanent structure

Irregular patch ‐ getting proper  compaction is going to be  difficult on this one.

Straight lines, no distress  visible outside the patched  area

Patching

Thoroughly clean the surface

Cleaning the Surface

(3)

Construction of Quality Hot Mix Asphalt Pavements 

Tack Coat

GOOD Even uniform coverage

No puddles No stripes

BAD Uneven coverage Clogged nozzles /  improper orientation Stripes are clearly visible

Wheeled Pavers Maneuverable,  cheaper to maintain

Tracked Pavers Best for soft surfaces 

& better traction

Project Planning

Project Planning

Balance:

Project Tonnage Hot plant output Length of haul  Traffic conditions Number of trucks

Trucking Compaction

Paving Plant

Consistency = Quality

Butt Joint (paver construction)

Butt Joint  (milled or cutback)

Notched Wedge Joint

Project Planning

Types of Longitudinal Joints

(4)

Construction of Quality Hot Mix Asphalt Pavements 

Poor planning – joint in wheelpath

Danny Gierhart photo

First Pass Must Be Straight!

String‐lines

Other reference

Project Planning

Understanding the Paver

Tractor Self‐Leveling Power Unit

Screed can rise & fall

Free Floating

Constant line of pull when set  up properly

Smooth's irregular grade

Understanding the Paver

Augers

Sensors

Slat feeders

Receiving Hopper

Material Feed System

(5)

Construction of Quality Hot Mix Asphalt Pavements 

Visual Inspection of HMA

Blue smoke Stiff (high peak) Slumped

Dry, dull appearance Moisture

Steam

Condensate Segregation Contamination 

Solid

Fuel or solvents Problem Indicators

Loading the Hopper

Avoid  spilling in  front of the paver

Truck applies light  brake pressure

Remove prior to  advancing

Adhere to worker  safety!

Slat Conveyors and Flow Gates

Flow Gates

Slat  Conveyors

The  Hopper

Newer pavers do not have flow gates;

slat conveyors speed controls matl flow

(6)

Construction of Quality Hot Mix Asphalt Pavements 

Conveyor area is exposed and augers are starved!

Hopper Management

Hopper Management Basic Principle Has Not Changed

Understanding the Paver

Keep in good condition Scheduled inspection Maintenance guidelines Safety Guidelines

Lockout/Tag out

Locking Pins

Wheel Chokes

Understanding the Paver

Free‐Floating Screed Position determines mat  thickness

Screed position

Will remain constant 

If all factors remain  constant

(7)

Construction of Quality Hot Mix Asphalt Pavements 

Understanding the Paver

Factors Affecting the Screed Head of material

Paving speed Screed adjustments Mix design Temperatures

Mix

Air 

Grade

Too much material,  screed forced to rise

Correct amount of material, screed remains level 

Too little material, screed will dip down

Factors Affecting Screed

Factors Affecting Screed

Uniform Head of Material

Across Width of Auger

Factors Affecting Screed

Flow Gates Set Properly Material 

Uniform Amount

Shafts  half covered

Feeder Ratio Set Properly

• Same principle as flow

(8)

Construction of Quality Hot Mix Asphalt Pavements 

Factors Affecting Screed

Auger Speed

Auger speed uniform 20‐40 rpm

Too high or too low

Cause mat streaks

Feed Sensors

Controls head of material

Speed of conveyor & auger

Situated at end of auger

Contact or a non‐contact 

Paddle or mercury switch

Infrared or ultrasonic sensors

Factors Affecting Screed

Auger Confinement Tunnels

Controls Material Flow to  end of the Screed

No Auger Extensions  or Confinement

Auger Extensions & 

Confinement

Factors Affecting Screed Understanding the Paver

Factors Affecting the Screed

Head of material

Paving speed

Screed adjustments Mix design Temperatures

Mix

Air 

Grade

(9)

Construction of Quality Hot Mix Asphalt Pavements 

Factors Affecting Screed

Constant Speed Shear factor is constant Depth remains constant

Factors Affecting Screed

Increased Speed Shear force decrease Depth decreases

Factors Affecting Screed

Decreased Speed Shear force increases Depth increases

Depth change varies with speed change

Type of Mix affects shear force

Understanding the Paver

Factors Affecting the Screed

Head of material Paving speed

Screed adjustments

Mix design Temperatures

Mix

Air 

Grade

(10)

Construction of Quality Hot Mix Asphalt Pavements 

Screed Adjustments

Tow Point

Fixed on Tractor Unit Line of pull

Screed pivots Height tow point

Changes Angle of  Attack

Developing the Line of Pull

1 inch change 1/8inch

change

Screed Adjustments

Pivots on both ends of tow arm Angle of Attack

Changing the Angle of Attack

Depth Crank Increases or Decreases Attack Angle

(11)

Construction of Quality Hot Mix Asphalt Pavements 

Screed Adjustments

Starting Angle of Attack Screed nose & grade Nose up attitude Screed in equilibrium Free Floating

Screed Adjustments

Increase Angle of Attack More matl under screed Screed rises to new level

Screed Adjustments

Increased Angle of Attack:

Screed climbs Till forces balance Achieves  equilibrium  Returns to original angle 

Screed Adjustments

Reaction to Angle of Attack Changes

Takes over 5 tow arm lengths – 65% of change

– 35% of change in the last 4 lengths

• Longer tow arm equals a longer distance

– Improves rideability

(12)

Construction of Quality Hot Mix Asphalt Pavements 

Controlling Yield

Depth Check

One check, No correction  Make series of checks Average readings Correct based on average Improves

Smoothness

Yield

Understanding the Paver

Factors Affecting Screed

Head of material

• Paving speed

• Screed adjustments

Mix design

Course vs fine

Temperatures

Mix

Air

Grade

Joint Construction

Good joints

Are no mystery

Training & practice

Attention to details

L/J

Transverse Joints ‐ Starting a Lane

Remove Tapered

area

Pick starting point

Hand placed a starter mat

Previous day’s mat

Full depth of existing

Saw cut & remove

(13)

Construction of Quality Hot Mix Asphalt Pavements 

Transverse Joints

At start‐up All vertical edges

Clean

Tack

Transverse Joints

Null screed

Zero out angle of Attack

Boards allow for  rolldown thickness

Transverse Joints

Introduce angle  of attack

Crank until resistance  is felt

Transverse Joints

Fill auger half full

Conveyor manually

Auger manually

Shovel  if needed

(14)

Construction of Quality Hot Mix Asphalt Pavements 

Transverse Joints Transverse Joints

Paver New

Mat

Old Mat 6 inches

Roll transverse

Roll static

Start on cold side

Move over in 6” ‐ 8” 

until on hot side

Transverse Joints

Rolling Transverse Joint

Checking Transverse Joint

Traffic Safety is always an issue

Vibratory Screed Should Always Be On 

(15)

Construction of Quality Hot Mix Asphalt Pavements 

Contact Grade Sensor

Ultrasonic Grade Sensor

Joint Matchers

Proper Overlap:

1.0 + 0.5 inches

Exception:

Milled or sawed joint  should be 

0.5 inches

Longitudinal Joints

Longitudinal Joints

This lute person is doing a great job

Longitudinal Joints

(16)

Construction of Quality Hot Mix Asphalt Pavements 

Asphalt Paver & Placement

Questions?

References

Related documents

With the cautious remark of little scope of generalizing, the findings conclude that the constant consumption of Korean popular cultural products (mostly pop-music) indeed affects

(Students raise hands and teacher calls on student to respond. He says that he learned the different equations for finding surface area and volume of different a cube,

Development of remaining life prediction algorithms that take into account the different sources of uncertainty while leveraging physics-based degradation models.. that

From Figure 8.5a, it can be seen that the required number of sensor nodes for all algorithms to ensure energy neutral complete target coverage and connectivity increases with

Building on the initial project in Sheffield (Turner et al 2007, 2008), the collaborating organisations sought to implement a stepped approach that linked pre-registration

Hence, care must be taken when comparing the potential impact of silver iodide on the environment as used in cloud seeding programs with the impact of silver or soluble silver in

The aim of this study was to evaluate the effects of early postpartum PGF2α treatment on reproductive performance in dairy cows synchronized with targeted breeding and natural

This research is unique as it examines the impact of operating DGs with fluctuating power sources on the power system voltage stability, in the case where