• No results found

Ionospheric measurements during the total solar eclipse of 11 August 1999

N/A
N/A
Protected

Academic year: 2020

Share "Ionospheric measurements during the total solar eclipse of 11 August 1999"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. Path of totality and the maximum obscuration over India during thetotal solar eclipse of 11 August 1999
Fig. 6. Examples of ionograms recorded over Ahmedabad on the eclipseday at 1832 h, 1859 h and 1922 h showing strong blanketing-type Eswith high multiples.
Fig. 9. Field strength recordings of 810 kHz (Rajkot-Ahmedabad) trans-mission during eclipse day (11 August 1999) and control day (12 August1999).
Fig. 10.Daily variations in the signal strength of the riometer recorded over Ahmedabadon eclipse day (11 August 1999) and control days (10, 12August 1999).

References

Related documents

Practical experience with new models of care involving advanced practice nurses and medical practice assistants may also influence the regulation of the scope of practice of

1 Recruitment flyer for the #FutNur Twitter chat (reproduced with the permission of the author - The Florence Nightingale Foundation).. The most prolific tweeter was the

The present report describes a case of a novel human disease with abnormal prion protein sensitive to pro- tease and MV heterozygosity at polymorphic codon 129 Figure 3 3F4 and

Take a left at the traffic light onto Cameron Road, go through the light and the examination site is in the business park on the left, Ste.. Take a right at the traffic light

In the baseline model with no endogenous state variables, the discretionary policy problem reduces to a sequence of static optimization problems in which the central bank

Although the respondents have mixed views on the instrumental and integrative importance of isiZulu; there was general consensus that isiZulu has an important role in a

The flowering period for both King Blue-grass and Finger Panic Grass overlap within the month of January, providing an opportunity to survey both species concurrently (Dysart

When a District elects to initiate and enforce an LCP district-wide for every public works project under the authority of the District, the District establishes what is