• No results found

Implementation of enterprise resource planning (ERP) and especially SAP in the construction industry: The case of Elliniki Technodomiki SA

N/A
N/A
Protected

Academic year: 2020

Share "Implementation of enterprise resource planning (ERP) and especially SAP in the construction industry: The case of Elliniki Technodomiki SA"

Copied!
97
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Comparison of effort expended during ERP and the traditional
Figure 2. Development of Enterprise SystemsSource: [Kraemmergaard & Moller, 2000, p2]
Figure 15. Linkages between organization hierarchy and control, and
Figure 24. SAP R/3, DPU rating
+7

References

Related documents

Once a control point is selected as downstream objective (the selected point is usually the outlet of the catchment area), the objective function of the system is presented as

Based on this attitude, the LAB were divided into starter LAB (SLAB) and non starter LAB (NSLAB). SLAB were assayed for activities of pro-technological interest:

Figure 5.12 Fabricated Tags (Sensors) (A) Single line embroidered tag with IC attached with epoxy glue on cotton (B) Vertical embroidered tag with IC attached with epoxy glue

CIS 8630 - Business Computer Forensics and Incident Response - 16 Any evidence in the table or view pane will show the precise location as to where that file or character (byte)

Hence a policy of domestic inflation targeting, which achieves a simultaneous stabilization of both domestic prices and the output gap, entails a substantially larger volatility of

2009: Assistant lecturer, Boundary layer dynamics II, University of Helsinki 2006, 2007, 2008: Demonstrator for multiple courses, University of Reading. 2006, 2007 Teaching Assistant

While our algorithm resembles this philosophy, it has the following significant differences: (1) [14] only talks about nearest neighbor and range query on the database, we show how it