• No results found

CoQ Testing Example in C#

N/A
N/A
Protected

Academic year: 2021

Share "CoQ Testing Example in C#"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

1 L3/5/6 design 02.01.12 30.03.12 2 mechanics 02.01.12 14.02.14 3 endmounts 02.01.12 27.12.12 4 design 02.01.12 29.06.12 5 prototype 01.06.12 30.07.12 6 improvements 31.07.12 28.09.12 7 production 01.10.12 27.12.12 8 ribs + 60% spares 01.02.12 30.10.12

9 prototype (made by INTA) 01.03.12 29.06.12

10 prototype (made by

Hephy)

01.02.12 30.03.12

11 test & redesign 01.06.12 30.07.12

12 production 01.08.12 30.10.12 13 CF cones 02.01.12 27.09.13 14 design 02.01.12 30.03.12 15 dummy 02.04.12 30.07.12 L3/5/6 design CS;MF;IG mechanics endmounts design DS;IG prototype RS;IG improvements DS;RS;IG production IG ribs + 60% spares

prototype (made by INTA) IG;INTA prototype (made by Hephy)

AF;RS;IG

test & redesign IG production IG;INTA CF cones design DS;IG dummy DS;RS;IG 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 0

(2)

16 mould 01.01.13 28.06.13

17 production 01.07.13 27.09.13

18 MoU w. IFCA, Santander 02.01.12 28.02.12

19 endrings (incl. clamp) 02.01.12 28.06.13

20 design 02.01.12 29.03.12 21 improvement 30.03.12 30.10.12 22 mechanical samples 01.02.12 30.01.13 23 production 01.02.13 28.06.13 24 mechanical mockup 01.06.12 30.01.13 25 cooling services 01.02.12 13.08.13 26 R&D + design 01.02.12 31.08.12 27 prototype 01.05.12 31.01.13 28 production 15.03.13 13.08.13

29 cooling pipe & APV contact 02.04.12 28.06.13 30 R&D + design 02.04.12 30.11.12 mould IG;INTA production IG;INTA MoU w. IFCA, Santander

MF;IG

endrings (incl. clamp)

design DS;IG improvement RS;IG mechanical samples DS;IG production IG;INTA mechanical mockup KEK cooling services R&D + design AF;IG prototype AF;IG production AF;IG cooling pipe & APV contact

R&D + design AF;IG

(3)

31 prototype 02.07.12 28.12.12 32 production 01.03.13 28.06.13 33 Support Shell 01.02.12 14.02.14 34 design 02.07.12 28.06.13 35 prototype 01.02.13 31.08.13 36 production 30.09.13 14.02.14

37 dry air volume 01.02.12 31.05.13

38 end flange 01.02.12 28.09.12 39 design 01.02.12 27.04.12 40 prototype 01.03.12 31.05.12 41 protduction 29.06.12 28.09.12 42 front-end 01.12.11 30.05.14 43 Origami CE 01.12.11 26.04.13 44 design 01.12.11 13.01.12 45 prototypes 16.01.12 30.03.12 prototype AF;IG production AF;IG Support Shell design KEK prototype KEK production KEK dry air volume

KEK end flange design KEK prototype KEK KEK front-end Origami CE design CI;SS;MF prototypes TT 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 0

(4)

46 electrical test 02.04.12 03.08.12 47 production 02.01.13 26.04.13 48 Origami -z 01.12.11 26.04.13 49 design 01.12.11 13.01.12 50 prototypes 16.01.12 30.03.12 51 electrical test 02.04.12 29.06.12 52 production 02.01.13 26.04.13 53 Origami +z 02.04.12 26.04.13 54 design 02.04.12 15.05.12 55 prototypes 16.05.12 31.07.12 56 electrical test 01.08.12 30.10.12 57 production 02.01.13 26.04.13

58 PA0, PA1, PA2 (single layer) 02.01.12 26.03.13

59 design 02.01.12 13.01.12 60 prototypes 16.01.12 30.03.12 electrical test CI;MF production Origami -z design CI;SS;MF prototypes TT electrical test CI;MF production Origami +z design CI;SS;MF prototypes TT electrical test CI;MF production

PA0, PA1, PA2 (single layer)

design CI;SS;MF

prototypes TT

(5)

61 bond tests 02.04.12 29.06.12

62 production 02.01.13 26.03.13

63 PE1, PE2 (single layer) 02.07.12 26.03.13

64 design 02.07.12 31.07.12 65 prototypes 01.08.12 16.10.12 66 bond tests 17.10.12 13.11.12 67 production 02.01.13 26.03.13 68 PB1, PB2 (single layer) 02.07.12 26.03.13 69 design 02.07.12 27.07.12 70 prototypes 30.07.12 12.10.12 71 bond tests 15.10.12 09.11.12 72 production 02.01.13 26.03.13 73 edge hybrid L4-6 02.07.12 23.04.13 74 design 02.07.12 31.07.12 75 prototypes 01.08.12 16.10.12 bond tests CI production

PE1, PE2 (single layer)

design CI;SS;MF prototypes TT bond tests CI production PB1, PB2 (single layer) design CI;SS;MF prototypes TT bond tests CI production edge hybrid L4-6 design CI;SS;MF prototypes CI;MF;SS 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 0

(6)

76 electrical tests 17.10.12 13.11.12 77 production 02.01.13 23.04.13 78 PL31, PL32 for layer 3 01.08.12 05.04.13 79 design 01.08.12 31.08.12 80 prototypes 03.09.12 16.11.12 81 bond tests 19.11.12 14.12.12 82 production 14.01.13 05.04.13 83 hybrid L3 01.08.12 31.05.13 84 design 01.08.12 28.09.12 85 prototypes 08.10.12 30.11.12 86 electrical tests 03.12.12 11.01.13 87 production 11.02.13 31.05.13 88 ladder assembly 02.01.12 30.05.14

89 ladder assebmly jigs 02.01.12 02.04.13

96 prototype ladder assembly 14.11.12 02.04.13 electrical tests CI production PL31, PL32 for layer 3 design CI;SS;MF prototypes TT bond tests CI production hybrid L3 design CI;SS;MF prototypes CI;MF;SS electrical tests CI production ladder assembly

ladder assebmly jigs

prototype ladder assembly

(7)

97 prototype ladder 14.11.12 05.02.13

98 ladder test (lab) 09.01.13 02.04.13

99 ladder production 03.06.13 30.05.14

100 back-end 31.03.11 31.12.14

101 readout system HW 01.02.12 28.09.12

102 NECO, FADC prototype 02.07.12 28.09.12

103 NECO, FADC design 01.02.12 29.06.12

104 firmware 02.07.12 31.12.14

105 firmware NECO (basics) 02.07.12 29.10.12

106 firmware FADC (basics) 30.07.12 26.11.12

107 final firmware FADC & NECO 01.01.13 31.12.14 108 readout software 31.03.11 31.12.12 109 test TuxDAQ 02.02.12 27.04.12 110 online SW / DAQ (testsytem) 31.03.11 29.02.12 111 online analysis 01.03.12 28.06.12 prototype ladder CI

ladder test (lab) CI

ladder production

back-end

readout system HW

NECO, FADC prototype JP;CI;MF NECO, FADC design

CI;SS;MF

firmware

firmware NECO (basics) HS;MF;CI firmware FADC (basics)

HS;MF;CI

final firmware FADC & NECO HS;MF;CI;? readout software

test TuxDAQ MF;CI;TO online SW / DAQ (testsytem)

CI;TO

online analysis TS;CI

(8)

112 test TuxOA 01.06.12 27.08.12

113 adaption of DAQ to new hard- and firmware

02.10.12 31.12.12

114 readout system test 10.12.12 30.04.13

115 testing of DAQ/OA with new HW

10.12.12 28.02.13

116 testing of full DAQ chain, incl. Copper-Finesse

06.02.13 30.04.13

117 2nd iteration RO system 01.03.13 28.06.13

118 redesign NECO, FADC 01.03.13 29.03.13

119 NECO, FADC prototype 01.04.13 31.05.13

120 test 2nd iteration HW 03.06.13 28.06.13

121 final readout system 01.07.13 28.03.14

122 production 01.07.13 31.12.13 123 test 02.09.13 28.03.14 124 sensors 01.08.11 28.05.14 125 barrel DSSD L4-6 (HPK) 02.01.12 25.10.13 126 production 02.01.12 27.09.13 test TuxOA MF;CI;TO

adaption of DAQ to new hard- and firmware CI;MF

readout system test

testing of DAQ/OA with new HW CI;MF

testing of full DAQ chain, incl. Copper-Finesse CI;MF

2nd iteration RO system

redesign NECO, FADC

NECO, FADC prototype

test 2nd iteration HW

final readout system

production test sensors barrel DSSD L4-6 (HPK) production HPK;TT 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 0

(9)

127 delivery of final sensors 26.03.12 25.10.13 128 tests 26.03.12 23.01.13 129 irraditation 04.06.12 31.07.12 130 trapezoidal DSSD (Micron) 01.08.11 28.05.14 131 design 01.08.11 12.09.11 132 design submission 13.09.11 13.09.11 133 prototypes order 14.09.11 28.10.11 134 prototypes production 05.12.11 27.04.12 135 prototypes delivery 30.04.12 29.05.12 136 irraditation 04.06.12 31.07.12 137 tests 30.05.12 28.05.14 138 preparartion of order 01.02.12 31.07.12 139 submit order 31.08.12 31.08.12 140 production 03.09.12 31.01.14

141 delivery of final sensors 18.02.13 28.03.14

delivery of final sensors TT;HPK tests ? irraditation TB;MV trapezoidal DSSD (Micron) design MV;TB design submission 13.09. prototypes order TB prototypes production M;TB prototypes delivery M irraditation TB;MV tests preparartion of order TB submit order 31.08. production M;TB

delivery of final sensors M;TB

(10)

142 barrel DSSD L3 (HPK) 02.04.12 29.03.13

143 specification 02.04.12 30.05.12

144 production 28.06.12 29.03.13

145 production & QA database 01.03.12 28.12.12

barrel DSSD L3 (HPK)

specification TB;TT;MF

production TT;HPK production & QA database

TB;?

References

Related documents

hydrogen. The Archaeoglobus however was found in relatively small proportion at both.. a) Fraction of barcoded pyrosequencing 16S rRNA gene reads for the Thermococcales,

Previous research suggests that women (including mothers) with depressive symptoms believe time management, childcare, knowledge of health benefits of physical activity,

Similarly, for each site, comparing the mean push out bond strength between the groups (Table 4), the push out bond strength at Coronal, Middle and Apical of Gutta Percha group

In terms of the dwelling, thermal comfort/ventilation, natural light, noise mitigation were important; shared space, good neighbour protocols, and support for

Because moisture is being extracted from the airstream as it moves from the entering to the leaving side of the evaporator, successive rows in this coil have increased fin density

Justice Health is developing a pilot transitional health service for Aboriginal and Torres Strait Islander prisoners to support continuity of their health care on release and

To obtain the natural frequency of the cantilever beam and the damped frequency, and accelerometer is used.. The accelerometer will help obtain the experimental results of

Kelompok perlakuan yang diberi aspirin menunjukkan adanya perbedaan yang bermakna terhadap kelompok perlakuan perasan rimpang jahe merah dosis II dan III, hal ini berarti