• No results found

Iron Horse Corridor Active Transportation Study

N/A
N/A
Protected

Academic year: 2021

Share "Iron Horse Corridor Active Transportation Study"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

(1)

Iron Horse Corridor

Active Transportation

Study

Alamo Municipal Advisory Council

March 3, 2020

(2)

Agenda

• Project Description • Background • Public Outreach • Study Goals • Potential Improvements  Concept Evaluation  New Technologies

 Operation & Maintenance

• Corridor Management • Next Steps

(3)

Project Description

• Study analyzes opportunities and

constraints for further developing active transportation features

• 22 mile Iron Horse Corridor from

SR-4 to Alameda County Line

• Discusses the potential for

accommodating more efficient, long-distance bicycle travel

• Stakeholder collaboration:

• Corridor Cities (including City of

Dublin)

• Iron Horse Corridor Management

Advisory Committee

• East Bay Regional Park District • Contra Costa Transportation

Authority

• 511 Contra Costa

• Utility companies and local

community and advocacy organizations

(4)

Background

• Gathering public input via internet survey, web-based mapping tool • Various public outreach events

• Completing technical analysis

• Collaboratively developing study goals, improvement concepts and evaluation

criteria Fall 2018 •On-line public engagement •TAC meetings Spring/ Summer 2019 •In-person public engagement events •TAC meetings Fall/Winter 2019/2020 •Concept analysis and evaluation •DRAFT Study

4

(5)

Public Outreach

In-Person Engagement

(Spring/Summer 2019)

 Corridor bike ride

 Pleasant Hill/Contra Costa Centre

BART station food truck event

 Fair Oaks Elementary Bike to School

Day

 San Ramon Bike to Work Day at Bishop

Ranch

 San Ramon Central Park pop-up  Contra Costa Centre pop-up

 East Bay Regional Park District

(“EBRPD”) Trail Etiquette event

Online Engagement

 Webmap tool; open from January to

August 2019

 Over 1,100 unique interactions (i.e. 407

comments and 769 comment likes/votes)

(6)

Study Goals

30% improving mobility,

 Improve network and connectivity to

regional trails, BART, and other transit

 Create priority ROW for trail users;

consider overpasses at high volume

corridors; facilitate direct connections and shorter wait times

29% increasing safety,

 Address intersection safety with improved

signals, increased visibility, and slower traffic

 Improve personal safety at access points;

improve lighting; reduce user conflicts

23% increasing access/equity,

 Improve connectivity to regional downtown

cores, commercial hubs, schools, and open spaces

 Better connections to businesses and

shopping adjacent to the trail

18% improving the user experience.

 Improve shade, amenities, and overall user

experience

 Prioritize maintenance and wayfinding

(7)

Potential Improvements

• TAC and consultant team discussed potential project improvements • 15 design segments; 2 to 3 project segments per jurisdiction

• Data driven corridor analysis documented how the trail:

 Connects to regional networks and adjacent land uses

 Currently serves surrounding communities

• Improve access, the on-trail experience (e.g. user separation), intersections, access

points (existing and new), and connections to existing and planned bikeways and trails

• Implementing a coordinated vision will also improve travel for higher speed cyclists by

providing an efficient route for faster, long-distance travel (i.e. commuting or other utilitarian purposes)

(8)

12 2 3 5 6 8 10 11 13 12 15 14 4 7 9 1 Ã242 Ã4 Ã24 ¥680 ¥680 CONCORD DANVILLE PLEASANT HILL SAN RAMON WALNUT CREEK ALAMO 0 1 2MILES BART Station Park & Ride Segment Extents

Map produced Septemberl 2019.

IRON HORSE TRAIL DESIGN SEGMENTS

CONTRA COSTA COUNTY IRON HORSE TRAIL

Trail Segments by Type

Parks & Housing Segments: Residential, Passive, Landscape, Park Activity Centers: Main Street, Commercial, Destination, Development, Transit 2 3 5 6 8 10 11 13 12 15 14 4 7 9 1 Ã242 Ã4 Ã24 ¥680 ¥680 CONCORD DANVILLE PLEASANT HILL SAN RAMON WALNUT CREEK ALAMO 0 1 2MILES BART Station Park & Ride Segment Extents

Map produced Septemberl 2019.

IRON HORSE TRAIL DESIGN SEGMENTS

CONTRA COSTA COUNTY IRON HORSE TRAIL

Trail Segments by Type

Parks & Housing Segments: Residential, Passive, Landscape, Park Activity Centers: Main Street, Commercial, Destination, Development, Transit Map 2

DRAFT

(9)

Concept

Evaluation

• Project goals used to develop

evaluation criteria

• Community-driven goals were also

included in the evaluation process

• Prioritization based on weighted

criteria

• Weighting based on:

 Qualitative evaluation by TAC

 Level of benefit of improvement

• Corridor Concept Performance

Analysis

•Community Identified Need

Community Desired Project

•Traffic Safety

•Intersection Improvement •Trail User Separation

Safety

•Connections to: HQ Transit, Park & Ride, other trails, existing/planned on-street bikeways, user demand

Mobility

•Jobs, Destinations, Schools, Parks & Open Space, Enhanced Connectivity

Access & Equity

•Amenities, Green Infrastructure

User Experience

•Consistent with planned projects in/around Study Corridor

Project Synergy

(10)

80 Map 15 Alamo 10 11 13 9 12 8

Del Amigo High School Murwood Elementary School Hemme Station Park Rancho Romero Elementary School Rudgear Rd Da nv ille B lvd Dan ville Blvd Livorna Rd Hillgra de Ave M ira nd a A ve S B roa dw ay Sa k lan Indian D r Stone Valley Rd South Ave Wayn e Ave Love Ln S an Migue l D r Hartf ord Rd Del A migo Rd Cervato D r Ramona Way Livorna R d Litina Av e Rdigewo od Rd Las Tram pas Rd Hemm e Ave Cami lle Av e La Se rena A ve Linda Mes a Ave ALAMO Arterial Collector Local Undercrossing Regional Trail KEY MAP Trail Corridor PROJECT TYPE IMPROVEMENTS Intersections Access CONCORD ALAMO WALNUT CREEK SAN RAMON PLEASANT HILL DANVILLE Separated by User Separated by Speed Separated by Experience School/Open Space/Trail Residential/Street Business/ Commercial/Retail Trail Connection On Street Bikeway Connection Existing Trail BART Connection Park and Ride Connection

(11)

81 I RON HOR SE T R A IL A cti ve T ra ns po rta tio n C orr id or S tu dy DR A FT H ow t o A ch ie ve t he V is io n?

8 Segment 8: Danville/I-680 to Stone Valley

Project type Description

Trail Corridor • Separate users by speed with a 22' paved trail with marked shoulders. Intersections • Improve five local crossings at Hilgrade Ave, Cervato Dr,

Ramona Way, Litina Ave, and Ridgewood Rd. • Improve one collector intersection at Livorna Rd.

Access • Add two commercial access points adjacent to Stone Valley commercial areas. • Enhance Alamo/IHT Trailhead at Stone Valley Rd.

• Enhance planting.

9 Segment 9: Stone Valley to South Ave

Project type Description

Trail Corridor • Separate users by speed with a 20' paved trail with marked shoulders. Intersections • Improve two collector intersections at Stone Valley Rd and Las Trampas Rd. Access • Enhance three existing commercial access points.

Connection • Connect trail to Class II at Stone Valley Rd.

10 Segment 10: South Ave through Wayne

Project type Description

Trail Corridor • Separate users by speed with a 20' paved trail with marked shoulders. Intersections • Improve three local crossings at Hemme Ave, Camille Ave, and Wayne Ave.

Access • Enhance existing residential/street access at South Ave, existing open space access at Hemme Station Park, and existing school access at Hemme Ave for Rancho Romero Elementary School.

ALAMO PROJECTS

Alamo includes three segments of the lowest user demand in the study corridor. This is due to lower density of origins and destinations as well as limited low stress on-street bikeway connections. The local activity in Alamo is expected to be largely recreational, however, utilitarian users will pass through Alamo. Improving local intersections so that trail

users would have priority would improve trail convenience. Segment 8 has a large right-of-way with open space. There are opportunities for trail-oriented development and stronger connections to commercial activity in Segment 9. In Segment 10, access could be improved to Rancho Romero School and Hemme Station Park.

(12)

New Technologies/

Emerging Mobility

• Emerging mobility modes

 E-bike and E-scooter share

 Shared autonomous vehicles (“SAVs”) on a

separate facility in Corridor

 First/last mile connection to fixed-route transit

or major destinations

• Potential SAV type infrastructure in limited

areas (mainly Walnut Creek and Danville/San Ramon areas)

• Additional study and extensive public

outreach would be necessary to further develop this concept

(13)

Corridor Management

• Planning-level cost estimates for the concept improvements • Operations and maintenance

• Potential funding sources for:

 capital improvements

 operations, and maintenance

• Governance structure and management strategies

Next Steps

• Final Draft Study January 2020 – March 2020

 Comments due Thursday, March 13

• Final Study for County Board of Supervisors consideration by March/April 2020

(14)

Questions?

Jamar Stamps, AICP, Senior Planner, Contra Costa County

E-mail: jamar.stamps@dcd.cccounty.us

Ph.: (925) 674-7832

Project website: www.cccounty.us/IHCStudy

References

Related documents

compactor are located behind the existing building out of view from the street and there is already a natural wooded buffer to the east and south. Vehicle access to the site is from

The most useful password managers fit seamlessly with companies' existing Identity and Access Management strategies, as well as their existing Identity Providers.. Identity and

The Canadian Contribution to the Training Mission in Afghanistan (CCTM-A) saw CF personnel serving as mentors working with high-ranking Afghan military personnel and

This analysis uses the Medical Expenditure Panel Survey to exam- ine the use and cost of health care among low-income nonelderly adults who are covered by Medicaid relative to their

Comprehensive  integrated  IT  solutions  for  tax  administrations  comprise  the  same  capabilities.    A  core  tax  system  supports  the  core 

As for the correlation with numerical variables, a relation was found with age, years of education, duration of dialysis treatment, hours of dialysis, residual dialysis, number

There should be certain control variables related to researchers’ characteristics (RCH). Unfortunately, we do not have many variables in the dataset. The only variable we can use