• No results found

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT

N/A
N/A
Protected

Academic year: 2021

Share "SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

1

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1

FINAL REPORT

Grant Agreement number:

Acronym:

Title:

Type of the action: SME Instrument Phase 1

Date of latest version of Annex I against which the assessment will be made:

Start date of the project:

Duration of the project:

Date of submission:

Version:

Disclaimer

This document is aimed at informing beneficiaries of Horizon 2020 funding. It serves only as an example.

The actual Web forms and templates, provided in project management system available under the Participant

Portal, might differ from this example. The Final Report must be prepared and submitted via the online project

management system under the Participant Portal.

(2)

2

General guidelines

Phase 1 of the SME Instrument aims to provide support to businesses to determine the technological, practical and economic viability of an innovative business idea, together with the resources needed to implement it and the risks involved.

A positive outcome of Phase 1 will result in an innovation project that demonstrates high potential in terms of company competitiveness and growth, underpinned by a strategic business plan.

The final report

1

shall contain:

1. Technical report (1a. Publishable Summary; 1b. Feasibility Study) 2. the answer to a questionnaire on socio-economic implications 3. a financial report including the request for payment of the balance

1. Technical report

1a. Publishable Summary

The technical report shall start with a summary not exceeding 2500 characters with spaces, including description of the action context and objectives, of the work performed and the main results achieved. This summary is publishable, so it shall not contain confidential information or company secrets.

1b. Feasibility Study (Maximum 20 pages to be uploaded as Pdf)

The feasibility study (which will not be published) shall contain two parts:

1. an overview of the work done and the results for the main actions described in the grant agreement (e.g. market study, freedom to operate, technical tests). Try to provide key content in a minimum of words.

2. The conclusion of the action, i.e. an updated status of your business idea that was described in the application. The content of this part differs according to the conclusions you draw :

o if the business idea is abandoned, explain why and clarify your intention for further developments;

o If the project shall continue, please explain how the strategic vision has evolved as a result of the work undertaken:

ƒ detail in particular changes to the objectives, the concept and approach, and the impact (as described in the grant agreement),

ƒ explain what kind of support would be useful to develop your business further (partners, expertise, access to funding, other);

1 In line with Article 20 of the model grant agreement for the SME instrument Phase 1

(3)

3

2. Report on socio-economic implications (answers to questionnaire)

1. Did you benefit from coaching activities? YES NO If yes please rate its usefulness on a scale from 1 to 10 (1=low; 10=high) 2. Will you pursue the project idea? YES NO 2.a. If no, what are the reasons? Please tick the appropriate item from the drop list:

• Insufficient commercial potential

• User/client needs not met

• IPR blockage

• Lack of suitable partners

• Insufficient financing

• Too ambitious for the company

• Not the right time in the development cycle of the company

• Technical feasibility issues

• Other, please specify:

2.b. If yes, what source of finance do you intend to use? Please tick the appropriate item from the drop list:

• SME instrument phase 2

• National/ Regional Programme

• Own resources

• Loan(s)

• Angel funding

• Crowd funding

• Venture capital

• Horizon 2020 or other EU support schemes (e.g. structural funds, COSME), please specify:

• Other, please specify:

(4)

4 2.c. Please fill in the table with your estimated forecasts:

1 Year after project completion

2 Years after project completion

3 Years after project completion

Turnover (in €)

Employment (Headcount)

3. What are the main results of the grant? Please rank the following items on a scale from 1 to 10 (1=no progress; 10 = most progresses) according to the importance of the progresses made:

• Better understanding of clients' needs

• Better knowledge about competitors

• Better understanding of IPR issues

• Better understanding of technical issues

• Better internal work organisation

• Better knowledge about marketing methods

• More strategic approach in change management

• More strategic approach for identifying risks and risk management

• Increased reputation/visibility of the company

• Better relation with local business support organisations

• Other:

(5)

5

3. Financial report (Annex 4 of the Grant Agreement)

Total costs

Reimburse ment rate

%

Maximum EU contribution

**

Maximum grant amount

Form of costs***

Consortium 71 429 70% 50 000 50 000

The information provided is complete, reliable and true.

The costs declared are eligible (i.e. that the action has been properly implemented; see Article 6).

The costs (i.e. the proper implementation of the action) can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 17, 18 and 22).

The beneficiary/beneficiaries hereby confirm(s) that:

*** See Article 5 for forms of costs

** This is the theoretical amount of EU contribution if the reimbursement rate is applied to all the budgeted costs. The theoretical EU contribution for the action is capped by the maximum grant

* See Article 6 for conditions for costs to be eligible

ANNEX 4 FOR SME INSTRUMENT PHASE 1

Eligible* costs (per budget category) EU contribution

A. Costs of the feasibility study/Direct and indirect costs

of the action

FINANCIAL STATEMENT

Lump sum 50 000

References

Related documents

We find that, when using ex-post calibrated bar sizes based on stock and trading characteristics (i.e., trade size, stock trading frequency and stock size), the accuracy advantage

Furthermore, it also concluded that it was unlikely that radiation exposures causing only minor effects on the most exposed individual member of a population would have sig- nificant

In this study, we use documentary film as a way to encourage preservice teachers to critically analyze the public perception of teaching in the United States and engage in

However, if the holders of 30% (7,500,000) or more of the Public Shares vote against adoption of the Acquisition proposal and exercise their redemption rights to exchange their

This prototype includes plugins for URLFetch, Blobstore, Multitenancy and Test Generation, which allow using different methodologies for the testing, including Pair-wise [13]

inter-network functional connectivity (FC) values of the ventral attention (left), and visual (right) networks with the other networks were tested for the high performance group

The Retention Experience Content Requirements Provide information user needs Interaction, Information, and Navigation Design.. Facilitate access that

on Arduino to monitor environmental parameters that intervene in the perception of human comfort such as temperature, humidity, and solar radiation, and use them to