• No results found

Comparison of Two Methods Cost and Reliability for Components in Architecture based Software System using Dynamic Programming

N/A
N/A
Protected

Academic year: 2020

Share "Comparison of Two Methods Cost and Reliability for Components in Architecture based Software System using Dynamic Programming"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2:  Cost and Reliability Dataset

References

Related documents

The present study was designed to compare the clinical outcomes of arthroscopic ACL reconstruction with autogenous hamstring graft fixed in femoral side by endobutton

The study of Madahi, Samadzade & Javidi (2013) showed that there is a significant negative relationship between marital dissatisfaction and mutual constructive

For Alabama, Arkansas, Connecticut, Delaware, District of Columbia, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts,

Arizona Foundation for Medical Care (Scripps Clinic only) ,Beech Street PPO Network (also known as Concentra, CappCare, PPONext), Anthem Blue Cross HMO (also known as

Networks shown are subsets of (a) two-dimensional rigid regular directed lattice with coordination number K = 2 (black dashed lines); (b) layered network with a randomised

Therefore the results obtained in this work has shown that with the deployment of 6-sectored cell technique, the signal-to- interference ratio has been improved drastically which

The other option open was emergency detention under the Mental Health (Care and Treatment) (Scotland) Act 2003. Having read Ms AB’s notes and discussed her care with staff, we

Think Pair Share (TPS) technique can encourage the students’ activities in reading since it is an interesting technique that can involve the students to work