Procurement criteria

for low-carbon

building

Matti Kuittinen

Simon le Roux

(2)
(3)

Procurement criteria for low-carbon building

Matti Kuittinen and Simon le Roux

Energy Materials Innovations Costs Suitability

(4)
(5)

le Roux, Simon

Title of publication Procurement criteria for low-carbon building Series and publication

number Environment Guide 2017

Register number YM1/601/2017 Subject Built environment

ISBN PDF 978-952-11-4788-3 ISSN (PDF) 1796-167X

Website address

(URN) http://urn.fi/URN:ISBN:978-952-11-4788-3

Pages 50 Language English

Keywords public procurement, building, low carbon, carbon footprint, lifecycle assessment, energy efficiency, material efficiency, innovations, standards

Abstract

This guide presents recommendations for Green Public Procurement (GPP) criteria to be applied on a voluntary basis in order to reduce the carbon footprint of building projects implemented by means of public funds under the Act on Public Procurement and Concession Contracts. Particular focus is placed on lifecycle thinking, which should be applied starting from the planning stage of buildings with calculations of the building lifecycle carbon footprint.

Besides the suitability requirements for tenderers and cost estimates, the criteria include the assessment of energy, material and innovation aspects. Specific criteria relating to these categories have been drawn up for the procurement of design services, procurement of materials and equipment, procurement of building works, Design & Build projects and Design, Build & Operate contracts. The criteria are supplemented by detailed instructions based on standards which enable the environmental assessors involved in the projects to make comparable calculations.

(6)

le Roux, Simon

Julkaisun nimi Vähähiilisen rakentamisen hankintakriteerit Julkaisusarjan nimi

ja numero Ympäristöopas 2017

Diaari/hankenumero YM1/601/2017 Teema Rakennettu ympäristö

ISBN PDF 978-952-11-4788-3 ISSN PDF 1796-167X

URN-osoite http://urn.fi/URN:ISBN:978-952-11-4788-3

Sivumäärä 50 Kieli englanti

Asiasanat Julkiset hankinnat, rakentaminen, vähähiilisyys, hiilijalanjälki, elinkaariarviointi, energiatehokkuus, materiaalitehokkuus, innovaatiot, standardit.

Tiivistelmä

Tässä oppaassa esitetään vapaaehtoiset kriteerisuositukset, joiden avulla julkisin varoin toteuttavien ja hankintalain alaisten rakennushankkeiden hiilijalanjälkeä voidaan pienentää. Erityinen painopiste on elinkaariajattelussa. Sitä suositellaan toteutettavaksi rakennusten suunnitteluvaiheesta alkaen elinkaaren hiilijalanjäljen laskennan kautta.

Kriteerit sisältävät soveltuvuusvaatimusten ja kustannusten arvioinnin lisäksi energian, materiaalien ja innovaatioiden arvioinnin. Näihin teemoihin liittyvät kriteerit on laadittu erikseen suunnittelupalveluiden hankintaan, materiaalien ja laitteiden hankintaan, rakennusurakoiden hankintaan, kokonaisvastuurakentami-seen ja elinkaarimallille. Kriteereitä täydentävät standardeihin pohjautuvat yksityiskohtaiset ohjeet, joiden avulla hankkeissa mukana olevat ympäristöarvioinnin ammattilaiset voivat tehdä vertailukelpoisia laskelmia.

Kustantaja Ympäristöministeriö

Julkaisun jakaja/myynti

Sähköinen versio: julkaisut.valtioneuvosto.fi Julkaisumyynti: julkaisutilaukset.valtioneuvosto.fi

(7)

le Roux, Simon

Publikationens titel Upphandlingskriterier för koldioxidsnålt byggande Publikationsseriens

namn och nummer Miljöhandledning 2017

Diarie-/

projektnummer YM1/601/2017 Tema Byggd miljö

ISBN PDF 978-952-11-4788-3 ISSN PDF 1796-167X

URN-adress http://urn.fi/URN:ISBN:978-952-11-4788-3

Sidantal 50 Språk engelska

Nyckelord Offentliga upphandlingar, byggande, koldioxidsnål, koldioxidavtryck,

livscykelanalys, energieffektivitet, materialeffektivitet, innovationer, standarder. Referat

I denna handledning presenteras frivilliga kriterierekommendationer med hjälp av vilka koldioxidavtrycket kan minskas för byggnadsprojekt som lyder under upphandlingslagen och som genomförs med offentliga medel. Tyngdpunkten ligger särskilt på livscykeltänkande. Det rekommenderas att detta tillämpas redan när byggnaderna planeras genom en uträkning av koldioxidavtrycket för hela livscykeln.

Kriterierna innehåller förutom lämplighetskrav och en kostnadsutvärdering även en utvärdering i fråga om energi, material och innovationer. I anslutning till dessa teman har det utarbetats separata kriterier för upphandlingen av planeringstjänster, upphandlingen av material och anordningar, upphandlingen av byggnadsentreprenader, byggprojekt där byggentreprenören ansvarar för alla byggskeden och

livscykelmodellen. Kriterierna kompletteras med standarder som grundar sig på detaljerade anvisningar, med hjälp av vilka de yrkesutbildade personer som gör miljöbedömningar inom projektet kan utföra jämförbara uträkningar.

(8)
(9)

PART I Background and use of the criteria

... 10

1 Why is low-carbon building important?

... 11

2 Background

... 14

2.1 Objectives of the guide... 14

2.2 General objectives concerning construction ... 15

2.3 Interfaces with other guides and recommendations ... 15

2.4 Effectiveness, feedback and further development ... 16

3 Criteria for low-carbon building

... 17

3.1 Recommendations for criteria ... 17

3.2 Suitability requirements for low-carbon building ... 20

3.2.1 Suitability requirements for procurement of design services ... 20

3.2.2 Suitability requirements for procurement of building contracts ... 20

3.2.3 Suitability requirements for procurement of materials and equipment ... 20

3.3 Low-carbon criteria for energy ... 21

3.3.1 Energy efficiency in procurement of design services ... 21

3.3.2 Energy efficiency in procurement of building contracts ... 21

3.3.3 Energy efficiency in procurement of materials and equipment ... 22

3.4 Low-carbon criteria for materials ... 23

3.4.1 Assessment of materials in the design phase ... 23

3.4.2 Materials in the contract phase ... 23

3.4.3 Material procurements ... 24

3.5 Low-carbon innovations as selection criteria ... 24

3.6 Costs ... 25

4 Use of criteria

... 26

4.1 Carbon footprint in the different phases of a procurement ... 26

4.2 Selecting the most economically advantageous tender from the perspective of low-carbon building ... 28

(10)

Criteria 2b. Low-carbon renovation contracts ... 33

Criteria 3. Material and equipment procurements for low-carbon new buildings and renovations ... 34

Criteria 4a. Design & Build contracts in low-carbon new building and renovation projects ... 35

Criteria 4b. Design, Build & Operate model in low-carbon building ... 36

PART III Instructions for applying the criteria

... 37

5 Instructions

... 38

5.1 Carbon footprint calculation ... 38

5.2 Life cycle costs... 40

5.3 Measuring a site’s electricity, fuel and district heat consumption and emission calculations ... 41

5.3.1 Electricity ... 41

5.3.2 District heating and cooling... 41

5.3.3 Fuels ... 42

5.4 Assessing the proportion of recycled or renewable materials ... 42

5.5 Assessing innovativeness ... 43

5.6 Correspondence of the criteria to the European Commission’s Green Public Procurement criteria for buildings ... 44

5.7 Most common environmental management certification systems relevant to the criteria ... 45

CONCEPTS AND ABBREVIATIONS

... 46

SOURCES

References ... 48

Acts and decrees ... 49

(11)

Set

targets for

the carbon

footprint

Functional and

technical requirements Low-carbon

targets

+

Survey market solutions and their cost optimisation

Select

subject of

procurement

and allocate

the targets to them

Prepare calls for tender and

compare

tenders

In the preparation phase of the procurement, assess the building’s environmental impacts over its life cycle.

Consider a preliminary assessment of life cycle costs with budgeting.

?

life cycle

environmental

impacts

Identify

the building project’s

1

2

3

Specify: Procurement procedure

• Description of procurement

• Suitability requirements

• Minimum requirements

• Selection criteria

• Method to compare tenders Design services Material and equipment procurements Building contracts

4

Include the targets and assessment methodsin the contract notice. A reference to a low carbon footprint may be included in the title of

the contract, making the procuring entity’s objective clear to tenderers. One can refer to criteria recommendations in this guide and attach them to the call for tender.

Include low-carbon

targets in

the contract

5

Consider using suitable incentives or

penalties. Monitor target implementation during the contract period.

(12)

PART I

BACKGROUND

AND USE OF

THE CRITERIA

(13)

1 Why is low-carbon building important?

Buildings and building construction have significant environmental impacts. They are responsible for about one third of Finland’s greenhouse gas emissions and some 40% of energy consumption. Traditionally, efforts to reduce emissions from construction have been made by improving energy efficiency. A decrease in greenhouse gas emissions from energy production also helps to reduce the emissions related to buildings.

The operational emissions of a building decline as energy performances improve and emissions per unit of energy produced decrease. As operational emissions resulting from buildings are reduced, the impacts of the other life cycle phases on the carbon footprint of buildings are emphasised. Many different materials can be used to construct an energy efficient building, but there are differences between the life cycle emissions of different materials in relation to the technical and functional performance achieved with them. International interventions for mitigating climate change generate more business for low-carbon products and services. It is vital for Finnish designers and builders to obtain experience and domestic market references to improve their competitiveness in international low-carbon building projects.

While construction is associated with many environmental impacts, the carbon footprint is an important factor in directing the built environment towards a path of sustainable development. Climate change mitigation is a key international goal. In the future, other environmental impact categories or social sustainability indicators may be included in our national procurement criteria, following the example of the European Commission’s Green Public Building recommendations (1) and core indicators for resource efficiency in building (2). Finland’s national Energy and Climate Strategy 2016 set the objective of reducing

the carbon footprint of construction and construction products (3). A government resolution from 2013 recommends taking the carbon footprint of building materials into

(14)

consideration in public building (4). The Ministry of the Environment has launched a drafting process aiming to incorporate the carbon footprint of construction in legislation in an effective manner at the latest by mid-2020s. The procurement criteria for low-carbon public building anticipate this development.

0 % 10 % 20 % 30 % 40 % 50 % 60 % 70 % 80 % 90 % 100 %

Larsson et al. 2016 Boverket 2016 Atmaca & Atmaca 2015 Ruuska & Häkkinen 2014 Liljenström et al. 2014 Crawford & Stephan 2013 Dokka et al. 2013 Säynäjoki et al. 2012 Engin & Francis 2010

Carbon footprint of energy supply Carbon footprint of other life cycle phases

Figure 1. Distribution of a building’s life cycle emissions according to international studies. In addition to emissions related to energy supply, a building’s life cycle carbon footprint consists of the manufacturing and transport of construction products, construction, renovation and demolition. Studies show that in addition to emissions relating to energy supply, the emissions from other life cycle phases may be significant.

(15)

STUDIES ON LIFE C YCLE EMISSIONS FROM CONSTRUC TION:

Engin & Francis (2010). ”Zero carbon isn´t really zero: Why embodied carbon in materials can´t be ignored?” Available at www.di.net/articles/archive/zero-carbon Sturgis & Roberts (2010). Redefining Zero. RICS Research Report, May 2010. Säynäjoki, Heinonen & Junnila (2012). "A scenario analysis of the life cycle greenhouse gas emissions of a new residential area". Environmental Research Letters 7 (3). Crawford & Stephan (2013). ”The

Significance of Embodied Energy in Certified Passive Houses”. International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering. 7 (6): 427–433. Dokka ym. (2013). A zero emission concept analysis of a single family house. Report No 5, SINTEF Academic Press.

Ibn-Mohammed et al. (2013). “Operational vs. embodied emissions in buildings – A review of current trends”. Energy and Buildings 66: 232–245.

Ruuska & Häkkinen (2014). ”The significance of various factors for GHG emissions of buildings”. International Journal of Sustainable Engineering, 2014.

Liljenström et al. (2014). Byggproduktionens miljöpåverkan i förhållande till driften. Livscykelberäkning av klimatpåverkan och energianvändning av ett nyproducerat flerbostadshus i betong med lågenergiprofil. IVL Rapport C32.

Pöyry et al. (2015). ”Embodied and construction phase greenhouse gas emissions of a low-energy residential building”. Procedia Economics and Finance 21: 355–365.

Lützkendorf ym. (2015). “Net-zero buildings: incorporating embodied impacts.” Building Research & Information 43 (1).

Atmaca & Atmaca (2015). ”Life cycle energy and carbon dioxide emissions assessment of two residential buildings in Gaziantep, Turkey”. Energy and Buildings, 102: 417–431. Boverket (2016). Miljö- och klimatanpassade byggregler. Förstudie. Rapport 2016:14. Larsson et al. (2016). Byggandets klimatpåverkan. Livscykelberäkning av klimatpåverkan för ett nyproducerat energieffektivt flerbostadshus med massiv stomme av trä. Sveriges Byggindustrier 2016.

(16)

2 Background

2.1 Objectives of the guide

This guide contains recommendations for procurement criteria that will help to reduce the carbon footprint of new building or renovation projects carried out with public funds. The criteria are largely based on European Commission’s recommendations on green public building, and they thus help Finnish actors improve their competence relevant to public design and building procurements in European Union Member States. The updated Act on Public Procurement makes it possible to consider environmental impacts when assessing the economic advantageousness of a procurement. These criteria are recommendations that are not binding to contracting entities or designers. The contracting entity

should evaluate on a case-by-case basis which criteria are to be applied to individual procurements.

A low carbon footprint means reducing the greenhouse gas emissions produced over the entire life cycle of a building. There are several greenhouse gases that contribute to global warming. As it would not be practical to refer to the specific volumes of different greenhouse gases produced over the building’s life cycle separately, the global warming impacts of the different gases are converted into CO2 equivalent amounts that correspond to the effects of carbon dioxide (CO2e).

This guide places particular emphasis on the carbon footprint of construction, as reducing the risk of climate change has rapidly emerged as a central theme in international politics, research and product development.

Efforts to reduce the carbon footprint may be made by improving energy efficiency, selecting low-carbon forms of energy or choosing building materials with as low a carbon footprint as possible that meet their technical and functional requirements. In addition, land use, durability of construction, the building’s service life and its need for maintenance and repairs affect its life cycle carbon footprint.

(17)

European and international standards are available for assessing the carbon footprint, including EN 15978 for calculating a building’s environmental impacts and EN 15804 for preparing environmental declarations for construction products.

2.2 General objectives concerning construction

Construction is directed by many different requirements and objectives. In addition to statutory requirements, they include the contracting entity’s functional and technical requirements. Sustainable development objectives may be set from ecological, social and economic viewpoints. While the criteria contained in this guide focus on one impact category of ecological sustainability (climate change), the contracting entity must always set quality requirements that are the most important for the project as a whole.

The importance of the criteria for low carbon footprint in relation to other building requirements and objectives should be assessed case-by-case. The emphasis on a low carbon footprint does not exclude the general or customer-specific requirements of construction. Contracting entities should strive for a low carbon footprint in addition to sustainable and healthy construction, not at their cost, and in compliance with building regulations.

2.3 Interfaces with other guides and recommendations

Both Finnish and European guides have been prepared on green public building procurement. The other key guides relevant to this theme are:

Ministry of the Environment’s guide Green public building – Procurement guide (2017)

European Commission recommendations on procurement criteria of public office buildings (2016)

European Commission’s Buying green! A handbook on green public procurement (3rd. edition, 2016)

European Commission Level(s) recommendations on core indicators of resource efficiency in building (2017)

RT card 13-11268 Suunnittelu- ja konsultointipalveluiden julkinen hankinta (Public procurement of design and consultancy services. 2017)

(18)

2.4 Effectiveness, feedback and further development

The effectiveness of the criteria presented in this guide on the carbon footprint of construction will be monitored. The Ministry of the Environment will also collect

feedback on the use of the criteria and any needs to improve them. Based on evaluations of effectiveness and feedback, the criteria will be developed in cooperation with the stakeholders.

Please send your feedback to: hankintaopas@ym.fi

NOTE:

The contracting entity always has the responsibility to exercise case-by-case discretion when it comes to the use of selected procurement criteria, also regarding the use of the voluntary criteria presented in this guide. These recommendations are intended to support the objective expressed in the updated Act on Public Procurement to enhance the efficient use of public funds while promoting high quality innovative and sustainable procurement.

When using these recommendations for low carbon footprint procurement criteria, it is up to the contracting entity to ensure that the principles to be complied with in public procurement under the relevant legislation are not compromised in individual cases.

(19)

3 Criteria for low-carbon building

This chapter provides a concise introduction to the recommendations for criteria and their backgrounds. See Part II for detailed procurement criteria.

3.1 Recommendations for criteria

The criteria for low-carbon building pertain to energy, materials and innovation. In addition, tenderer suitability and costs are assessed. The criteria are applied to different subjects of procurement, ensuring that the carbon footprint of the building produced as a result of the different procurements is cost-optimised as far as possible.

Procurement

criteria for

a low-carbon

public

building

Energy Materials Innovations Costs Suitability

(20)

The criteria are mainly based on the criteria for green public building recommended by the European Commission (6). All Commission recommendations can also be applied to Finnish building procurements. However, the criteria selected for this guide form a simplified and easy-to-follow route to the incremental reduction of the negative environmental impacts of public construction.

The procurement criteria are listed separately for different subjects of procurement. These subjects are design services, building construction contracts, material and equipment procurements as well as integrated Design & Build projects (when design, building work and materials are purchased as a single procurement) and the Design, Build & Operate model (when procurement contains the building as well as its maintenance for a specified period) also known as a Life cycle contract.

Firstly, criteria related to energy or materials are set for the procurement of design services. Other criteria for a low carbon footprint are then applied to the procurement of the building works and materials when the construction contract goes to tender. The criteria for the various procurement phases add up to a low-carbon end result as shown in Figure 3. More resources are usually available for procurements that exceed the EU threshold value than for national procurements. This is why the use of criteria is highly recommended for these projects in particular.

This guide recommends the use of certain criteria as minimum requirements for a procurement, and others as comparison criteria. Depending on the procurement, the criteria may also be applied in other ways. The minimum requirements refer to the minimum requirements associated with the description of the procurement referred to in Chapter 9 of the Act on Public Procurement. Selection criteria refer to the grounds for comparing the economic advantageousness of the price-quality ratio described in section 93 of the Act on Public Procurement.

The criteria are always chosen to fit the subject of the procurement. Consequently, the contracting entity should engage in dialogue with the market in the planning phase of the procurement and identify the criteria that will achieve the highest impact on the building’s carbon footprint in each situation.

(21)

Energy Materials Innovation Low-carbon public building Design services

Calculate the carbon footprint of energy consumption Better than regulatory energy Energy audits of renovation sites • • • Design solutions that reduce carbon footprint • Material and equipment procurements Select appliances from the best energy Long warranty period • • Innovative products, equipment and services that promote low-carbon goals • At least 10% of the materials are renewable or recycled Long warranty period • •

Monitoring and guidance of energy use

Maintain low-carbon operations by means of property maintenance Apply low-carbon procurement criteria to building repairs

• • • Building contracts Energy training on the construction site Measure on-site energy consumption Air permeability testing and thermal imaging • • • Innovative operational practices that promote low-carbon goal •

Report on the use of renewable and recycled materials Carry out pre-demolition audits at renovation sites before the demolition work • •

Calculate the carbon footprint of

materials

At least 10% of the materials are renew-able or recycled Pre-demolition audit at renovation sites • • •

(22)

3.2 Suitability requirements for low-carbon building

3.2.1 Suitability requirements for procurement of design services

The suitability criteria ensure that actors who participate in the tendering process have good capabilities to produce high quality results. When using suitability criteria, the contracting entity should take into account the preconditions for assessing suitability relevant to different procurement forms referred to in Chapter 5 of the Act on Public Procurement.

In the design phase, it is recommended that the suitability requirements target the designers’ references. As low-carbon construction is a relatively new standpoint on design, however, it is not sensible to require that the design team has extensive experience or multiple references, for example of calculating a building’s carbon footprint. On the other hand, there should be sufficient competency in the design team related to energy efficiency and carbon footprint calculation and expertise in low-carbon building materials and construction methods. This ensures that the minimum requirements set for design are achievable.

3.2.2 Suitability requirements for procurement of building contracts

The recommended suitability requirements for companies offering building contracts are their references of acting as the main contractor and project leader in energy-efficient building projects. In addition, at least in procurements of building contracts that exceed the EU threshold value, it is recommended that the tenderer has a third-party certified environmental management system in use.1

3.2.3 Suitability requirements for procurement of materials and equipment

The setting of suitability requirements for tenderers is not recommended in the procurement of materials and equipment. Instead, it is recommended to use minimum requirements set for the products and equipment to be procured. These requirements directly and effectively target the subject of the procurement, rather than targeting a wholesaler who does not have a direct impact on the environmental friendliness of the product they sell.

(23)

3.3 Low-carbon criteria for energy

3.3.1 Energy efficiency in procurement of design services

The recommended criteria related to energy strive to reduce energy use over the building's life cycle to below the minimum statutory level.

When procuring design services, it is recommended that energy-related criteria are targeted at the minimum requirements contained in the description of the procurement which each tender must fulfil. Low-carbon new buildings should be designed to have at least 10% better energy performance than the regulatory level (Ministry of the Environment Decree on the Energy Performance of New Buildings)2.

In renovation projects, the building should be designed to have 20% better energy performance than the regulatory level (Ministry of the Environment Decree on Improving the Energy Performance in Renovations and Alterations). In individual renovation cases, the contracting entity may choose to direct this energy performance target to bear on the parts of the building to be renovated, on the net energy use of the building, or on the overall energy use of the building weighted by energy carrier factors (E-value). In addition to these, the

performance target applies to improving the energy efficiency of the technical systems of the renovated building.

In the design phase, it should be noted that under the amended Energy Efficiency Act (1338/2016), central government authorities are only allowed to procure products in the best possible energy efficiency class (7). This should be taken into account for example in the design of building services.

An energy audit should be part of the design in renovation projects, unless such an audit has already been carried out when preparing the procurement. The energy audit provides necessary information for the design work, for example on the building's energy consumption and structural energy performance. The reporting instructions prepared by Motiva (8), for example, can be followed when conducting an energy audit.

3.3.2 Energy efficiency in procurement of building contracts

The designed energy performance is realized in the building contract phase. Therefore minimum requirements and selection criteria for contracts are recommended that provide

Low-carbon new buildings

should be designed to have 10%

better energy performance than

the regulatory level

In renovation projects, the building

should be designed to have

20% better energy performance

(24)

the means to achieve the designed energy performance as far as possible. An energy simulation model can be updated with the actual solutions and measured values to verify if the building reaches the designed energy performance. The contracting entity may include incentives or penalties that support the achievement of these objectives in the contract.

The minimum requirement is that on-site energy consumption is measured, and that based on this measured consumption the CO2e emissions from energy consumption are calculated and reported. No threshold values are proposed for site energy consumption. However, the aim is to improve energy efficient building practices by measuring and reporting.

In addition, the organisation of energy efficiency training for the staff on building sites is recommended. For example, this training may be carried out using the materials developed in the European BUILD UP Skills project (9). Training can help to improve the professional skills needed to implement nearly zero-energy buildings and thus promote good quality in the construction of the building.

The minimum requirements of a low-carbon public building project include air

permeability measurement and thermal imaging. They help to verify that the targets for construction quality factors have been achieved. The incentives and penalties to be used and any corrective actions that may be indicated by the measurements must be defined in the contract negotiations.

3.3.3 Energy efficiency in procurement of materials and equipment

In purchases of equipment related to energy efficiency, it is recommended that

equipment is selected from the two best energy rating classes. However, under the Energy Efficiency Act, any equipment procured by central government authorities must always be from the highest energy efficiency class.

Certain building service equipment have energy labels, including lamps and luminaires and some ventilation units or air conditioners. Many household appliances have energy labels, such as fridges, ovens and hobs, washing machines and cooker hoods. The choice of household appliances can be influenced in public housing construction projects. If there is no energy label available for the appliances in question, the contracting entity should make use of the energy efficiency reference values set in the implementing regulation of the Ecodesign Directive, and select an energy efficient option as referred to in section 29 b of the amended Energy Efficiency Act.

On-site energy consumption

is measured, and emissions

from energy consumption

are calculated

(25)

3.4 Low-carbon criteria for materials

3.4.1 Assessment of materials in the design phase

The influence of material choices on a building’s carbon footprint can be effectively steered in the design phase. For this reason, it is recommended to include the calculations of building materials’ life cycle carbon footprints in the design services. Based on these calculations, the most cost-optimal way of reducing the carbon footprint of building materials can be identified in the design phase. For a more detailed description of the calculation methods, see Chapter 5.

In addition to an energy audit, it is recommended that a pre-demolition audit is included in the design of renovation projects. A pre-demolition audit is a procedure taken before initiating demolition work, in order to identify possibilities to reuse building components or recycle their materials.

It is recommended that products containing renewable or recycled materials should be used in the design of a low-carbon building. The proportion of these materials out of the total weight of all building and site filling materials should be a minimum of 10%3. For

more detailed instructions for assessing this amount, see Chapter 5.

By using renewable (e.g. wood) and recycled materials (e.g. recycled steel, concrete, glass, bitumen or recycled soil materials), the use of raw materials that cause a greater environmental impact can be avoided, and a transition towards circular economy in the construction sector can be supported. However, it must be ascertained in the design phase that the minimum volume of renewable and recycled materials can be realised cost-effectively and meet functional and technical requirements. Calculations should also be produced to ensure that the use of renewable and recycled materials supports the building's energy performance and reduces its life cycle carbon footprint.

3.4.2 Materials in the contract phase

In the contract phase, it is essential to construct the building with products that meet the objectives set for the materials and structures in the design phase as far as possible.

3 According to the European Commission’s green public building recommendations (10, p. 81), 10% of recycled

Design services should

include a calculation of

building materials’ life cycle

(26)

If the contract includes procuring building materials, it is recommended that minimum requirements applicable to material procurements are applied to the contract.

To achieve the minimum volumes of renewable and recycled materials shown in the building design, the total weight of renewable and recycled building materials in proportion to the total weight of other building materials must be reported in the contract phase.

Renovation contracts often include demolition work. It is recommended that a pre-demolition audit should be carried out. The materials to be demolished should be

reported following the List of Waste (11) to facilitate their recycling and further processing.

3.4.3 Material procurements

When procuring materials and construction products, it should be ensured that the minimum quantities of renewable and recycled materials set in the design phase are realised. It is recommended that the proportion of recycled and renewable raw materials should be at least 10% of the weight of all materials used in the building project, calculated according to the instructions given in Chapter 5. When procuring products, their responsible sourcing, end of the life cycle disposal and recyclability should be taken into consideration. The materials should be easy to demount and reuse.

3.5 Low-carbon innovations as selection criteria

Criteria for innovation provide incentives to make completely new proposals to reduce the carbon footprint of the built environment. At the same time, product development in the design and construction sectors is encouraged. Innovations are possible in all phases of the procurement. Typical features of procurements aiming for innovation are performance-based criteria, proactive dialogue with the market, procurement procedures that recognize innovative solutions, and new contract model types.

The use of comparison criteria to promote low-carbon innovations in procurements will not directly guarantee that innovations will be available. However, the criteria are a good way of comparing the carbon footprint results produced by innovative solutions. Making comparisons between the tendered innovations has been facilitated by accurately defining the method used to prove an innovation's impacts on the carbon footprint (see Chapter 5).

The proportion of recycled

and renewable raw materials

should be at least 10% of the

weight of all materials used in

(27)

Innovations may include multi-objective building optimisation in the design phase (12)

carried out to assess low-carbon building solutions, the application of a weighted form factor in the architectural massing, or the use of renewable fuel in site machinery. For example, a low carbon footprint can be achieved by selecting low-carbon materials or energy, but just as well by designing a building where materials can be saved, or which has a good structural energy performance.

The impacts of innovations can be assessed following the instructions in Chapter 5. The call for tenders should specify how the selection criteria will be weighted in proportion to the tender price.

3.6 Costs

In addition to the procurement price, the building’s life cycle costs or price-quality ratio can be taken into account in procurements.

When examining the costs, particular attention should be focused on the building’s life cycle costs, which include repairs, adaptability and service needs while operational. These costs can be assessed over the building’s full service life. In addition, the life cycle costs associated with equipment related to energy efficiency can be assessed, for example.

(28)

4 Use of criteria

For a more detailed description of how different criteria are applied in different phases of the procurement, see the Ministry of the Environment’s guide ‘Green Public Building –Procurement Guide’ (2017). This Chapter sums up the recommendations relevant to reducing the carbon footprint of buildings.

4.1 Carbon footprint in the different phases of a procurement

Low-carbon building criteria can be used in different phases of a green public building project as shown in Figure 4: in the needs analysis carried out when preparing the procurement, as suitability requirements for the procurement, in descriptions of

procurement, in the selection of the most economically advantageous tender, as contract terms, and during the commissioning phase.

The planning phase of the procurement is vital for the outcome. The environmental objectives of the project are crystallised in the description of the procurement, in comparison criteria for economic advantageousness and in tenderer suitability

requirements. This is why sufficient time should be allowed for this procurement phase, and appropriate expertise should be called on.

The procurement procedure selected in the planning phase affects the use of criteria. Some of the potential procurement procedures are rarely used in construction, such as online auctions or dynamic purchasing systems. The typical choices are an open or a closed procedure, negotiated procedures or competitions. When aiming for new and innovative solutions, a design competition is often an effective method.

The criteria in this guide have been selected ensuring that they can mainly be verified on the basis of European standards. Additionally, many of them are relevant to the criteria for voluntary environmental certification systems commonly used in the construction sector. See section 5.7 of this guide for more information on the relationship between the criteria for low-carbon building and these typical environmental certificate criteria.

(29)

Sufficient dialogue with the market is important in low-carbon building. This makes it possible to survey a range of technical solutions suitable for the procurement and select an appropriate level of required performance before the call for tenders is published. It is vital that the criteria have an effective influence on environmental impacts. However, it is equally important that the criteria and the level of difficulty they involve are proportionate to the subject of the procurement.

1. Procurement strategies 2. Planning the procurement 3. Procurement phase 4. Contract 5. Commissioning 6. Operational measures Objectives

Energy, materials, environment Innovation

Other contracting objectives

• • •

Needs analysis

Performance levels for energy and materials Occupancy analysis

• •

environmental impacts

What aspects can the EIA report results • • Description of the procurement Low-carbon goals • • Minimum requirements Energy Materials • • Suitability requirements Environmental management systems References and expertise

• • Market survey Low-carbon solutions Competency Cost levels • • • Comparison of tenders Suitability, exclusion Minimum requirements

Scoring system for price and quality Market dialogue

• • • •

Carbon footprint during the contract period

Contract clauses Incentives and penalties

• •

Inspections

Verifying the carbon footprint target level

Low-carbon operation

Monitoring the actual carbon footprint

Impacts of maintenance and service on carbon footprint

• •

(30)

4.2 Selecting the most economically advantageous tender

from the perspective of low-carbon building

The contracting entity should select the most economically advantageous tender. Under the Act on Public Procurement, this may be the tender at the lowest price, at the most affordable cost, or with the best price-quality ratio for the contracting entity. The decision on the method of establishing economic advantageousness is made by the contracting entity. If the lowest price or most affordable cost is selected as the criterion for economic advantageousness, the use of procurement criteria for low-carbon building will be restricted to the suitability requirements and the description of the procurement. In these cases, however, environmental targets can efficiently be included in the description of the procurement and minimum requirements.

If the tender with the best price-quality ratio is selected, the tenders can be compared in a versatile manner, applying selection criteria for low-carbon building. In this case, the contracting entity should specify the weightings of the selection criteria and the method used for comparing tenders. See Figure 5 for alternative ways of assessing economic advantageousness and applying the criteria for low-carbon construction in the assessment.

Procurement criteria for

low-carbon building Suitability Energy Materials Innovations Costs Most economically advantageous tender Price Qualitative comparison criteria Tender price Costs Lowest price Lowest costs Best price-quality ratio a) b) c) Minimum requirement s

for procurement of the procurement contract Special terms and conditions

Tenderer or candidate selectio

n

Ensuring the ability to produce good quality

(31)

PART II

RECOMMENDED CRITERIA

PROCUREMENT CRITERIA FOR DESIGN SERVICES

1a. Designing a low-carbon new building

1b. Designing low-carbon renovations

PROCUREMENT CRITERIA FOR BUILDING CONTRACTS

2a. Low-carbon new building contract

2b. Low-carbon renovation contracts

PROCUREMENT CRITERIA FOR MATERIALS AND EQUIPMENT

3. Material and equipment procurements for low-carbon

new buildings and renovations

PROCUREMENT CRITERIA FOR OTHER CONTRACT AND

IMPLEMENTATION FORMS

4a. Design & Build contracts in low-carbon new building and

renovation projects

(32)

Criteria 1a. Designing a low-carbon new building

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• The tenderer should have the number of references required by the contracting entity relating to designing energy efficient and low-carbon buildings.

• The design team should have expertise in energy efficient design and carbon footprint calculation.

• Verification: The tenderer’s list of references over the period specified by the contracting entity, taking into account the principles of proportionality and non-discrimination.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy

• The building is designed to have an energy performance at minimum 10% better than the regulatory level (Ministry of the Environment Decree on the Energy Performance of a New Building).

• The equipment for the building is selected in the two highest energy efficiency classes or, in procurements by central government authorities, the best energy efficiency class.

• The design work includes a calculation of emissions from energy consumption while operational as part of the building’s life cycle carbon footprint.

Materials

• The structures and site fillings are designed ensuring that at minimum 10% of their weight is made up from low-carbon recycled or renewable materials, assessed following the instructions given in Chapter 5.

• The design work includes carbon footprint calculations for massing alternatives and main structure types as well as combining this data with the carbon footprint from energy consumption. The factors of the carbon footprint are reported to the contracting entity to facilitate the selection of a cost-optimised alternative.

• The calculations are produced in compliance with standard EN 15978 over the entire life cycle following the instructions in Chapter 5.

SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Innovations and

additional points

• The tenderer may propose innovative design methods that can minimise and cost-optimise the building’s carbon footprint. The lower carbon footprint achieved through innovation is assessed following the calculation instructions given in Chapter 5. • Additional points are awarded if the designer updates the life cycle carbon footprint

calculation to correspond with the actual figures realized at handover.

Other quality factors required by the contracting entity Tender price

(33)

Criteria 1b. Designing low-carbon renovations

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• The tenderer should have the number of references required by the contracting entity relating to improving the building’s energy performance or reducing its carbon footprint through renovation projects.

• The design team should have expertise in energy efficient design and carbon footprint calculation.

• Verification: The tenderer’s list of references over the period specified by the contracting entity, taking into account the principles of proportionality and non-discrimination. MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy

• In a renovation project, the building is designed to have an energy performance at minimum 20% better than the regulatory level (Ministry of the Environment Decree on Improving a Building’s Energy Performance in Renovations and Alterations).

• The equipment for the building is selected in the two highest energy efficiency classes or, in procurements by central government authorities, the best energy efficiency class. • The design work includes a calculation of emissions from operational energy

consumption after renovations as part of the building’s life cycle carbon footprint. • The design work includes an energy audit carried out before the renovations, if this

audit has not been conducted when preparing the procurement. The audit includes an air permeability measurement of the building to be renovated in compliance with standard EN ISO 9972 and thermal imaging in compliance with standard EN 13187

Materials

• The design work includes a pre-demolition audit of parts to be demolished, in which components that can be reused and recycled are reported, and the volume of wastes to be generated is assessed based on the List of Waste categories (Government Decree on Wastes 179/2012, Annex 4).

• New structures and site fillings are designed ensuring that at minimum 10% of their weight is made up from low-carbon recycled or renewable materials, assessed following the instructions given in Chapter 5.

• The design work includes carbon footprint calculations for massing alternatives and the main structure types of new components as well as combining this data with the carbon footprint from energy consumption. The components of the carbon footprint are report-ed to the contracting entity to facilitate the selection of a cost-optimisreport-ed alternative. • The calculations are produced in compliance with standard EN 15978 over the entire life

cycle following the instructions in Chapter 5.

SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Innovations and

• The tenderer may propose innovative design methods that can minimise and cost-optimise the building’s carbon footprint. The lower carbon footprint achieved through innovation is assessed following the calculation instructions given in Chapter 5.

(34)

Criteria 2a. Low-carbon new building contracts

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• In a procurement exceeding the EU threshold value, a company submitting a tender should have a certified environmental management system.

• The tenderer should have the number of references required by the contracting entity relating to the building of energy efficient and low-carbon buildings.

• Verification: The tenderer’s list of references over the period specified by the contracting entity, taking into account the principles of proportionality and non-discrimination.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy

• Electricity and district heat consumption on site and, in procurements exceeding the EU threshold value, fuel consumption of machinery and equipment on site are measured and their carbon footprint is reported following the instructions given in Chapter 5.

• Training related to energy efficiency is organised on site, for example using the BUILD UP Skills material or similar.

• Before handover, the building’s air permeability is measured in compliance with standard EN ISO 9972, and thermal imaging is carried out in compliance with standard EN 13187. Incentives, penalties and any corrective measures needed are specified by the contracting entity.

• In procurements of energy-consuming equipment, the procurement criteria for low-carbon construction products and equipment are complied with (criteria 3).

Materials

• In procurements of building materials and products, the procurement criteria for low-carbon construction products and equipment are complied with (criteria 3).

• The total quantities of renewable or recycled materials indicated in the designs are included in the material procurements. Once the building has been completed, the actual volumes of recycled or renewable materials are reported.

SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Innovations and

additional points

• The tenderer may propose innovative implementation methods that reduce the life cycle carbon footprint of the site or the building. Additional points are awarded for reducing the carbon footprint in proportion to the reference level following the instructions in Chapter 5.

• Additional points may be awarded for a higher percentage of recycled or renewable materials than the rate indicated in the plans, if this helps to reduce the building’s carbon footprint.

Other quality factors required by the contracting entity Tender price

(35)

Criteria 2b. Low-carbon renovation contracts

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• In a procurement exceeding the EU threshold value, a company submitting a tender should have a certified environmental management system.

• The tenderer should have the number of references required by the contracting entity relating to improving the building’s energy performance in renovation projects. • Verification: The tenderer’s list of references over the period specified by the

contracting entity, taking into account the principles of proportionality and non-discrimination.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy

• The electricity and district heat consumption on site and, in procurements exceeding the EU threshold value, fuel consumption of machinery and equipment on site are measured and their carbon footprint is reported following the instructions given in Chapter 5.

• Training related to energy efficiency is organised on site, for example using the BUILD UP Skills material or similar.

• Before handover, air permeability of parts of the building affected by the renovation are measured in compliance with standard EN ISO 9972, and a thermal imaging is carried out in compliance with standard EN 13187. Incentives, penalties and any corrective measures needed are specified by the contracting entity.

• In procurements of energy-consuming equipment, the procurement criteria for low-carbon construction products and equipment are complied with (criteria 3).

Materials

• In procurements of building materials and products, the procurement criteria for low-carbon construction products and equipment are complied with (criteria 3).

• The total quantities of recycled or renewable materials indicated in the designs are included in the material procurements. Once the renovations have been completed, the actual quantities of recycled and renewable materials are reported.

• Before demolition, a pre-demolition audit is conducted, in which the possibilities of recycling or reusing the materials to be demolished are identified. A report on the pre-demolition is produced.

• The weight of the parts of the building to be demolished will be estimated and reported in a waste movement document following the classification in the waste list (Government decree on wastes 179/2012, Annex 4).

SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Innovations and

additional

• The tenderer may propose innovative implementation methods that reduce the life cycle carbon footprint of the site or the building. Additional points are awarded for reducing the carbon footprint in proportion to the reference level following the instructions in Chapter 5.

(36)

Criteria 3. Material and equipment procurements for low-carbon new buildings and

renovations

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability • The application of suitability requirements to procurements of materials and

equipment is not recommended.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy

• The appliances to be procured are to be selected in the two highest energy label classes.

• In all procurements by the central government authorities, equipment related to energy efficiency must be selected from the highest energy efficiency class. • If a product does not have an energy efficiency class, the reference values of its

energy efficiency must comply with the European Commission’s product-specific regulation applicable to ecodesign (see the Act amending the Energy Efficiency Act 1338/2016, section 29b).

Materials

• The total quantities of renewable or recycled materials indicated in the designs are included in the material procurements. Once the building has been completed, the actual quantities of recycled or renewable materials are reported.

• At minimum 10% of the total weight of all building and filling materials of the procurement is made up of recycled or renewable materials, assessed following the instructions given in Chapter 5.

• Verification is based on the contract-phase bill of quantities.

SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Energy and materials

• Warranty period: Additional points are awarded in proportion to the length of the warranty period.

• Additional points may be awarded for a larger percentage of renewable or recycled materials than the rate shown in the designs.

Innovations

• The tenderer may propose innovative solutions that reduce the life cycle carbon footprint of the building, equipment or materials. Additional points are awarded for reducing the carbon footprint relative to the reference level following the instructions in Chapter 5.

Other quality factors required by the contracting entity Tender price

(37)

Criteria 4a. Design & Build contracts in low-carbon new building and renovation projects

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• In a procurement exceeding the EU threshold value, a company submitting a tender should have a certified environmental management system.

• The tenderer should have the number of references required by the contracting entity relating to the building of energy efficient and low-carbon buildings.

• The suitability requirements for design services are applied to these services (criteria 1a or 1b).

• Verification: The tenderer’s list of references over the period specified by the contracting entity, taking into account the principles of proportionality and non-discrimination.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy Materials

• Minimum requirements for design services (criteria 1a or 1b). • Minimum requirements for building contracts (criteria 2a or 2b). • Minimum requirements for building materials and products (criteria 3). SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Energy Materials Innovations

• Selection criteria for design services (criteria 1a or 1b). • Selection criteria for building contracts (criteria 2a or 2b). • Selection criteria for building materials and products (criteria 3).

Other quality factors required by the contracting entity Tender price

(38)

Criteria 4b. Design, Build & Operate model in low-carbon building

SUITABILITY REQUIREMENTS APPLICABLE TO ALL TENDERERS

Suitability

• In procurements exceeding the EU threshold value, the company supplying the life cycle service should have a certified environmental management system.

• In procurements exceeding the EU threshold value, the company tendering for the building contract should have a certified environmental management system. • In procurements exceeding the EU threshold value, companies offering building

maintenance should have a certified quality management system for building maintenance.

• The companies submitting tenders should have the number of references required by the contracting entity relating to the building of energy efficient and low-carbon buildings.

• The suitability requirements for design services are applied to these services (1a or 1b). • Verification: The tenderer’s list of references over the period specified by the

contracting entity, taking into account the principles of proportionality and non-discrimination.

MINIMUM REQUIREMENTS FOR THE SUBJECT OF THE PROCUREMENT THAT ALL TENDERS MUST FULFIL

Energy Materials

• Minimum requirements for design services (criteria 1a or 1b), if design is included in the procurement.

• Minimum requirements for building contracts (criteria 2a or 2b). • Minimum requirements for building materials and products (criteria 3). SELECTION CRITERIA FOR WHICH ADDITIONAL POINTS WILL BE AWARDED AS SPECIFIED BY THE CONTRACTING ENTITY

Energy Materials Innovations

• Selection criteria for design services (criteria 1a or 1b). • Selection criteria for building contracts (criteria 2a or 2b). • Selection criteria for building materials and products (criteria 3).

Other quality factors required by the contracting entity Tender price

(39)

PART III

INSTRUCTIONS FOR

APPLYING THE CRITERIA

(40)

5 Instructions

These instructions present in more detail the comparison and calculation methods required in the recommended criteria for low-carbon public building procurements. They include:

Carbon footprint calculation

Life cycle cost calculation

Measuring the electricity, fuel and district heat consumption of the construction site and calculation of emissions

Determining the proportion of renewable and recycled materials

Verifying innovativeness

Correspondence of the criteria to the European Commission’s Green Public Building criteria

Correspondence of the criteria to the most common environmental certification systems for buildings

The instructions were prepared for experts who assess the environmental impacts of public building projects. For this reason, the instructions refer to standards and widely used assessment and calculation methods without providing detailed descriptions of them.

5.1 Carbon footprint calculation

In this context, carbon footprint refers to the emissions caused over the building’s life cycle measured as carbon dioxide equivalent (CO2e). European standards EN 15804 (construction products) and EN 15978 (buildings) as well as the more specific rules applicable to product categories (PCR) must be complied with in the calculations. These standards also explain the division of a building’s and a construction product’s life cycle into modules A to D, to which reference is made below.

It is recommended to use the Green Building Council Finland’s Calculation Guide: Life- cycle Carbon Footprint (13) with the following additions:

(41)

Unless otherwise agreed in an individual project, it is recommended that 50 years should be used as the calculated building life cycle, which is generally used in life cycle assessments.

Input data of the calculation

The carbon footprint from energy consumption should be calculated following GBC Finland’s guidelines.

For the calculation of the life cycle carbon footprint for materials, it is recommended to primarily use data from environmental product declarations prepared and verified in compliance with the EN 15804 standard, and only use generic databases as a secondary source.

If environmental product declarations are used as input data in the

calculations, they must cover the life cycle phases that the calculation concerns.

The database should be selected individually for each project. If the calculation is to be used for comparing different options, the same database and definition of scope should be used in all calculations.

Calculation delimitations, scenarios and allocations

In national procurement projects, the calculation can be simplified following section 4.1 of GBC Finland's Life-cycle Carbon Footprint Calculation Guide. When a building contract exceeds the EU threshold value, the calculation should be based on accurate estimation, at least regarding transport distances (life cycle module A4).

All scenarios to be used will be defined with the contracting entity, so that they correspond to the intended use of the building as realistically as possible.

Physical allocation (based on the dry weights of products) will be used to evaluate manufacturing phase emissions. Economic allocations should be avoided, due to the fluctuation of price levels.

Impacts external to the life cycle system boundary

Any benefits obtained in module D of a building’s life cycle can be presented as part of “low-carbon innovations”.

The benefits may include energy recovery, substitution of fossil energy forms, substitution of virgin raw materials enabled by recycled raw materials, substitution of non-renewable raw materials etc. The impacts of the shown benefits on the building’s life cycle carbon footprint must be

(42)

Consideration of materials’ special features

Concrete carbonation (if included in the calculations)

Calculation method: Standard EN 16757.

The carbon footprint of materials and works for planned repairs of carbonation should also be accounted for in the calculation of the carbonation of concrete structures in the building use phase (module B1).

Carbon stock in timber (if included in the calculations)

Calculation method: standard EN 16485.

The organic carbon stock can be included in the calculation as a negative figure only if the timber originated from a sustainably managed forest (see section 6.3.4.2 of standard EN 16485, example 1).

The carbon stock in a timber product will be released at the latest in life cycle module C.

According to the standard, the organic carbon stock should be reported separately as additional information, allowing it to be deducted from the life cycle carbon footprint at the latest when the building is demolished.

5.2 Life cycle costs

In this context, life cycle costs refer to the costs incurred for the building over its life cycle. The calculation of these costs is based on European standard EN 16627.

It is recommended that the calculation is carried out applying GBC Finland’s Calculation Guide for Life-Cycle Cost (14) with the following additions:

Unless otherwise agreed in an individual project, it is recommended that 50 years should be used as the calculated building life cycle, which is generally used in life cycle assessments.

It is recommended that the costs related to purchasing or renting the site are excluded from the life cycle costing, unless the nature of the life cycle assessment so requires. For example, the costs related to the site may be relevant to the building procurement when the building could be located on alternative sites, or when a site owned by the contracting entity has an alternative possible use that would generate revenue.

Unless otherwise agreed in an individual project, the 3% interest rate referred to in the calculation instructions of cost-optimised levels of energy efficiency in Directive 2010/31/EU (15) may be used.

The life cycle costs of external negative impacts can only be included in the calculations if their monetary value can be determined as described in section 95 of the Act on Public Procurement.

(43)

Electricity and energy prices should be based on current regional or national levels obtained from statistics.

5.3 Measuring a site’s electricity, fuel and district heat

consumption and emission calculations

The consumption of electricity and any district heat used is measured and emission are calculated for all building contracts. In addition, in building procurements exceeding the EU threshold value, emissions from fuels used on site should be included.

5.3.1 Electricity

It is recommended that the on-site electricity consumption is calculated based on electricity bills as a total for the period during which the site has been operational until the building is handed over, unless the contracting entity requires reporting for any other intervals.

The emissions related to the electricity consumed on the site should be calculated using emission coefficients obtained from the electricity supplier. If these are not in use, the emissions for the years in question should be calculated based on the average emission coefficient for Finnish electricity production. If the calculation is made before the site phase commences and the construction year is not yet known, then the most recently available statistical data should be used for the emissions calculation.

If the site produces renewable electricity, its measured amount should be deducted from the electricity used for the site.

The electricity consumed by machines, equipment and plant on the site as well as by temporary site facilities should be included in the site’s electricity consumption. Off-site electricity consumption, including recharging batteries, is not included.

5.3.2 District heating and cooling

The consumption of any district heating and cooling on the site will be reported based on measurements as a total amount for the period during which the site has been operational until the building is handed over, unless the contracting entity requires reporting for any other intervals.

References

Related documents

In our study, we decided to operationalize plaque burden using wall volume (outer vessel wall volume e lumen volume), relative to the outer vessel volume, normalized to carotid

Environment, Energy, and Natural Resources Finance Act, S.F. 2007), available at

Payment experience & Credit limit needs Support credit inquiry Credit Insurance Company Credit communication facilitation Credit communication facilitation Full information

Defendant Tyco International and its subsidiary, Tyco Security, have infringed and continue to infringe the ‘345 and the ‘346 Patents by making, using, selling, or offering for

Two regression models were built to model readmission rates in 2010 and 2012 and in- cluded a dummy variable indicating either not-for- profit or proprietary status, the associated

Action-oriented temperament/ personality traits like impulsivity, novelty seeking and conduct problem could mediate the relation between childhood ADHD symptoms and adult

Results: Here we investigated the reactions of two grapevine cultivars to water stress, the isohydric variety Montepulciano and the anisohydric variety Sangiovese, by

Woodbury PA Bingham Healthcare Specialty Clinic - Washingto 3760 Washington Parkway Idaho Falls ID (208) 535-3637.