Telecom infrastructure

standards for buildings

(2)

Content

Introduction

Telecommunication spaces

02

General specifications

08

Safety and other considerations

09

Temperature and humidity

09

Main telecom room

09

Clustered buildings

10

Mobile Service Room

10

Floor telecom closets

11

Rooftop mobile service room

11

Home consolidation cabinets

11

Office consolidation cabinets

12

Electro-mechanical

12

Mobile service room and rooftop

13

Pathway

14

General specifications

16

Vertical containment

16

Horizontal containment

17

Cables

18

General specifications

19

Fibre optic cables

19

CAT 6 copper cables

20

Administration and

Labelling scheme

21

Bulk service application

22

Other special requirements

24

Entry ducts

24

Appendices

26

Layout & labellings

28

Tables

69

(3)

Introduction

We are pleased to issue the updated

Telecommunications Infrastructure

Standards for Buildings v.5.

The new design guidelines in this

document are based on our prior

experience of offering quality

telecommunications services to our

consumer and enterprise customers

across UAE.

The purpose of this document is to:

• Introduce the new design

guidelines for fibre infrastructure

to enable property developers,

consultants, and contractor

to deliver high-quality,

future-proof telecommunications and

multimedia services to their

tenants.

• Provide a guide for consultants,

contractors, and engineers related

to the ‘No Objection Certificate’

(Building NOC) process that

includes design and construction

drawing review and Structure

Cabling Material data sheets

review, with samples checking and

site inspections required during

implementation.

• Meet the growing demand for

improved communications at work,

at home, in business, and in public

services.

We advise our clients to use qualified

and certified professionals in all

aspects of the application and

implementation of these design

guidelines during building construction

stages.

Developers are encouraged to engage

with us in the early stages so that any

process and/or design issues may be

resolved.

If property developers or tenants have

special requirements that may not

be covered by these guidelines, it’s

necessary to involve our design teams

at an early stage of development

planning, to enable seamless delivery

of premium telecommunications

services at launch.

We look forward to feedback from

developers as it helps us understand

your issues and incorporate valid

suggestions in future designs.

For more information on obtaining

building NOCs or any design-related

queries, please contact us at any of

the below channels:

• Dubai and Northern Emirates NOC help desk: +971 4 391 5018

• Abu Dhabi, Al Ain and Western regions NOC help desk: +971 2 234 4401

• General inquiries and technical support:

800-dunoc

• Email: noc.request@du.ae

• Website: www.du.ae

Thank you, du

(4)

This document covers the following properties types:

• Single villa and villa complexes • Residential towers and groups

of residential towers

• Commercial towers and groups of commercial towers

• Government buildings • Mosque

• Shopping malls

• Groups of shops and retail outlets • Hospitals, hotels, schools, universities

and other bulk service applications • Warehouses, sheds, etc.

The document is structured to cover all aspects of infrastructure for:

• Telecommunication spaces • Electro-mechanical

• Pathways

• Cables and its related accessories • Bulk services

• Duct entry • Labelling scheme

All telecom spaces, pathways, ducts and cabling system specified in this document are designed to meet the requirements of du to provide high-quality, future-proof services to the Customers and should be used for telecommunication services.

The contents of this document are the minimum requirements of du for the new buildings and subject to revision without notice due to continued progress in methodology, design and manufacturing and for the purpose of regulatory compliance.

(5)

Telecommunication

spaces

(6)

Safety and other

considerations

All telecom rooms must comply with municipality and national authority standards and regulations, such as those issued by civil defence and utility companies. Notwithstanding this, it is expected that the following will be provided:

• All telecom spaces should be fitted with smoke detectors connected to the building management system. • All telecom spaces should be fitted

with emergency lighting.

• All containment openings to telecom spaces must be sealed with a

regulation fire retardant material. • All doors to telecom rooms must be of solid wood core or steel construction, fire retardant with a minimum rating of 2 hours.

• All doors to telecom rooms must be outward opening with an automatic door closer system fitted on the hinged edge.

• All doors to telecom rooms must be labelled.

• The room must be free from contaminants and pollutants.

• All telecom rooms should have basic firefighting provision of handheld CO2 cylinder type extinguishers.

• If the building developer has any concerns over safety, especially fire protection and suppression systems, this should be raised with du at the NOC stage.

Temperature

and humidity

All telecom rooms must be maintained at 20°C ± 3°C and the relative humidity at 50% ± 10%. However, floor telecom closets can be maintained within 20°C to 30°C temperature range.

The Main Telecom

Room (MTR)

A main telecom room must be provided on the ground floor for all multi-storey buildings. This room will be used for the termination of telecom fibre optic cables and to house telecom equipment, if needed, now or in the future.

Generally, the MTR can be shared by both du Fixed and Mobile services. If a mobile service room is required in the building (more than G+10) the first mobile service landing room can be shared with the MTR. The minimum combined room dimension should be 4m x 4m x 3m (WxDxH) and maybe increased depending on the functions and features of the building. The room specifications are detailed in Appendix_1_Figure 5 to 9. If the architectural design limits the room sharing, then two dedicated rooms with minimum sizes of 3m x 3m x 3m (WXDXH) each must be provided.

The room specifications are detailed in

Table-1, Table-2, and Appendix_1_Figure-1 to 3 and 18.

Refer to Appendix_1_Figure-14 to 16

for Rack elevation layouts details.

General

specifications

A number of telecom rooms will be required in a building depending on its characteristics. The following room types are required and the details of these rooms shown below:

• Main telecom room • Mobile service room

• Rooftop mobile service room • Floor telecom closet

In multi-storey buildings the telecom rooms should be vertically aligned and linked by a shared containment system. This containment system must not reduce the minimum requested space. All telecom rooms must be dedicated for the use of du. The rooms must be easily accessible to du personnel 24 hours a day and secured from unauthorised entry.

Telecom rooms must not be in close proximity to any sources of the following: • Heat

• Moisture

• Corrosive atmospheric or environmental conditions • High voltages

• Radio frequency interference (RFI) • Electro-magnetic interference (EMI) The rooms must not be directly beneath or next to wet areas such as:

• Showers • Washrooms • Swimming pools • Garbage area

The rooms should be clean and free from any items not directly related to the specifications in this document such as: • Non-du equipment

• Utility pipes • Sprinkler systems • Windows

All telecom spaces and pathways must be pest controlled using best available practices. It should be noted that rodents often gnaw cables resulting in damage and the potential for service disruption. Hence, special attention should be given to preventing rodents from entering telecom spaces and pathways. This could involve the installation of covers to cable trays; if this is the case these covers must be removable to allow for the installation of additional cables.

The walls, floor and ceiling should be painted and treated with dust and anti-static coating to minimise dust and anti-static electricity. Walls and ceilings shall receive primer and finish coat of light colour paint. In order to move equipment into and out of telecom rooms, all entrances must not be smaller than 900mm x 2100mm (WxH).

(7)

Floor Telecom

Closet (FTC)

A floor telecom closet must be provided on each floor of all multi-storey buildings. The floor telecom closet is required to provide a flexible point for the installation, pulling and maintenance of telecom cables. FTC must have a minimum dimension of 2m x 1m x 3m (WXDXH).

The floor telecom closet should be

provided with two outward opening doors with a minimum total opening of 1500mm x 2100mm (WxH). The door should be labelled (Floor Telecom Closet تامدخ ةرجح ةيقباطلا تلااصتلاا )

In the case of a multi-storey villas, townhouses, G+1 warehouses or small retail shops, floor distribution boxes will be required with a minimum size of 300mm x 300mm x 150 mm (WxHxD), as an alternative to replace FTC.

In high rise buildings which usually exceed 30 floors, proper planning and consideration must be given to the FTC space and dimension, which might be increased. It is highly advisable to seek du advice and pay close attention during NOC stage to understand the concept of high rise building infrastructure design. Refer to

Table 3 and 4 and Appendix_1_Figure-4

for the complete detailed layouts of FTC.

Rooftop mobile

service room

(up to G+10)

Rooftop mobile service rooms must be provided on the roof of all multi-tenant buildings up to G+10 and access must be provided to the building riser system. The door dimension must be 900mm x 2100mm (WxH) and opening outwards and should be labelled ‘Roof Telecom Room’

The rooftop mobile room must have a minimum distributed floor load rating of 10 kN/m2.

An opening must be provided with a dimension of 600mm x 400mm (WxH), 500mm below the room ceiling in walls facing the building’s rooftop area.

Space must be reserved on the rooftop of the building for the installation of mobile service antennas. This will vary from building to building, but will typically be at the corners of the building or on any raised structure on the rooftop. The exact details will be defined during the NOC stage. Refer to Appendix _1_Figure-10 for the complete detailed room layouts for mobile service rooms.

Home consolidation

cabinets

The home consolidation cabinet is a space to house du’s network termination equipment. It also serves as the

distribution point for all local wiring. A consolidation cabinet should be provided in each home. This should be a telecom cabinet with the following specifications: • Minimum internal dimensions 600mm

x 600mm x 15٠mm (HxWxD) for 24 or less CAT6 cables termination per unit • Minimum internal dimensions 600mm

x 600mm x 300mm (HxWxD) for more than 24 CAT6 cables termination per unit

• Wall mount or flushed mount installation at 1.2m high measured from the

finished floor level up to the edge of the cabinet.

• Fitted with RJ45 UTP patch panel and cable management.

• Fitted with 2-core fibre terminal box. • 2 nos. 13A twin sockets fed from the

essential power supply with dedicated The 3m clearance height specified is the

minimum finished clearance after taking into account allowances for raised floors (if used), overhead cable trays and any other obstructions such as lighting fixtures and beams. In areas where overhead trays are used, a minimum headroom access of 300mm is required above the tray. Depending on the telecom room usage, a ‘raised floor’ might be required inside the MTR having active equipment, particularly commercial or mixed use buildings. A minimum of 300mm height above the base floor of the room should be provided. Tile cutting details are

specified in Appendix_1_Figure-25. In other cases involving residential buildings, raised floor is not mandatory, and will be further advised during the NOC stage.

The floor level of the room must be constructed at the same level as the outside access or corridor. If this cannot be met, then a suitable ramped entry with an anti-slip surface must be provided. A threshold step of 100mm must also be provided inside the room under the raised floor to prevent any ingress of water from outside the room.

The door of the main telecom room must have outward opening with size not smaller than 900mm x 2100mm (WxH). The door should be labelled ‘Main Telecom Room’ “تلااصتلال ةيسيئرلا ةفرغلا

All cables in the main telecom room must be properly routed to the desired destinations. For this purpose, an

adequately sized cable tray system must be installed to maintain the connectivity as described in Appendix_1_Figure-20 to 21.

Clustered buildings

Group of towers

If a project consists of a cluster of multi-tenant buildings, then all the requirements of a single tower still applies. One of the buildings will be selected as the location for the main telecom room, which usually stands in the centre of the cluster or often times closest to the main telecom duct entry points. This would require the cluster of buildings to be linked to the designated main telecom room via multicore single mode fibre cables. The details of this arrangement should be discussed with du during the NOC stage. Cabling concept is described in the clustered building schematic diagram in Appendix_1_ Figure-22.

The Mobile

Service Room

(more than G+10)

As mentioned in the MTR section, du Fixed and Mobile Services can be combined in one room. The first mobile service room can be shared with the MTR to serve the first 10 floors of the building. If sharing is not feasible, a dedicated 3m x3m x 3m (WXDXH) mobile service room can also be provided. Accordingly, the mobile service rooms must be provided for every 10 floors thereafter. The locations of the mobile service rooms must be close to the floor telecom closet (FTC).

The mobile service rooms must have a minimum distributed floor load rating of 10 kN/m2. The door dimension must be 900mm x 2100mm (WxH) and opening outwards.

The doors should be labelled ‘Mobile Service Room’ كرحتملا فتاهلا تامدخ ةفرغ. Refer to the Table-2 and Appendix_1_

(8)

• Adequate ventilation with ambient temperature maintained at 20°C – 30°C. • Adequate safe working space around the location with ambient lighting. • Not close to sources of water or heat

and any electrical distribution or bus bars.

• Labelled with villa or flat number. A layout of a typical home consolidation cabinet is provided in Appendix_1_Figure-11 to 13

Office consolidation

cabinets

Commercial predefined offices, warehouses, sheds, shops.

The office consolidation cabinet is a space to house du’s network termination equipment. It also serves as the

distribution point for all the local wiring. A consolidation cabinet must be provided in each business area. This should be a telecom cabinet with the following minimum specifications:

• Minimum internal dimensions 600mm x 600mm x 300mm (HxWxD)

• Wall mount or flushed mount

installation at 1.2m high measured from the finished floor level up to the bottom edge of the cabinet.

• Fitted with RJ45 UTP patch panel and cable management.

• Fitted with 2-core fibre terminal box. • Fitted with dual 13A switched socket power outlet fed from a dedicated circuit breaker on the domestic supply. • Sufficient cable entries to accommodate the incoming fibre optic and UTP cables. • Located in an accessible area close to the entrance; avoiding areas such as kitchen, laundry room or bedroom. • Adequate ventilation with ambient temperature maintained at 20°C – 30°C.

• Adequate safe working space around the location with ambient lighting.

• Not close to sources of water or heat and any electrical distribution or bus bars. • Labelled with office/retail/building unit

number.

A layout of a typical office consolidation cabinet is provided in Appendix_1_ Figure-12 to 13

Commercial shell and core

In case of shell and core development (open space office floor with no pre-defined offices), the building’s contractor should install one indoor wall mount mini ODF inside the FTC. The size of the mini ODF will depend on the number of fibre cores required based on the floor area served. In addition, free wall space inside the floor telecom closet must be reserved for future offices terminations. Refer to the FTC layout as shown in Appendix_1_ Figure-4

Mini ODF specifications are as follows: • Lockable side panels.

• Lockable front door.

• Sufficient cable entries to accommodate the incoming fibre optic cables.

• Labelled with floor number. • Labelled ports.

Electro-Mechanical

Main Telecom Room (MTR)

For commercial and mixed used buildings, the following requirements need to be provided:

• SMDB inside the room fed from power supply (with generator backup) for fixed equipment. Refer to the single line diagram in Appendix_1_Figure_27

• 2x32A TP isolators to be provided in the Main Telecom Room - Refer to the SLD in Appendix_1_Figure_27

• 2 nos. 13A twin sockets fed from the essential power supply with dedicated 20A circuit breaker.

• AC and DC earth bars connected to the dedicated earth pits with resistance less than 1ohm.

• Dedicated A/C system (ducted split FCU) with duty and standby units with proper interlocking, to maintain the room temp. at 20+/-3°C.

• Heat dissipation can be considered at 300 Watts/sq.mtr.+3kW per rack. • Room should be provided with

adequate lighting and comply with the fire and safety requirements like smoke detector, fire alarm, emergency light etc. as per local authority standards. Any water sprinklers to be avoided.

• 2 nos. handheld CO2 cylinder

extinguishers to be provided inside the room.

• Add 1x63A TP isolator fed with

dedicated feeder from essential power supply (with generator backup) for GSM equipment – if MTR is shared between du Fixed and Mobile services.

• Heat dissipation to be Increased by 8kW for GSM equipment- if MTR is shared between du Fixed and Mobile services. For residential buildings, the following requirements need to be provided: • 2 nos. 13A twin sockets fed from the

essential power supply with dedicated 20A circuit breaker.

• One earth bar connected to the telecom earth pit with resistance less than 1ohm. • Room must be provided with adequate lighting.

• Room should be provided with air conditioning system to maintain the room temp. at 20+/-3٠C

• Room should comply with the fire and safety requirements like smoke

detector, fire alarm, emergency light etc. as per local authority standards. Any water sprinklers to be avoided. • 2 nos. handheld CO2 cylinder

extinguishers to be provided inside the room.

• Add 1x63A TP isolator fed with

dedicated feeder from essential power supply (with generator back up) for GSM equipment – if MTR is shared between du fixed and Mobile services. • Heat dissipation of 8kW for GSM equipment- if MTR is shared between du Fixed and mobile services.

Mobile Service

Room and Rooftop

Mobile Service Rooms

For all mobile service rooms and rooftop mobile service room, all requirements

mentioned in Passive MTR must be followed including the 1x63A TP isolator and the heat dissipation requirement. Further advice will be given during the NOC stage for the rooftop mobile service room design.

Floor Telecom Closet (FTC)

• Adequate lighting and 1x13A twin socket fed from the normal building supply with dedicated 20A circuit breaker. • Room should comply with the fire and safety requirements like smoke

detector, fire alarm, emergency light etc. as per local authority standards. Any water sprinklers to be avoided. • 1x handheld CO2 cylinder extinguisher. Refer to Appendix_1_Figure-10 for the complete detailed room layouts.

(9)
(10)

General

specifications

The following requirements must be applied to all containment systems: • The containment system must be designed so that installed cables do not exceed the minimum specified bend radius.

• All metal containment parts must be free from sharp edges and earth bonded.

• Telecom riser openings must be sealed with a suitable fire retardant material. • Cable trays must be easily accessible in common areas to facilitate any future provision of additional cables.

• Any cable trays that are in areas accessible to the public and less than 4.8m above the floor must be covered. • Containment systems must not run through areas exposed to excessive heat, moisture, corrosive atmospheric or environmental conditions, high voltages, radio frequency interference (RFI) or electro-magnetic interference (EMI).

• For all containment systems a minimum separation must be maintained from sources of electromagnetic interference. • The building developer may want to consider redundant containment systems, particularly in commercial or prestigious developments. du must be contacted at the design stage to discuss any such requirements.

Vertical

Containment

Multi-storey/multi-tenant buildings

Risers must be provided in multi-storey/ multi-tenant buildings to allow the installation of telecom cables from the main telecom room to the floor telecom closets, mobile service rooms and rooftop mobile service rooms. Hot-Dip Galvanized (HDG) slotted steel cable trays must be provided in the risers to carry the telecom cables between all the telecom rooms. It is recommended that the main telecom room and floor telecom closets should be designed so that they are vertically aligned within the building.

Two cable trays, with the following minimum dimensions are recommended: • One of 500mm x 100mm (WxH) with Heavy Duty Return Flange (HDRF) for fibre optic cables.

• One of 300mm x 50mm (WxH) with Heavy Duty Return Flange (HDRF) for GSM cables (covering all floors from last basement till roof).

If it is not possible to provide all of the cable trays running vertically then horizontal trays of the same size should be provided.

Note: above cable trays requirements to be finalised during NOC stage.

Within homes

In case of multi-floor apartments/villas, the UTP cables between the floors must run through 50mm diameter PVC conduits via junction/pull boxes located on each floor. The junction/pull boxes must have a minimum dimension of 300mm x 300mm x 150mm (WxHxD). The slab opening for these conduits must be in a suitable and accessible location in every floor. It is recommended that all vertical conduit runs be aligned to ease the installation of cables.

Horizontal

Containment

Multi-storey/multi-tenant buildings

The horizontal containment for routing cables from the floor telecom closets to consolidation points on the served floor can use a number of systems (cable trays, conduits, etc.). The solution will depend on the characteristics of the building. Conduits must only be used when the consolidation point locations are permanent, the cable density is low and the flexibility to modify the routing is not required. Specification for the size of this containment is given in

Appendix_1_Figure-20 to 21

Note: Intermediate PVC junction/pull boxes with minimum size of 300mm x 300mm x 150mm (HxWxD) must be provided on individual runs that exceed 30m. PVC junction/pull boxes must also be provided where an individual conduit run has a sharp change in direction.

The cable tray minimum dimensions are described below:

• One 200mm x 50mm (WxH) cable tray with Heavy Duty Return Flange (HDRF) as a main route from floor telecom closet to main corridors and then branches to each consolidation cabinet through cable trays of 50mm x 50mm (WxH).

Mobile service antennas

Cable trays must be provided to route mobile service antenna cables from the floor telecom closets to all common corridors including all lift lobbies in all floors including podium and basement.

One cable tray following minimum dimensions must be provided:

• 150mm x 50mm (WxH) with Heavy Duty Return Flange (HDRF)

For office/commercial buildings, the horizontal containments should be extended till inside the entrance of each office units.

Within homes

All UTP cables inside the home must run through PVC conduit with a minimum 25mm diameter from the home

consolidation point to each dual outlet. If more than one dual outlet is fed by a conduit then the size and quantity of the conduit may need to be increased. Intermediate PVC junction/pull boxes must be provided on individual runs that exceed 30m. PVC junction /pull boxes must also be provided where an individual conduit run has a sharp change in direction.

Cluster of buildings – groups of towers

Where a building consists of a group of towers (on a common shared podium) all of the requirements of a single tower still apply. In addition, cable trays must be provided linking the main telecom rooms of all towers, exact requirement to be finalised during NOC stage.

One cable tray with the following dimension must be provided:

• 300 x 100 (WxH) with Heavy Duty Return Flanged (HDRF)

These trays should be readily accessible in common areas to facilitate any future provision of additional cables. However, if these trays are in an area accessible to the public and are less than 4.8m above the floor then the trays should be covered. For more details, refer to Appendix_1_ Figure-22

(11)

General

specifications

Specifications of all the cables to be used must be submitted to du for approval during the NOC stage. This must also include test reports showing that the performance of the cabling system meets defined requirements. Cable test must be performed using power metre and OTDR tests, whichever is applicable. Details for cable labelling are included in Appendix_2

Fibre Optic Cables

The quantity of fibre optic cables that must be provided and installed from the main telecom room to the consolidation points or FTC depends on the

characteristics of the building.

Drop Fibre Cable

• Indoor rated drop fibre • Individual pairs (2-core) • Single mode

• Suitable for LC/APC connectors • Bend insensitive, ITU-T, G.657A1,

and compliant with G.652D

• Jacket made from halogen free and flame retardant material

• Low Smoke Zero Halogen (LSZH) or Flame Retardant Polythene Sheath (FRP)

Multicore Fibre Cable

• Indoor rated • Single mode

• Compliant with ITU-T, G.657A1 and G.652D

• Jacket made from halogen free and flame retardant material • Low Smoke Zero Halogen (LSZH)

or Flame Retardant Polythene Sheath (FRP)

• Fibre optic colouring code shall be in accordance to EIA/TIA-598

For fibre cables that need to be installed or routed outside the building to serve guard houses or security rooms, or any other similar facilities, outdoor rated fibre cables must be used, with the specifications as mentioned below:

OSP Fibre Cable

• Outdoor rated • Single mode

• Compliant with ITU-T G.652D • Loose tube inner construction or Ribbon type for high density cables • Fibre optic colouring code shall be in accordance to EIA/TIA-598

Fibre optic cable requirements – from main telecom room to consolidation points (direct fibre)

2 core (individual pair) fibre optic cables will be required from MTR up to each apartment, retail shop, and pre-defined office. It is recommended to apply direct fibre installation up to G+30 only to maintain cable management inside the FTC and MTR.

The fibre cables must be provided from the main telecom room to each consolidation point and should be of continuous lengths free from joints, branches or patching. By default, all the fibre cables should pass through the FTC. The fibre cables should be labelled at both ends with a unique reference for the consolidation point served and the room or area of origin. Labelling details are included in Appendix_2

All fibre optic cables should be terminated inside the MTR and inside the unit CP cabinet. Refer to Appendix_1_figure-19

(12)

Fibre optic cable requirements – from MTR to FTC (multicore fibre)

For high rise buildings exceeding G+30, a FTC must be selected for every 10 floors. Multicore fibre cable must be installed in a mini ODF inside the FTC, where the number of fibre core will depend on the number of units in each served floor. 2 fibre cores per unit should be considered as the basic foundation of multicore fibre calculation.

If there are unused fibre cores, these must be left un-terminated and coiled properly inside the mini ODF and the MTR ODF. Refer to Appendix_1_figure-26

Fibre optic cable requirements – from MTR to FTC (shell and core)

For shell and core office development, one pair of fibre optic cable per 200sq m of leasable commercial area should be provided up to FTC of the same floor. Depending on the building design and built up area, multicore fibre cables from 12 cores up to 288 cores may be required to be installed between the MTR and FTC to meet the cable quantity requirement.

The fibre cables should be labelled at both ends with a unique reference for the floor served and the MTR. Labelling details are included in Appendix_2

All fibre optic cables should be terminated inside the MTR and in the FTC mini ODF cabinet. Refer to the FTC layout as shown in Appendix_1_Figure-4

Fibre optic cables – from MTR to all mobile service rooms

12 single mode fibre pair cables must be provided from the main telecom room cascaded to all mobile service rooms ending at the last mobile service room. 10m of spare fibre must be left neatly coiled.

Fibre optic cables – from MTR to rooftop mobile service room

12 single mode fibre pair cables must be provided from the main telecom room to the rooftop mobile service rooms. 10m of spare fibre must be left neatly coiled.

CAT6 Copper

Cables

CAT 6 Copper cables – from

consolidation points to tenant outlets

To deliver services from the consolidation points to the building outlets, unshielded twisted pair (UTP) copper cables must be provided. The complete design of this service is the responsibility of the building developer. However, the following minimum requirements must be followed for the efficient and effective provision of services:

• The cables must conform to a minimum of CAT 6 specification (Category 6, 100 Ohm, 4 pair 23 AWG as specified in ANSI/TIA/EIA 568-B.2 Addendum 1). • The wiring must be in a‘star’topology fanning out from the consolidation point.

• Dual RJ45 outlets with spring load sliding shutters must be provided wherever service is required (all outlets should comply with the performance specifications as detailed in ANSI/TIA EIA 568-B.2 Addendum 6).

• Each socket in the dual RJ45 outlet must

be wired back to the consolidation point. • Outlets must not be cascaded or looped

& there must be no splitting of cable pairs.

• The maximum cable length from consolidation point to outlet must not exceed 90m.

• At the consolidation point the cables should be terminated on an RJ45 patch panel and labelled with the socket and outlet served.

• In each outlet the cable must be terminated to maintain the twists in each pair up to within 5mm of the termination.

• Proper strain relief should be provided at the terminated ends of the cable. • The components of the CAT 6 system

must be from the same supplier or at least compatible to insure maximum performance.

• Design should incorporate built-in flexibility to meet the growing needs of the occupants.

• The CAT 6 cabling system must be tested using an appropriate field test instrument for compliance with ANSI TIA/EIA 568-B.2 Category 6 (or

equivalent if a higher specification has been used)

• Numbering and colouring of the pairs should be as defined in EIA/TIA 568B, SO 11801/EN50173 using the T568B option.

Administration and

labelling scheme

All the infrastructure components described in this document must be clearly and uniquely labelled. The label information must correspond with the description on the as-built drawings.

The type of label must be suitable for the object being labelled and its environment. This is particularly important for cables and consolidation cabinets where a high quality printed self-laminating type must be used. For detail of the Labelling scheme refer to the Appendix_2

(13)

Bulk service

application

Bulk service

requirements

This kind of service solution usually applies to buildings that are having their own IT network and system operator, such as hotels, hospitals, schools, universities, banks, airports, warehouses, workshops and other similar establishments. Sharing the client server or IT room with du can be one solution to deliver the services simply and quickly which is convenient for both du and the client. In such cases of room sharing, free space inside the client room needs to be provided and reserved for du usage. Free space could be either rack unit space in an existing client rack or a floor space inside the room to accommodate a floor mounted rack dedicated for du. A letter from the client should be

submitted during the building NOC stage confirming the bulk service request with detailed information on the required telecom services.

The consultant is advised to approach du prior to the Building NOC submission to be able to assess and decide if sharing the space with the client is the best approach or a dedicated du room is technically recommended for some reason or another. If a dedicated room is required by du, the room specifications as mentioned in the telecom spaces section must be followed. The final du requirements including space, containment, cabling and power will be finalised during the NOC stage.

Cable connectivity between du and the client rack or room must conform to the cabling standard of du, as discussed in the cable section of this document. Single mode fibre, UTP CAT6 and multi pair CAT3 copper cables are generally required, to be supplied, terminated and tested. Final cabling connectivity design including cable type and quantity will be advised during the NOC stage. Refer to the

(14)

Other special

requirements

Public phones, ATM machines and retail kiosks

Provision needs to be made for the connection of public phones, ATM

machines and retail kiosks. This must use the same design as that prescribed for commercial buildings; 2-core single mode fibre (individual pair) from the main telecom room to a business consolidation cabinet must be installed. The final requirement will be finalised during the NOC stage. The business consolidation cabinet must be in a secured location. It is the responsibility of the building developer/consultant to coordinate with du at the NOC stage for any special or non-standard requirement.

Entry ducts

The building developer must provide lead-in ducts from the malead-in telecom room to the plot boundary. The exact connection points at the plot boundary will depend on whether the du network already reaches the plot.

Option 1 – du duct network already exists • The building developer will be

responsible to connect to the du ducting system.

• The operator will identify the location and quantity of their lead-in ducts. Option 2 – du duct network is still to be built

• The building developer will be

responsible to extend the lead-in duct to 1m outside the plot boundary. • The building developer is responsible for locating and clearly identifying lead in ducts.

In both cases the building developer will be responsible for the maintenance and repair of lead-in ducts. The lead-in ducts systems in this document are designed to meet du requirements to serve the development, building or property and must be used for telecommunication purposes. The quantity and size of these ducts for different kind of developments is detailed in Table-6. Refer to the Appendix_1_Figure-23 to 24

The lead-in duct specifications are as follows:

• Made from black uPVC.

• Upmost part of ducts must be buried to a depth of 600mm below finished ground level.

• Clearly marked above ground level for easy location.

• Sloping away from the building. • Protected by concrete when running under permanent paved surfaces. • Sealed at each end to prevent the ingress of any materials such as water, sub-soil, gas, and pests.

• An entry/pull box must be installed for any right-angled or sharp bends in the lead-in duct route.

• If required at the entry to the main telecom room, a wide-angle long radius bend (factory made) may be provided; alternatively an entry box may also be provided.

• All ducts must include a draw rope made of twisted mildew and rot resistant polypropylene; minimum outside diameter of 6mm; minimum tensile strength of 2400lbs/1000kg/ In case of combined plots, two entry locations are still required for primary and secondary network connections; this will be advised by du at the design stage.

Lead-In ducts – villa complex

In the case of a villa complex, the building developer must connect the lead-in ducts to each villa in the complex. The lead-in duct size must not be reduced until the branching point for an individual villa.

Lead-In ducts – group of buildings

In cases where the building developer wishes to share lead-in ducts between a group of buildings (not on a common shared podium), then the design needs must be discussed with du at the design stage.

Lead-In ducts - building entry

Where lead-in ducts cannot be routed directly into the main telecom room, Hot-Dip Galvanized (HDG) slotted steel cable trays must be provided as an alternative. These trays must be easily accessible in common areas to facilitate any future provision of additional cables. However, if these trays are in an area accessible to the public and are less that 4.8m above the floor then the trays must be covered. A cable tray of minimum dimensions 300mm x 100mm (WxH) with Heavy Duty Return Flange (HDRF) will be required for each plot entry point.

Lead-In ducts – entry box

Entry boxes are required to install telecom cables through the lead-in duct. The type and size of entry/pull boxes will depend on the characteristics of the building development. The details for entry boxes are included in the text below and summarised in Table-6. The quantity and location of the entry boxes will depend on the route from the main telecom room to the network.

Entry boxes must be included wherever the duct system has right-angles or sharp bends or other factors to facilitate cable pulling.

The following specifications must be followed:

• Constructed with reinforced concrete. • Fitted with a ductile iron frame and cover.

• Minimum load rating 400kN.

• Cover to be marked ‘du – Telecom’. • An earth rod must be provided with a resistance of less than 5 ohms.

Note: A more detailed set of entry box specifications and drawings are included in Table-6

Please contact noc.request@du.ae

(15)
(16)

٣m.

٣m

.

٢ x handheld CO٢ cylinder extinguishers Smoke detector connected to BMS du fibre entry cable ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١

١٣A twin socket fed from utility power with dedicated circuit breaker

Containment system under the raised floor AC clean earth bar

Building riser

Raised floor

Main Telecommunication Room – Fixed Services

NOTES:

• Building type –Residential

• Number of Units –Up to 300 Units

Appendix_1_Figure 1

NOTES:

• Building type – Commercial / Mixed Use • Number of Units – Up to 600 Units

٣٠٠٠mm.

٤٠٠٠mm.

du fibre entry cable ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١

Containment system under the raised floor

AC clean earth bar

DC clean earth bar

Building riser

٨٠٠x٨٠٠ mm Active Rac

k

High density floor mount ODF racks for building fibres

SMDB

d

u

٢ x ٣٢A three phase isolator fed from SMDB-du

This space is reserved for du – UPS and Batteries Refer to single line diagram ٢ x handheld CO٢ cylinder extinguishers Smoke detector connected to BMS ١٣A twin socket fed from utility power with dedicated circuit breaker

Main Telecommunication Room – Fixed Services

Appendix_1_Figure 2

(17)

NOTES:

• Building type – Residential / Commercial / Mixed Use • Number of Units – Up to 1200 Units

٤m.

٤m.

AC clean earth bar

DC clean earth bar

Smoke Detector connected to BMS Building riser

du fibre entry cable Containment system

under raised floor

٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١ ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١ SMDB d u Active Component Racks Passive Component Racks This space is reserved for du – UPS and Batteries

٢ x ٣٢A three phase isolator fed from SMDB-du

٢ x handheld CO٢ cylinder extinguishers Refer to single line diagram High density floor mount ODF racks for building fibres

١٣A twin socket fed from utility power with dedicated circuit breaker

Main Telecommunication Room – Fixed Services

Appendix_1_Figure 3

٢m.

١m.

Building Riser Smoke Detector connected to BMS ٢ x handheld CO ٢ cylinder extinguishers ١٥٠ mm opening

١٣A twin socket fed from utility power with dedicated circuit breaker Mini - ODF

Floor Telecom Closet

(18)

٤m.

٤m.

٦٠٠x٦٠٠ mm ٢G Rack DC System ٦٠٠x٦٠٠ mm ٣G Rack ٦٠٠x٦٠٠ mm ٤G Rack ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١

AC clean earth bar

DC clean earth bar

٢ x handheld CO٢ cylinder extinguishers

٦٣A three phase isolator fed from essential building power (for GSM equipments) ١٣A twin socket

fed from utility power with dedicated circuit breaker

١٣A twin socket fed from utility power with dedicated circuit breaker ١٣A twin socket fed from utility power

with dedicated circuit breaker Smoke detector

connected to BMS

Building riser

du fibre entry cable Containment system

at high level High density floor mount ODF racks

Main Telecommunication Room - Fixed & Mobile Services

NOTES:

• Building type – Residential

• Number of Units – Up to 600 Units

Appendix_1_Figure 5

Main Telecommunication Room - Fixed & Mobile Services

NOTES:

• Building type – Residential

• Number of Units – Up to 1200 Units

٤m.

٤m.

connected to BMSSmoke detector

Building riser Containment system at high level Wall Mount O DF

١٣A twin socket fed from utility power with dedicated circuit breaker

AC clean earth bar

du fibre entry cable

DC clean earth bar

١٣A twin socket fed from utility power with dedicated circuit breaker

١٣A twin socket fed from utility power with dedicated circuit breaker

٢ x handheld CO٢ cylinder

extinguishers

٦٣A three phase isolator fed from essential building power (for GSM equipments) ٦٠٠x٦٠٠ mm ٤G Rack ٦٠٠x٦٠٠ mm ٢G R ac k ٦٠٠x٦٠٠ mm ٣G Rack DC System Appendix_1_Figure 6

(19)

Main Telecommunication Room - Fixed & Mobile Services

NOTES:

• Building type – Commercial / Mixed Use • Number of Units – Up to 600 Units

٤m

.

AC clean earth bar

Building riser

du fibre entry cable Containment system under the raised floor

DC clean earth bar

SM

DB

٥m.

٦٣A three phase isolator fed from essential building power (for GSM equipments) Smoke detector connected to BMS ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١ ٨٠٠x٨٠٠ mm Active Rack This Space is reserved for UPS and Batteries

High density floor mount ODF racks

١٣A twin socket fed from utility power with

dedicated circuit breaker

٢ x handheld CO ٢ cylinde r extinguisher s ٢ x ٣٢A TP isolator s fed from SMDB – du ٦٠٠x٦٠٠ mm ٣G Rack DC System ٦٠٠x٦٠٠ mm ٢G R ac k ٦٠٠x٦٠٠ mm ٤G Rack

Appendix_1_Figure 7

Main Telecommunication Room - Fixed & Mobile Services

NOTES:

• Building type – Commercial / Mixed Use • Number of Units – Up to 1200 Units

٤m

.

SM DB

٤m.

٨٠٠x٨٠٠ mm Active RACK ٢ x ٣٢A three phase isolator fed from SMDB-du (Fixed Equipment) High density floor mount ODF racks

٨٠٠x٨٠٠ mm RACK ١ This Space is reserved for UPS and Batteries Building riser

AC clean earth bar DC clean earth bar du fibre entry cable Containment system under the raised floor

١٣A twin socket fed from utility power with dedicated circuit breaker ٢ x handheld CO٢ cylinder extinguishers ٦٣A three phase isolator fed

from essential building power (for GSM equipments) ٦٠٠x٦٠٠ mm ٣G Rack ٦٠٠x٦٠٠ mm ٤G Rack ٦٠٠x٦٠٠ mm ٢G R ac k Smoke detector connected to BMS DC System Appendix_1_Figure 8

(20)

Main Telecommunication Room - Fixed & Mobile Services

NOTES:

• Building type – Residential / Commercial • Number of Units – Up to 1200 Units

٥m.

٥m.

SM DB This S pace is reserved for UPS and Batteries Smoke detector connected to BMS AC clean earth bar

DC clean earth bar

du fibre entry cable Containment system

under the raised floor

High density floor mount ODF racks

٢ x ٣٢A three phase isolator fed from SMDB-du (Fixed Equipment) ١٣A twin socket fed

from utility power with dedicated circuit breaker

٢ x handheld CO٢ cylinder extinguishers

٦٣A three phase isolator fed from essential building power (for GSM equipments) Building riser ٦٠٠x٦٠٠ mm ٣G Rack ٦٠٠x٦٠٠ mm ٤G Rack ٦٠٠x٦٠٠ mm ٢G R ac k DC System Active Component Racks ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١ Passive Component Racks ٨٠٠x٨٠٠ mm RACK ٢ ٨٠٠x٨٠٠ mm RACK ١

Appendix_1_Figure 9

Mobile Service Room

٣m.

٣m

.

du Fibre entry cable Smoke detector connected to BMS AC clean earth bar

DC clean earth bar

١٣A twin socket fed from utility power with dedicated circuit breaker

٢ x handheld CO٢ cylinder extinguishers

٦٣A three phase isolator fed from essential building power

Building riser

NOTES:

• Provide Mobile Service Room for ever 10th floor

(21)

Consolidated Cabinet Elevation

١٥٠mm ١٢ U

Cable Manager –١U ٢٤ Port Cat ٦ Patch Panel–١U

PERFORATED DOOR

٦٠٠mm

۱۲۳٤٥٦ ۷۸۹۱۰۱۱۱۲ ۱۳۱٤۱٥۱٦۱۷۱۸ ۱۹۲۰۲۱۲۲۲۳۲٤

ATB Fibre Terminal Boxwith ٢ Core LC/APC

Adapter

٣U – Metallic Support to hold du CPE

١٢ U consolidation cabinet with ١٥٠ mm depth

١٣A twin Socket

Appendix_1_Figure 11

Consolidated Cabinet Elevation

12 U Consolidation Cabinet with 300mm depth

12 U Consolidation Cabinet with 150mm depth

٣٠٠mm ١٢ U PERFORATED DOOR

٦٠٠mm

۱۲۳٤ ٥٦ ۷ ۸۹۱۰۱۱۱۲ ۱۳۱٤۱٥ ۱٦۱۷۱۸ ۱۹۲۰۲۱ ۲۲۲۳۲٤ ATB

١٢ U consolidation cabinet with ٣٠٠ mm depth

Cable Manager –١U ٢٤ Port Cat ٦ Patch Panel–١U

Fibre Terminal Box with ٢ Core LC/APC Adapter

١U – Metallic Support to hold du CPE ١٣A twin Socket

(22)

Mounting Details - Consolidated Cabinet

١٢ U cabinet

Wall

Wall Wall

١٢ U cabinet

Mounting option – ١

(Mounted on the wall)

Mounting option – ٢

(Partial mounted inside the wall)

Mounting option – ٣

(Fully Mounted inside the wall)

١٢ U cabinet

Cabinet depth = ١٥٠mm / ٣٠٠mm

1.2 meter to 1.4 meter from FFL

1.2 meter to 1.4 meter from FFL

Finished floor level (FFL)

Finished floor level (FFL)

1.2 meter to 1.4 meter

from FFL Finished floor level (FFL)

Cabinet depth = ١٥٠mm / ٣٠٠mm

١٥٠mm / ٣٠٠mm

Appendix_1_Figure 13

Rack Elevation – Residential Type

٣٠٠mm. ٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ iPatchFiber ۱۰ BA ۱۱ BA ۱۲ BA ۷ BA ۸ BA ۹ BA ٤ BA ٥ BA ٦ BA ۱ BA ۲ BA ۳ BA Fibre Patch Panel

– Supply and installation by du

Building Fibre Termination

Area ٢٠ U – ٢٤ U Vertical rings

Finished Floor Level

Raised Floor Tiles

٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ Building Fibre Termination Area ٢٠ U – ٢٤ U This area is reserved for the

installation of splitters by du

١٨ U This area is

reserved for the installation of splitters by du

١٨ U

RACK-2 Space Reserved for du RACK-1

NOTES:

• Maximum number of fibre cores to be terminated per rack are 480 cores • Building type – Residential

• Number of Units – Up to 300 Units

(23)

Rack Elevation – Commercial Type

٣٠٠mm. ٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ i Patch Fiber ۱۰ BA ۱۱ BA ۱۲ BA ۷ BA ۸ BA ۹ BA ٤ BA ٥ BA ٦ BA ۱ BA ۲ BA ۳ BA Fibre Patch Panel

– Supply and installation by du

Building Fibre Termination

Area ٢٠ U – ٢٤ U Vertical rings

Finished Floor Level

Raised Floor Tiles

٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ Building Fibre Termination Area ٢٠ U – ٢٤ U This area is reserved for the

installation of

active equipment

by du ١٨ U This area is

reserved for the installation of

active equipment

by du ١٨ U

RACK-2 Space Reserved for du RACK-1

Equipment by du ١٨- U

NOTES:

• Maximum number of fibre cores to be terminated per rack are 480 cores • Building type – Commercial

• Number of Units – Up to 300 Units

Appendix_1_Figure 15

Rack Elevation – Residential & Commercial Type

NOTES:

• Maximum number of fibre cores to be terminated per rack are 480 cores • Building type – Mixed use

• Number of Units – Up to 300 Units

٣٠٠mm. ٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ iPatchFiber 10 BA 11 BA 12 BA 7 BA 8 BA 9 BA 4 BA 5 BA 6 BA 1 BA 2 BA 3 BA Fibre Patch Panel

– Supply and installation by du

Building Fibre Termination

Area ٢٠ U – ٢٤ U Vertical rings

Finished Floor Level

Raised Floor Tiles

٤٢ ٤٠ ٣٩ ٣٨ ٣٤ ٣٥ ٣٦ ٣٧ ٣٣ ٠٢ ٠٣ ٠٤ ٠٥ ٠٦ ٠٧ ٠٨ ٠٩ ١٠ ١٣ ١٤ ١٦ ١٧ ١٨ ١٩ ٢٠ ٢١ ٢٢ ٢٣ ٢٤ ٢٥ ٢٦ ٢٧ ٢٩ ٣٠ ٣١ ٣٢ ١١ ١٢ ٢٨ ١٥ ٤١ ٠١ Building Fibre Termination Area ٢٠ U – ٢٤ U This area is reserved for the

installation of active equipment

by du ١٨ U This area is

reserved for the installation of splitters by du

١٨ U

RACK-2 Space Reserved for du RACK-1

(24)

Bulk Service Setup

٣٠٠ mm cable tray at high level 42 40 39 38 34 35 36 37 33 02 03 04 05 06 07 08 09 10 13 14 16 17 18 19 20 21 22 23 24 25 26 27 ۲۹ 30 31 32 11 12 28 15 41 01 iPatchFiber ۱۰ BA ۱۱ BA ۱۲ BA ۷ BA ۸ BA ۹ BA ٤ BA ٥ BA ٦ BA ۱ BA ۲ BA ۳ BA 42 40 39 38 34 35 36 37 33 02 03 04 05 06 07 08 09 10 13 14 16 17 18 19 20 21 22 23 24 25 26 27 ۲۹ 30 31 32 11 12 28 15 41 01 Client server rack ۱۲۳٤٥٦۷۸۹۱۰۱۱۱۲۱۳۱٤۱٥۱٦۱۷۱۸۱۹۲۰۲۱۲۲۲۳۲٤ iPatchFiber ۱۰ BA ۱۱ BA ۱۲ BA ۷ BA ۸ BA ۹ BA ٤ BA ٥ BA ٦ BA ۱ BA ۲ BA ۳ BA i Patch Fiber 10 BA 11 BA 12 BA 7 BA 8 BA 9 BA 4 BA 5 BA 6 BA 1 BA 2 BA 3 BA

۱۲۳٤٥٦۷۸۹۱۰۱۱۱۲۱۳۱٤۱٥۱٦۱۷۱۸۱۹۲۰۲۱۲۲۲۳۲٤ ٢٤ port Cat ٦ Patch Panel

١٢ Core SM Fibre Patch Panel ٥٠ Pair ١١٠ Block for Cat ٣ Copper Cables ١ U – Cable Manager ١٢ Core SM Fibre Patch Panel

٢٤ port Cat ٦ Patch Panel ٥٠ Pair ١١٠ Block for Cat ٣ Copper Cables ٢٤ Core SM Fibre Patch Panel by du

du MDF room

Client server room

٣٠٠mm.

Finished Floor Level

This area is reserved for the

installation of active equipment

by du ١٨ U

NOTES:

The bulk service cabling minimum requirements between du rack and client server rack are as below:

1) 12 core single mode fibre cables 2) 24 number of CAT6 cables 3) 50 Pair of CAT3 cables

All cables should be terminated at both sides (inside du rack and client rack) in 42U cabinets - the distance between the two racks should be less than 70 meters

Appendix_1_Figure 17

Wall mount ODF inside MTR/FTC

Wall Mount ODF

Sub rack for du splitter ٢ Core LC/ACP

Adapters

Ring Ring Ring

Opening for Fibre Cables from Building Riser

Du Fibre Entry Cables

Splicing Tra y Splicing Tra y Splicing Tray Splicing Tra y Ring Ring Ring

Wall Mount ODF

Perforated door

Finished Floor Level (FFL) Installed at ١ meter to ١٫٢ meter from FFL Cable Tray at High Level For Building Fibre Cables

(25)

Fibre Terminal Box

Fibre Terminal Box (FTB) inside 12U cabinet

12cm (W)

9cm

(H)

2.5cm (D)

2 Core fibre cable entry to the fibre terminal box Option-1 2 core fibre cable entry to the access terminal box Option-3

2 core fibre cable entry to the access terminal box

Option-2 2 core fibre LC/APC adapter

Minimum 1 meter pigtail inside the FTB Terminate the end of the pigtail-1 to Core-1 of SM fibre cable Terminate the end of the pigtail-2 to Core-2 of SM fibre cable

1 2

Appendix_1_Figure 19

Schematic Diagram with Separate MTR

and Mobile Service Rooms

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1 Ground Floor ١stFloor ٥thFloor ١٠thFloor ٢٠thFloor ٣٠thFloor Roof Floor ٣rdBasement Floor

Mobile Service Room (GSM) ٣٠٠mm Cable Tray between MTR and Mobile Service Room

Ducts for du entry Cables Ducts for du

entry Cables

٣٠٠mm Cable Tray between MTR and Entry Ducts MTR Room

for Fixed Services FTC ROOM

٣٠٠mm Cable Tray for GSM Cables ٥٠٠mm Cable Tray for Building Fibre Cables

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

٥٠mm Cable Tray

Building Type – Residential /Commercial/Mixed Use

Roof Top GSM room

٢٠٠mm Cable Tray for Horizontal Distribution

٢٠٠mm Cable Tray for Horizontal Distribution FTC ROOM FTC ROOM FTC ROOM FTC ROOM

Mobile Service Room at Every ١٠th Floor Mobile Service Room at Every ١٠th Floor Mobile Service Room at Every ١٠th Floor

Appendix_1_Figure 20

NOTES:

An Unit would be Apartment, Retail shop, Pre-defined office, Reception, Security room, BSM Room, Child Play Area, Restaurant, GYM, Penthouse etc..

(26)

Schematic Diagram with Combined MTR

and Mobile Service Rooms

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1 Ground Floor ١stFloor ٥thFloor ١٠thFloor ٢٠thFloor ٣٠thFloor Roof Floor ٣rdBasement Floor Ducts for du entry Cables Ducts for du entry Cables

٣٠٠mm Cable Tray between MTR and Entry Ducts Combined MTR and Mobile Service Room

for Fixed and GSM services FTC

ROOM

٣٠٠mm Cable Tray for GSM Cables ٥٠٠mm Cable Tray for Building Fibre Cables

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit -04 Unit-02

Unit -X1

٥٠mm Cable Tray

Building Type – Residential/Commercial/Mixed Use

Roof Top GSM room

٢٠٠mm Cable Tray for Horizontal Distribution

٢٠٠mm Cable Tray for Horizontal Distribution FTC ROOM FTC ROOM FTC ROOM FTC ROOM

Mobile Service Room at Every ١٠th Floor Mobile Service Room at Every ١٠th Floor Mobile Service Room at Every ١٠th Floor

Appendix_1_Figure 21

Schematic diagram – Clusters of Building

Building

١

Building

٦

Building

٥

Building

٤

Building

٣

Building

٢

Main MTR MTR MTR MTR MTR MTR

Provide minimum of ٣٠٠ x ١٠٠ mm Cable tray from Main MTR to MTR of each building Ducts for du fibre entry

cables Common Podium Leve l Plot Limit Plot Limit Plot Limit Plot Limit

Provide high density fibre cables from Main MTR to MTR of each building inStar Topology

(27)

Schematic diagram – Single Villa Infrastructure

Entry Box ٦٠x٦٠x٨٠cm

Ground Level

PLOT LIMIT

PLOT LIMIT

٢W D٥٦ lead in duct to be extended ١ meter from the plot limit

٢W D٥٦ ducts from villa entry box to villa cabinet

Appendix_1_Figure 23

Schematic diagram – Complex of Villas Infrastructure

Villa 01 Villa 18 Villa 02 JRC12 JRC١٢ JRC١ ٢ JRC١٤

Ducts from du infrastructure

Villa 03 Villa 04 Villa 05 Villa 06 Villa 07 Villa 08 Villa 09 Villa 10 Villa 11 Villa 12

Villa 13 Villa 14 Villa 15 Villa 16 Villa 17 Villa 19 Villa 20 Villa 21 Villa 22 Villa 23 Villa 24 Villa 25 Villa 26 Villa 27 Villa 28 Villa 29

٢W D٥٦ ducts from each villa Entry box to Manhole- JRC ١٢ ٢W D٥٤ ducts between manholes ٢W D٥٤ ducts between manholes

٤W D٥٤ ducts PLOT LIMIT PLOT LIMIT PLOT LIMIT PLOT LIMI T Entry Box Lead in ducts Appendix_1_Figure 24

(28)

Tile Cutting Layout

٣٠٠mm (W) x ٣٠٠mm (H)

Opening for Cables Entry

٦٠٠mm (W)

٦٠٠mm (H)

١٥٠mm ١٥٠mm

Appendix_1_Figure 25

Schematic Diagram – High Rise Building

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit-02

Unit -X1

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit-02 Unit -X1 Ground Floor ٢٠th Floor ٣٠th Floor ٤٠th Floor ٥٠th Floor ٦٠th Floor ٧٠th Floor with roof

٣rdBasement Floor

Ducts for du entry Cables Ducts for du

entry Cables

٣٠٠mm Cable Tray between MTR and Entry Ducts FTC ROOM MINI ODF FTC ROOM MINI ODF FTC ROOM MINI ODF FTC ROOM

٣٠٠mm Cable Tray for GSM Cables ٥٠٠mm Cable Tray for

Building Fibre Cables

Unit -01 Unit -03 Unit-05 Unit-7 Unit-9 Unit- X Unit -06 Unit-02

Unit -X1

٥٠mm Cable Tray

Building Type – Residential/Commercial/Mixed Use

Roof Top GSM room

٢٠٠mm Cable Tray for Horizontal Distribution

٢٠٠mm Cable Tray for

Horizontal Distribution Mobile Service Room at Every ١٠th Floor

Indoor Multi Core SM Fibre Cables to Connect from MTR to Mini ODF’s

FTC ROOM

MINI ODF

MTR ROOM

(29)

Power Single line diagram – SMDB

٣٢A TP MCCB ٣٢A TP MCCB ٣٢A TP MCCB ٣٢A TP MCCB ٣٢A TPMCCB spaces ٦٣A TP Iso.

ESMDB-MTR supplied by building contractor

Essential DB Permanent Power Generator Power ATS ١ ٢ ٣ ٣ x spares ٣٢A TP Isolator ٣٢A TP Isolator ٤Cx ١٠mm٢ XLPE/ SWA + ١CX١٠ ECC

Appendix_1_Figure 27

JRC 12 Top View

4 way D54 Duct For building entry (Lead in) / Road crossing if required only

5 5 5 55 55 5 5 5 5 5 5 45 5 5

A

A

PLAN

(Item 3 and surround omitted)

(30)

JRC 12 Items detail

Appendix_2_Figure 29

Reinforcement details for guidance only.

Schedule

JRC 12 Section A-A

١٧٥ ١٥٠ 50/60 460 745 200 min 185 75 1130 ٢٠٠ ١٥٠ 4 Bars @ 180 C/ C ١٣٠ 70 ٢٧٥ ١٨٥ ٢٣٠ ١٣٠ ٧٥ ٥٤٥ ١,٢ Step ٤ ١٢٥ ١٢٥ ١٥٠ ٢٥mm cement rendering with fall to sump Construction joint Landscaping/Tiling Water bar (under water level) Tanking membrane

Class (C) concrete blinding

B

B

Appendix_2_Figure 30

Item Description Number

1 Bolts, Foundation, Indented No. 2 4

2 Cable bearers wall type No. 3 2

3 Frame and cover carriageway type No. 2 1

4 Grating, Sump No. 2A 1

5 Irons, Anchor No. 4 2

6 Step, Manhole No. 1 1

7 Reinforcement bar 10 diameter X 200 18

8 Reinforcement bar 10 diameter X 795 14

9 Reinforcement bar 10 diameter X 845 8

10 Reinforcement bar 10 diameter X 1330 5

(31)

JRC 12 Section B-B

Landscaping/Tiling

Construction joint Water bar

(under water level)

5 Bars @ 140 C /C ١٨٥ ٢٣٠ ١٣٠ ٢٧٥ ٧٥ ١3٠ 50 185 75 745 100 1130 20 0 min ١٥٠ 50/60 ٦ ١١ ٤ ٥ 460

Appendix_2_Figure 31

JRC 14 Items detail

Appendix_2_Figure 32

Item Description Number

1 Bolts, Foundation, Indented No. 2 8

2 Cable bearers wall type No. 3 3

3 Frame and cover carriageway type No. 2 1

4 Grating, Sump No. 2A 1

5 Irons, Anchor No. 4 2

6 Step, Manhole No. 1 2

7 Reinforcement bar 10 diameter X 200* 22

8 Reinforcement bar 10 diameter X 230* 1٠

9 Reinforcement bar 10 diameter X 845* 4

10 Reinforcement bar 10 diameter X 900* 8

11 Reinforcement bar 10 diameter X 910* 3٠

12 Reinforcement bar 10 diameter X 1045* 12

13 Reinforcement bar 10 diameter X 2485* 8

14 Reinforcement bar 10 diameter X 1100* 12

15 Reinforcement bar 10 diameter X 2485* 12

(32)

JRC 14 Top View

12 No. Bars @ 220 C/C 1285 150 175 635 300 230 55 175 175 260 1715 260 175 200 20 2585 200 20 150

A

A

PLAN

(Item 3 and surround omitted)

Appendix_2_Figure 33

JRC 14 Section A-A

Appendix_2_Figure 33a

Construction joint Water bar (under water level)

Tanking membrane Class (C) concrete blinding

Landscaping/Tiling

Varies to suit site conditions

٢٥mm cement rendering with fall to sump

١٣٠٠ ١٨٥ ٩١٥ 90 225 140 225 200 300 560 130 70 200 130 130 100 100 203 915 203 Slope 915 1,2 15 9 3 10 65656565 380 380 230 205 50/60 150 150 150 275 75 ٢٠٠ min.

(33)

Appendix_2_Figure 34

JRC 14 Section B-B

Construction joint Landscaping/Tiling Water bar

(under water level)

١٣٠ 275 75 75 185 745 15 0 1245 1130 200 min

JRC 4 Top View

Appendix_2_Figure 35

A

A

PLAN

(Item 3 and surround omitted)

١٥٠ 460 150 170 190 760 ١٥٠ 200 915 6 5 4 Bars @ 200 MM

For building entry (Lead in) 4 way D54 Duct

(34)

Appendix_2_Figure 36

JRC 4 Items detail

JRC 4 Section C-C

Appendix_2_Figure 37 5 Bars @ 230 MM Bars @ 230 MM 150 150 8 7

Item Description Number

1 Bolts, Foundation, Indented No. 2 4

2 Cable bearers wall type No. 2 2

3 Frame and cover carriageway type No. 4 1

4 Reinforcement bar 10 diameter X 660 8

5 Reinforcement bar 10 diameter X 845 14

6 Reinforcement bar 10 diameter X 1115 8

7 Reinforcement bar 10 diameter X 150 16

8 Reinforcement bar 10 diameter X 710 2

9 Reinforcement bar 10 diameter X 1165 2

(35)

Appendix_2_Figure 38

JRC 4 Section A-A

B

B

C

C

4 Bars @ 180 MM 130 200 190 535 190 1 & 2 8 7 3 100

25mm cement rendering with fall to one end. Direction to be determined by site conditions

Construct concrete surround as required. 100mm min. for unmade surface

JRC 4 Section B-B

Appendix_2_Figure 39

4

Bars

@

180

MM

120

200

830

100

100

90

9

7

(36)

Number

of units

MTR Sizes in Meter

(L X B X H)

Residential

MTR Sizes in Meter

(L X B X H)

Commercial /mixed use

Up to 600

3 x 3 x 3

3 x 4 x 3

600 to 1200 4 x 4 x 3

4 x 4 x 3

More than

1200

Will be Advised

at NOC Stage

Will be Advised

at NOC Stage

Main Telecom Room Sizes – Fixed Services

Table 1

Tables

NOTES:

Labelling scheme for wall mount ODF, Floor mount ODF, Mini ODF, Indoor multicore fibre cables will be advised at NOC stage

Labelling Scheme

Labelling Scheme for 96 Core ODF

Labeling Scheme for 2 core SM fibre cables using ferrule (during cable pulling)

2 Core SM fibre cables at MTR side 2 Core SM fibre cables at UNIT side

MTR/FTR number-core number

F02-ACP04-C01

GR-REP-C01

GR-REP-C02

Example for apartments Example for offices Example for Retail Shops<

References

Related documents

Gabriel Brooks, PT, DPT, SCS, MTC, is the Sports Medicine Coordinator at Texas Children’s Hospital and is a board certified Sports Clinical Specialist and a Manual Therapy

– Tenant Service Accounting rack, cable, power, cooling network infrastructure compute infrastructure hypervisors operating systems applications switching infrastructure

Strategic Value Plays Traditional Global Consolidation Transformation $ P.. Experience – Over 12 years experience managing over 100 blue chip

( 2016 ) studied the swirl generator at various flow regimes and demonstrated that the size of the vortex rope, size of the on-axis stagnant region and the pressure pulsation

How long does it take to change your ways and start using The Easy Rule of Life to your advantage? But a second or two. Then the uncomfortable work begins of continuing to utilize

A systematic review was conducted to explore the impact of education programmes on factors affecting paediatric nurses’ postoperative pain management practice.This was done

Second line of Mahās ṣod ṣaśī mantra is formed thus; after these five bīja-s (in the first line), place pran ṣava, māyā bīja and śrī bīja and the second line appears

Assuming a 250 rack data center where one aggregation appliance is installed for every 5 racks and three sensors are installed each rack, the total time to install the solution