Michael Palladino August 13, 2012
PennNet Phone
Box
Next Generation PennNet Infrastructure
Initiatives to support research
Drivers for accelerated rollout
Status
Reduced costs
New features and plans for FY’13
Potential areas to research
Penn’s contract with Verizon expires 11/1/2013 • Analog is no longer a core business; 80% of revenue comes from
wireless.
• Rates will increase
• They may also announce an end-of-life on Centrex service
Octel traditional voice mail support from vendor ends
6/30/2013 (Over 20 years old)
Issues with spare parts for traditional phones and KSUs Analog infrastructure issues with aging copper plant
• Very costly to maintain
• Experience weather-related outages when it rains
Fire alarms
Faxing
Security alarms
Dry pairs and other circuits
ISDN
Elevator and emergency phones
Ideally, we should stop using all existing
building to building copper by the end of
Infrastructure has been rock solid (.9999) 9,775 PennNet Phones installed
Feature development to address your needs
• Larger BLA Groups; up to 8
• Improvements to BLA (no stuck lights)
• Intercom services (better than traditional phone)
Intercom directory
2 digit dialing
Lower costs in FY’13
• Monthly phone prices
Polycom 550 from $4.00 to $3.00
Polycom 650 from $7.00 to $5.00
Polycom 6000 from $15.00 to $12.00
• Multiple line appearance charges discontinued
Penn’s total (admin and student) telephony
charges peaked at $8.9M in FY’08
Projecting charges of $6.9M in FY’13
Additional savings expected in future with
continued PennNet Phone upgrades
combined with intensive audits
The PennNet Phone program will likely save
customers $2.5M annually by FY’15!!
FY’13 projects
• BLA Groups up to 12-15
• Voice mail upgrade
• New Polycom set evaluation, if made necessary by vendor
• Continued focus on administrative services in support of a campus-wide implementation
Accelerated conversions: any issues with
Microsoft Lync service
Softphones (possibly no phone or port needed)
Shared ports
Satellite PennNet Phone Offices (Bryn Mawr)
Network FAX services
SIP Trunking
Wireless handsets
What is it?
Why is it important?
Current status
Next steps
Costs
Demo
A cloud-based file management and file sharing
service
Offers a complimentary set of applications and
tools that facilitate collaboration
Penn data and intellectual property is protected
10 GB default quota per user – increases
available at additional cost
Mobile file access via desktop, iOS devices,
Android and Blackberry
19 applications included with the Internet2 agreement- all under review with
InfoSec, OACP, TSS, & N&T. At least a dozen more apps and the list is growing. All will not be on operational after pilot.
Box for Android Box for Courier Box for Web
Documents LinkedIn Widget Box for Android Tablet Box for iPad Simpleshare Google
Apps Box for Blackberry Box for Office Salesforce Google
Docs Box for Blackberry
Playbook Box for Outlook Netsuite Box for iPhone
Box for Chatter Box for
Dropbox Box (Lite) Penn Box
Desktop synchronization + +
Web access + + +
Mobile device access + + +
PennKey Single Sign On +
Default 10 GB Quota (2 GB) (5 GB) +
Collab Features: Forums,
Comments, Revisions, Locking +
Delegate to local admins (quota,
group folders) +
Contract protections for
Today: 750 + users piloting
Single Sign On support enabled
Self provisioning enabled
• Some manual provisioning possible
• This contract does not include UPHS
Basic documentation completed
Basic support available through ProDesk
ISC Information Security and Penn Privacy Office
provided a statement on Penn Box data
sensitivity and usage
August 15 and 22: Lunchtime Learning sessions
September: online training modules/pilot
feedback
October 1
• Documentation complete
• Full support
• Some 3rd party app inclusion
October 2: production launch (
Almanac
article)
October 3 and beyond
• 3rd party app review process solidified
$115k to vendor + ISC ongoing support costs
• App evaluation
• Documentation, training and support
• Contract administration and vendor liaison
$150-165k range for FY’14 increase to CSF
• Need your financial commitment in September 2012 before production launch
Potential increases to staff time if we over
customize the service or surrounding
processes
Monthly
10 GB
Default -- included
50 GB
$10
100 GB
$20
500 GB
$100
1 TB
$200
Custom use cases
Individuals using more than default quota
ISC’s strategic approach is to plan for infrastructure
convergence that provides secure and reliable
networks that enable support of future technologies
NGP enables delivery of very high levels of IT
infrastructure, system and service reliability while
enhancing capacity
NGP goal has been to provide cutting edge network
connectivity to support Penn’s research, academic
and administrative needs
NGP components
Single-mode fiber to buildings and risers
Building entrance routers
Wiring closet switches
PennNet core routers and switches
Internet/Internet2
Wireless
NGP Timelines
Multi-mode fiber optic infrastructure cannot support network
speeds greater than 1Gbps and has distance limitations for long haul network links
Single-mode fiber provides needs for future network growth
and capacity
As of end
FY’12
, single-mode fiber installed to all buildingsand wiring closets on campus
This fiber upgrade provides for 10gig links to select buildings Permits cross-campus fiber circuits supporting dedicated
10gig
Older routers cannot support 10Gbps Ethernet
effectively
Status of BE upgrades
• 77 of 88 completed
• Expected completion end of September
• Beginning preparation for 10Gbps riser upgrades to closet switches
Next steps
• Addressing 6 locations (HNT, SDH, TRC, BRC, VPL, Quad) that require larger BE routers
• Large BE router evaluation beginning late fall
The existing wiring closet switches are near end of life and do not offer cost effective 10Gbps Ethernet uplinks at scale
New Cisco 3750x stackable switches offer • 10/100/1000mb ports
• Improved fault tolerance
• Small scale 10gig to servers in data centers or computer labs Current Status
• Upgrade schedule has begun
• Targeting small then high bandwidth buildings (ramp up)
• Will include use of SM fiber and 10gig uplinks to stack Next steps
• 1816 wiring closet switches in field to be upgraded over 5 years
• Targeting ~400 devices in FY’13
• 1 Gbps monthly port charge likely $8 in FY’14; $5 in FY’15
The External Routers can support limited 10Gbps Ethernet
however large scale may impact performance and 100Gbps for core interconnectivity is not supported
Current Status
• 2 External Routers in Vagelos and Huntsman NAPs
• 9 Gbps of Internet bandwidth
1-Gig to Cogent soon 10 Gbps (3 Gig rate limited) to 3701 Market
10 Gbps interface (3 Gig rate limited) to Cogent at 401 N Broad
10 Gbps interface (3 Gig rate limited) at 401 N Broad
Will provide flexibility for Internet recovery should we lose connectivity to 401 N Broad
• Continue to monitor Internet BW as more services move to cloud • External Router RFP and requirements will begin in late FY’13
The existing core routers cannot support high density
10Gbps Ethernet to buildings cost effectively
We have limited scalability and continue to monitor need
for 10Gbps Ethernet to campus buildings
Core router RFP and evaluation planned for Fall FY’13
100Gbps is the technology of choice for core
Offers high density 10Gbps Ethernet and 100Gbps capabilities
in the core
Purchase core hardware by Q4 in FY’13
The explosion of client mobile device usage has pushed
limits on AirPennNet in some areas and this trend continues
• Peak AirPennNet device count in FY’12: 40,189 devices
• Most growth in 1 month: 11,838 devices or 42% (April 2012)
• Average growth in 12 months on a per month basis: 10,857 devices or 54%
• Peak data/month: 235.526 TB (April 2012)
• Current device/user peaked at 1.65 devices/user (AirPennNet only) WiFi coverage and density are two complimentary
objectives in our wireless strategy
NOC continues to monitor and increase the ability for
AirPennNet to serve all areas and especially in classrooms and where many users/devices convene
3051 total access points
86 high density classrooms
Located in Wharton, Graduate School of Education, Perelman School of Medicine, Law School, and a few other locations Designed to support from 2 to 2.5 devices per user
IPv6
• After careful traffic analysis disabled IPv6 in July due to a lack of support for IPv6 mobility
Outdoor areas with coverage
• Fry Park
• Perelman Quad
• Blanche Levy Park (College Green)
• Kaskey Park (Bio Pond)
• Portions of Penn Park
• The Quad
• Superblock (near High Rises 39th and Locust Walk)
• Shoemaker Green (new in Summer 2012)
Are there outdoor areas where you think we
NGP Area Fiscal Start Fiscal End
BE Routers FY’12 Purchase
remaining 4900M Completion by Q2 FY’13
Internet Move to 10gig on all
interfaces (3 gig each) Complete by Sept 2012 Closet Switches Begin Upgrades in
FY’13 (~20% of closets)
Reduce total number of switches by end completion by FY’17 Core Routers Evaluation in Fall
FY’13. Purchase new hardware in Winter FY’13 if feasible.
Install Spring FY’13 – Complete cutover interfaces into FY’14 External Routers Evaluation in late
FY’13 Purchase and install in FY’14 MAGPI Routers Evaluate in FY’14 (- Purchase in FY’14
Meeting ultra high speed networking needs
for connections from lab to lab (on campus) or
to off-site campuses or cloud providers.
In-band (over PennNet)
Through Internet over 9 Gig of bandwidth (e.g. AWS)
Internet2 (ION/DYNES)
Out of band (dedicated infrastructure)
SM fiber circuits or LAN extensions
MAGPI Metro Fiber over DWDM links to 401 N Broad
Dedicated Carrier links (dark fiber or Metro Ethernet service)
Future: NDDI 10 Gbps Penn to Internet2 and world wide research networks and facilities
Onsite registration: Sponsored Individual Guest (on a
guest’s device) was enabled on July 12th
Local Penn person assists guest with access
Involved changes to AirPennNet-Guest splash page
Included links to new registration and confirmation pages
http://airpennnet-guest.pennkey.upenn.edu
Registration in Advance: Sponsored Individual Guest
Access Codes and Conference Codes are on track for delivery by mid-late August
Development of web forms for capturing guest information
Development for email verification process
Announcements of full rollout and service introduction
will be made to campus and AirPennNet-SIG
Wireless Strategy for 100% campus coverage (October 2012) Continue to work with schools and centers on wireless projects
including areas for high density wireless installations Aruba controller code testing for IPv6 in Q1 2013
Additional local controller needed to support AP installations Release of new Aruba controllers in November
Wireless Health Reports
• Improvements to the monitoring product from Aruba continue to be slow
• We automated the export of PDF reports through Penn effort
• Working on making reports available via a web interface (future demo and discussion point)
Keeping an eye on current and future wireless technologies
Wireless LAN features to accommodate devices such as Apple TV and Airplay
• 802.11AC (1 Gig Wireless Ethernet) – no standard yet
• Evaluate next generation wireless vendors by end FY’13 and into FY’14 (depends on 802.11AC timing)
Separate issue from DAS
We want full 802.11 campus coverage Campus DAS would be cost prohibitive
• 100% AirPennNet would be fraction of cost of DAS
Off loading from cellular networks Campus RF survey of open spaces
• Develop cost for 100% wireless
• Revise business plan
Contract outside survey help or do in-house Target completion by October NPTF
September 17
October 8
Data center
Enterprise social networking
Security enhancements
• SafeDNS
• Logging
DAS
InCommon certificate program
Cloud initiative update
• Google Apps, Hosted Exchange, AWS