• No results found

BIM Assisted Design Process Automation for Pre-Engineered Buildings (PEB)

N/A
N/A
Protected

Academic year: 2020

Share "BIM Assisted Design Process Automation for Pre-Engineered Buildings (PEB)"

Copied!
278
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 2-1 BIM Maturity levels U.K. Adopted from BIS [14]
Table 2-1 Model Progression specifications (AIA).a [13]
Fig. 2-4 Complex PEB Projects in energy generation industry (left inside a complex
Fig. 2-5 Clashes detected at the construction phase of a PEB project in the absence of BIM
+7

References

Related documents

Importantly, it helps a learner to “communicate with the eLearning platform in the language we prefer [7].” Artificial Intelligence makes learning more

In addition, the probability of offering open-heart surgery increased for all three types of hospitals (Figure 2), possibly indicating diffusion of

The sensitivity of other four antibiotics, namely meropenem, fosfomycin, amikacin and combination cefoperazone-sulbactam were still potential for clinical usage to treat ESBL-

This paper explores the use of hyperspectral imagery for agricultural management in drought scenarios with the following two goals: (1) to study the accuracy to which we

Clancy et al.. Improving our understanding of the basis to the rela- tionship between psychosis and epilepsy is important as it may provide clues to the pathophysiology of

Sklik is advertising PPC („pay per click“) system operated by Seznam.cz, which can display text ads in Seznam.cz search, in partner search engines and also text and graphic ads on

Coelho, “Technology Audit performed to the Company Jorge Honório da Silva & Filhos, Lda” (in Portuguese), IPT, Tomar 2006. Coelho, “Technology Audit performed to the Company

10 Using Multiple Regression to Forecast Sales 177 Introducing Multiple Linear Regression 178. Running a Regression with the Data Analysis Add-In 179 Interpreting the