Report run on: January 27, 2005 10:43 AM
RECAPP Facility Evaluation Report
Mecca Glen School B4752A
Ponoka
Wolf Creek School Division #72
B4752A Building Id:
Mecca Glen School Building Name:
Ponoka Location:
R. R. #1 Address:
1,976.91 Gross Area (sq. m):
$3,116,024 Replacement Cost:
0 Construction Year:
Evaluation Date:May 1 2004 John Hull Architect Evaluation Company:
Ms. Sherri Turpin Evaluator Name:
(403) 309-3690 Evaluator Phone:
Original single storey building constructed in 1955 with a partial basement. Modernization in 1991, and extensive modernization and addition in 2002. There is a free-standing portable classroom to the east of the main building. Site has two gravel parking areas and mature landscaping and large playing fields. Site and building are in good condition.
General Summary:
Structural Summary:
Spread footings and crawl space with wood framed floor, walls and roof. New foundations were added for fire walls in 2002.
Structure is in satisfactory condition.
Envelope Summary:
New roofing in 2002. Exterior walls are stucco and brick on wood framing. Batt insulation in stud space with vapour barrier behind interior gypsum board. Envelope appears to be funtioning well with minor deficiencies.
Interior Summary:
Finishes and millwork is new in 2002 and in very good condition. Floors are vinyl sheet goods with some smaller areas of carpet. Walls have rubber base and painted gypsum board. Ceilings are suspended acoustic tile.
Mechanical Summary:
Modernization and addition project of 2002 implemented major upgrades to most of the mechanical systems, including plumbing and HVAC components, including the septic system and disposal field. Overall, the facility is in very good condition, and is functioning well.
Electrical Summary:
In general terms, the electrical system is in good shape, having been upgraded in 2002 addition and modernization project. Some attention is needed in portable classroom, as the light levels are poor and the facility was not addressed in 2002 work. Fire alarm and security systems are up to current standards.
0.39%
5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $12,000
Condition Rating Performance
1 - Critical Unsafe, high risk of injury or critical system failure.
2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.
6 - Excellent As new/state of the art, meets present and foreseeable requirements.
A1010.01 Wall Foundations (Continuous Footing)
A1010.02.01 Spread Footings
A1030.01 Standard Slabs on Grade
A2020.01.01 Cast-in-place Concrete: Basement Wall
B1010.01.01.05 Structural Steel: Columns
B1010.01.02.04 Structural Steel: Beams
B1010.01.02.06 Wood Framing: Beams
B1010.01.04.06 Wood Framing:Joists 5
5
4
4
6
6
4
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
November 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S1 STRUCTURAL
Crawlspace below main floor.
(2002) and original, under point loads from beams supporting floor.
1955 Basement floor Over basement
(2002)
(2002)
over crawl space
B1010.06.01 Cast-in-place Concrete:Exterior Ramp
B1010.07.01 Cast-in-place Concrete:Exterior Stairs
B1020.01.04.06 Wood Framing:Roof Joists
B1020.06 Roof Construction Fireproofing*
6
6
5
6 Rating
Rating
Rating
Rating
0
0
0
0
Installed
Installed
Installed
Installed 0
0
0
25
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated (2002)
(2002) Main entrance
38 x 286 original joists (2002) 302 "I" joists
(2002) 19mm type 'x' gypsum board to u/s of structure
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
B2010.01.06.03 Metal Siding*
B2010.01.08 Portland Cement Plaster: Ext. Wall*
B2010.01.08 Portland Cement Plaster: Ext. Wall*
B2010.01.09 Expansion Control: Exterior Wall Skin*
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
B2010.02.05 Wood Framing*: Ext. Wall Const.
B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*
4
4
5
4
6
4
4
5
6 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 75
75
40
75
75
0
20
100
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S2 ENVELOPE
Gymnasium, some damage due to aging.
(2002) Charcoal 150mm split-face block. Efflorescence on west side to be monitored.
(1993) and (2002) siding and fascia, colour is fading on 1993 panels.
Parging to lower portion of wall at crawlspace.
(2002) standard stucco
38mm x 140mm
(2002) RSI 3.5 Batt Insulation, 6 mil poly vapour barrier
B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09.03 Siding Panels:Soffits
B2020.01.01.02 Aluminum Windows*
B2020.01.01.05 Wood Windows*
B2030.01.02 Steel-Framed Storefronts*
B2030.01.02 Steel-Framed Storefronts*
B2030.01.06 Automatic Entrance Doors*
B3010.01 Deck Vapor Retarder and Insulation*
4
4
5
6
4
6
4
6
6 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 30
30
0
35
20
15
15
15
22
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated Existing envelope, no visible evidence of problems.
pre-finished metal
(2002)
(1993) Metal cladding to windows and window accessories (i.e., latches, hardware, screens, locks, alarms, holders, closers, security devices).
(2002) north entrance. fully double glazed.
(1993) southwest entrance doors: glazed top half. faded paint.
(2002) h/c operator to north entrance, including vestibule.
25mm fibreboard, tapered rigid insulation, and air barrier membrane
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)*
B3010.08.02 Metal Gutters and Downspouts*
B3020.02.01 Roof Hatches 6
6
6 Rating
Rating
Rating
0
0
0
Installed
Installed
Installed 25
30
0
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004 Updated
Updated
Updated (1993) and (2002)
(2002)
(2002)
C1010.01.03 Unit Masonry Assemblies
C1010.01.07 Framed Partitions (Wood Stud)
C1010.05.02 Steel Windows
C1010.07 Interior Partition Firestopping*
C1020.01.07 Wood Doors
C1020.02.02 Steel-Framed Storefronts
C1020.03 Interior Fire Doors*
C1020.04 Interior Sliding and Folding Doors*
C1030.01 Visual Display Boards*
4
4
5
4
5
5
5
5
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
50
25
10
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S3 INTERIOR
2 hour concrete block firewalls dividing the building into 5 sections.
15.9 gypsum board on both sides, typical
(2002)
(2002)
(2002) Clear stained birch, solid core
(2002)
(2002) Hollow Metal
(2002) Horizontal "Dynaflair" perforated metal rolling screen at reception counter
(2002) White boards and tack boards in classrooms
C1030.02 Fabricated Compartments(Toilets/Showers)*
C1030.10 Lockers*
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010.04 Wood Stair Construction
C2020.05 Resilient Stair Finishes*
C2020.08 Stair Railings and Balustrades*
C3010.02 Wall Paneling*
C3010.11 Interior Wall Painting*
6
5
5
5
4
4
4
4
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 20
30
20
20
0
20
50
30
5
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated (2002)
(1991) metal
(2002) Birch-faced plywood
(2002)
(2002) Sheet vinyl.
MDF accent panels in corrdor
(2002) throughout except basement mechanical which is old and faded.
C3010.12.02 Vinyl Wall Covering
C3020.04.06 Cushioned Wood Flooring Assemblies
C3020.07 Resilient Flooring*
C3020.08 Carpet Flooring*
C3020.08.03 Carpet Tile
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
C3030.07 Interior Ceiling Painting*
5
6
6
4
4
4
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
20
10
0
15
10
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated (2002) Select walls in classrooms and library.
(2002) gymnasium
(2002) classrooms, corridors, Tarkett Optima. Rubber base throughout.
(2002) staff room, library and computer labs.
(2002) vestibules
(2002) Lay-in cortega 1220 x 610
(2002) washrooms, storage rooms, vestibules and some corridors
D2010.01 Water Closets*
D2010.02 Urinals*
D2010.03 Lavatories*
D2010.04 Sinks*
D2010.08 Drinking Fountains / Coolers*
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water
D2020.01.03 Piping Specialties (Backflow Preventors)*
D2020.02.02 Plumbing Pumps: Domestic Water*
5
5
5
5
4
5
4
5
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 30
30
30
30
30
40
40
0
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S4 MECHANICAL
(2002) Crane units, tank type vitreous china, floor mounted.
(2002) New Crane wall mounted, vitreous china, flush valve units.
(2002) Stainless steel countertop type c/w Delta faucets and brass.
(2002) Stainless steel units in infirmary, classrooms and labs. Moulded stone mop sink in janitors closet.
(2002) Drinking fountains incorporated into classroom sink brass.
(2002) Upgraded piping and insulation as part of modernizaton project.
(2002) Upgraded systems as part of modernization project.
(2002) Upgraded.
(2002) Upgraded and/or made good as part of modernization project.
D2020.02.04 Domestic Water Conditioning Equipment*
D2020.02.06 Domestic Water Heaters*
D2020.03 Water Supply Insulation*: Domestic
D2030.01 Waste and Vent Piping*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02 Rain Water Drainage Specialties*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.*
4
4
5
4
4
4
5
5
5 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 20
20
0
50
50
0
40
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
(2002) Existing water treatment systems made good, including interior storage tank, chlorinator, iron filter, pressure tanks.
(2002) Nominal 75 gallon Bradford White, gas fired hot water tank.
(2002) Upgraded systems to Code as part of modernization project. Work included a new septic disposal field and tanks.
(2002) Roof drains and RWLs upgraded as part of school addition and modernization project.
Positive drainage of storm RWLs from building on sloping site.
(2002) Made good in modernization upgrade.
(2002) Gas piping made good and modified to suit new components in modernization and addition project.
(2002) Two RBI 8900 series boilers installed.
D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler*
D3020.02.03 Water Treatment: H. W. Boiler*
D3020.03.01 Furnaces*
D3020.03.02 Chimneys (&Comb. Air): Furnace*
D3030.06.02 Refrigerant Condensing Units*
D3040.01.01 Air Handling Units: Air Distribution*
D3040.01.03 Air Cleaning Devices:Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets:Air Distribution*
5
4
5
5
5
5
4
5
5 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 30
30
25
30
25
30
0
50
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
(2002) Exhaust flues and combustion air needs addressed as part of modernization project.
(2002) Modernization project specified 70/30 water to propylene glycol ratio. Chemical feeder and storage tank in place.
(2002) Stand alone gas fired furnaces installed as part of modernizaton and addition project.
(2002) Chimney and combustion air systems adequate for specific furnaces.
(2002) Small rooftop mounted Lennox condensing units, servicing DX coils in computer labs.
(2002) New rooftop mounted air handler installed. Eng-Air LM-13 model, with external ductwork and internal thermal insulation. Mechanical room air handler serving gym area. Hot water coils. Eng-Air LM-6 model.
(2002) Removable media filters associated with new air handlers. Change regularly.
(2002) Upgraded ductwork within modernization project.
(2002) Upgraded diffusers and return grilles.
D3040.03.01 Hot Water Distribution Systems*
D3040.04.01 Fans*: Exhaust
D3040.04.03 Ducts*: Exhaust
D3050.01.01 Computer Room Air Conditioning Units*
D3050.03 Humidifiers*
D3050.05.02 Fan Coil Units*
D3050.05.03 Finned Tube Radiation*
D3050.05.06 Unit Heaters*
D3050.05.08 Radiant Heating (Ceiling & Floor)*
5
4
5
5
5
4
5
5 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
30
0
30
25
30
35
30
35
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
(2002) New circulation pumps added in modernization project.
(2002) Upgraded systems in main school building as part of modernization project.
(2002) Made good or new supplied in modernization work.
(2002) DX coils in fan coil units serving computer rooms.
(2002) Dri-Steam, gas fired steam humidifier added as part of modernization project.
(2002) Added fan coil units for computer labs and library A/C and supplimental heating needs.
(2002) Small quantities of perimeter radiation fin tubes and cabinet units included in modernization project. Majority of the units are located in the gym.
(2002) Hydronic (hot water) fed unit heater in basement mechanical room.
(2002) Ceiling mounted radiant panels added to all classrooms and staff gathering areas.
D3060.02.01 Electric and Electronic Controls*
D3060.02.05 Building Systems Controls(BMCS, EMCS)*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
5
5
5 Rating
Rating
Rating
0
0
0
Installed
Installed
Installed 30
25
30
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004 Updated
Updated
Updated
(2002) Digital electronic sensors installed as part of new BMCS, added in modernization project.
(2002) New Johnson Controls DDC control system installed.
(2002) Portable fire extinguishers in recessed cabinets installed. Reasonable coverage and spacing throughout faciltiy.
D5010.01 Main Electrical Transformers*
D5010.03 Main Electrical Switchboards (Main Distribution)*
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
D5010.07.02 Motor Starters and Accessories*
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories (Lighting Controls)*
D5020.02.02.02 Interior Florescent Fixtures*
D5020.02.03 Emergency Lighting*
4
5
5
5
4
5
5
5 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 40
40
30
0
50
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S5 ELECTRICAL
Padmount transformer, located on north side of property. Underground primary and secondary feeds.
(2002) Existing 600A-208V-3P service and CDP reused and modified for new areas. Surge protection added.
(2002) Two existing panels removed and a total of four new panels added. Adequate capacity and available spare circuits.
(2002) Miscellaneous magnetic and manual motor starters added.
(2002) Upgraded wiring in new areas.
(2002) New toggle switches added in modernization. Motion detector controls in all washrooms, changerooms and storage rooms. Slider type dimmers at stage area for special purpose lights.
(2002) Upgraded fixtures or existing units made good with T8 lamps and electronic ballasts.
(2002) Upgraded emergency lights, battery packs to Code. Existing exit lights replaced with L.E.D. units.
D5020.02.05 Special Purpose Lighting*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.01.05 Other Exterior Fixturess*
D5020.03.02 Lighting Accessories (Lighting Controls)*
D5030.01 Detection and Alarm Fire Alarm*
D5030.02.01 Door Answering*
D5030.02.02 Intrusion Detection*
D5030.02.03 Security Access*
D5030.03 Clock and Program Systems*
5
5
4
5
4
4
5
5
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
25
25
25
25
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated (2002) Stage lighting upgraded as part of modernization.
(2002) New 175W HPS units added at doorways and key areas for security purposes.
(2002) Existing photocell control.
Edwards 6616 zoned panel. Reused as part of 2002 modernization.
(2002) Door call system tied into P/A components.
Existing Caddx Network system, includes door contacts and motion detectors.
Keypads noted at main and mechanical room access doors.
Existing Simplex Master Clock control system in place.
D5030.04 Voice and Data Systems
D5030.04.01 Telephone Systems*
D5030.04.04 Data Systems*
D5030.05 Public Address and Music Systems*
D5030.06 Television Systems*
4
5
5
5
5 Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed 15
15
15
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Primary phone system panel in mechanical room. Sufficient spare capacity and room for expansion if needed.
Nortec Meridian telephone system.
(2002) Upgraded data lines to all computer outlets. Both Cat 5 and Cat 5e cables noted. All secure.
All P/A and/or music functions supplied via phone system. Speakers noted in classrooms, corridors, gymnasuim and related key areas. Good coverage.
Distribution of coaxial cables to each classroom, fed from central control in networking room.
E1090.04.01 Residential Appliances
E1090.07.02 Backstops
E2010.02.05 Educational Facility Casework*
E2010.02.07 Kitchen Casework*
E2010.02.08 Laboratory Casework*
E2010.02.09 Library Casework*
E2010.03.01 Blinds*
E2020 Moveable Furnishings*
4
4
5
5
5
5
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
10
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Staff room has refrigerator, range, microwave, and dishwasher.
(2002) Birch-faced plywood with plastic laminate tops.
(2002) Birch-faced plywood with plastic laminate tops. Staff room.
(2002) Birch-faced plywood with acid resistant laminate tops in science lab and plastic laminate tops in computer labs.
(2002) Birch-faced plywood.
(2002) roller blinds
student desks
F1010.02.04 Portable and Mobile Buildings
2 Rating
0
Installed 0
Design Life
October 2004 Updated
Replace 2 toilets and 2 sinks
Replace furnaces and provide additional exhast.
Replace interior finishes throughout.
Replace light fixtures with new.
Lifecycle Replacement
Indoor Air Quality Upgrade
Lifecycle Replacement
2004
2004
2004
$2,000
$2,500
$10,000
Medium
High
Low Washroom fixtures are poor and leaky.
Existing system does not provide adequate ventilation to meet building code requirements. Furnaces are at end of life cycle.
Interior finishes are in poor condition (floors, walls and ceilings)
Lighting levels and fixture quality are poor.
Concern:
Concern:
Concern:
Concern:
Replace 2 toilets and 2 sinks
Replace furnaces and provide heat recovery ventillators.
Replace interior finishes throughout. Provide new blinds, vinyl sheet flooring, gypsum board (painted) walls, suspended ceiling tiles, and paint to doors. Floor area approximately 50m2.
Replace light fixtures with new.
Recommendation:
Recommendation:
Recommendation:
Recommendation:
Event:
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year Cost
Cost
Cost
Priority
Priority
Priority Updated:
Updated:
Updated:
October 4 2004
October 4 2004
October 4 2004
(1985) Original carpet, battleship vinyl sheet flooring, wood panel wall finishes, suspended tile ceiling, hoizontal mini-blinds, hollow metal doors, in-floor duct, residential forced-air furnace, residential exhaust fans in washrooms.
F2020 Hazardous Components Abatement
4 Rating
0
Installed 0
Design Life
October 2004 Updated
Energy Efficiency Upgrade2004 $5,000 Low
Type Year Cost Priority
Updated: October 4 2004
A small amount of asbestos flooring to be removed in 2004 in gym storage room.
K3020 Indoor Environment
K40 Current Code Issues
K4010.01 Barrier Free Route: Parking to Entrance
K4010.02 Barrier Free Entrances
K4010.03 Barrier Free Interior Circulation
K4010.04 Barrier Free Washrooms 5
3
5
5
4
4 Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Install a closer on the mechanical room door.
Code Upgrade 2004 $500 High Door to mechanical room does not have a closer.
Concern:
Install a closer on the mechanical room door.
Recommendation:
S8 FUNCTIONAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: October 4 2004
Divided into 5 buildings with firewalls. Need a closer on the door to the mechanical room in the basement.
Concrete ramp at main (north door)
h/c operator on exterior door and vestibule door
Everywhere is accessible except stage and lower mechanical room.
(2001) renovated for barrier-free
S4752 Building Id:
Mecca Glen School Building Name:
Ponoka Location:
Address:
0.00 Gross Area (sq. m):
$0 Replacement Cost:
0 Construction Year:
Evaluation Date:May 1 2004 John Hull Architect Evaluation Company:
Ms. Sherri Turpin Evaluator Name:
(403) 309-3690 Evaluator Phone:
Site has two gravel parking areas and mature landscaping and large playing fields. Site and building are in good condition.
General Summary:
Structural Summary:
Envelope Summary:
Interior Summary:
Mechanical Summary:
Electrical Summary:
0%
5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $3,000
Condition Rating Performance
1 - Critical Unsafe, high risk of injury or critical system failure.
2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.
6 - Excellent As new/state of the art, meets present and foreseeable requirements.
G2010.02.01 Aggregate Roadway (Gravel)*
G2020.02.01 Aggregate Parking Lots (Gravel)*
G2030.06.01 Cast-in-place Concrete Steps
G2030.06.01 Cast-in-place Concrete Steps
G2040.03.05 Flexible Pavement
G2040.08 Flagpoles*
4
4
3
5
4
4 Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated Repair concrete steps at West landing.
Failure Replacement 2006 $3,000 Low West landing is crumbling.
Concern:
Repair concrete steps at West landing.
Recommendation:
S7 SITE
Event:
Type Year Cost Priority
Updated: October 1 2004 One access.
Both on the east and west sides of the building
Landings at entrances. West landing is crumbling.
(2000) steps and h/c ramp at north (main) entrance
Asphalt areas at south end of building
Three steel on concrete base.
G2050.04 Lawns and Grasses*
G2050.05 Trees, Plants and Ground Covers*
G3010.01 Water Wells
G3010.02 Site Domestic Water Distribution*
G3020.02.01 Drainage Field
G3020.02.04 Septic Tank
G3060.01.01 Natural Gas Distribution
G4010.02 Electrical Power Distribution Lines*
G4010.04 Car Plugs-ins*
4
4
4
4
4
4
4
4
4 Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed
Installed 0
0
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004
October 2004 Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated Mature trees and shrubs.
Well supply in basement
Connection to the portable classroom.
(2002) old one abandoned. New locations on southeast side of property.
(2002) replaced.
Service from the north. to basement mechanical room. Site distribution on the east side to the portable and the community addition.
Service from the north to transformer. Underground to portable.
panel at capacity, time clock control
G4030.02.01 Communications
4 Rating
0
Installed 0
Design Life
October 2004 Updated Telephone service.