APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE

Description Quantity Cost Total Cost

1 CASCADE FALLS

1a Existing Cascade Falls Upgrades

Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000 $500,000 Mechanical Repairs - Plumbing, Vaults/Chambers Lump Sum $400,000 $400,000 Electrical Upgrades - Sidewalk Lights, Fountain Lights

(LED), Special Effects, Wiring

Lump Sum $500,000 $500,000 Acoustics - Synchronized with Electrical/Mechanical Lump Sum $250,000 $250,000 Perimeter Fencing - 8' Ornamental with Gates 2,000 LF $120 $240,000

Contingency $378,000

Engineering, Survey, Permits, Testing $340,000

Total: $2,608,000

1b Expanded Cascade Falls Area: 9 Features

Structural/Mechanical 9,000 SF $300 $2,700,000 Electrical - Sidewalk Lights, Fountain Lights (LED),

Special Effects, Wiring

Lump Sum $350,000 $500,000 Acoustics - Synchronized with Electrical/Mechanical Lump Sum $250,000 $250,000 Concrete Pavement - 6" Thick 19,500 SF $8 $156,000

Flagpole - 50' Tall 1 Each $20,000 $20,000

Benches 30 Each $1,000 $30,000

Landscape/Irrigation Lump Sum $100,000 $100,000

Contingency $750,000

Engineering, Survey, Permits, Testing $675,000

Total: $5,181,000

1c Amphitheater Area

Site Demolition - Buildings, Pavement, Walls, Seating Lump Sum $100,000 $100,000

Earthwork 7,000 CY $8 $56,000

Retaining Walls 500 LF $750 $375,000

Concrete Pavement - 6" Thick 52,000 SF $8 $416,000

Concrete Stage 1,600 SF $20 $32,000

Concrete Amphitheater 22,000 SF $15 330,000

Seating 2,500 Each $150 $375,000

Lighting/Electrical Lump Sum $125,000 $125,000

Acoustics Lump Sum $50,000 $50,000

Ornamental Fencing - 8' tall 550 LF $200 $110,000

Columns 30 Each $5,000 $150,000

Drainage Lump Sum $50,000 $50,000

Concessions Buildings - 3,000 SF each 2 Each $1,050,000 $2,100,000 Landscape/Irrigation Lump Sum $50,000 $50,000

Contingency $836,000

Engineering, Survey, Permits, Testing $777,000

Total: $5,932,000

(2)

2 HISTORIC PAREDO RESTORATION

Vegetation Removal Lump Sum $20,000 $20,000 Grade Surface of Path and Widen 1,500 LF $30 $45,000 Place Fill Along Perimeter to Raise Grade - 20' Wide 2,200 CY $15 $33,000

Seed and Mulch 2 Acres $4,000 $8,000

Gateway Plaza (Gravel Surface) 21,000 SF $1 $21,000

Historic Benches 16 Each $1,000 $16,000

Gateway Historic Railing 100 LF $500 $50,000 Arched Historic Bridge 3 Each $50,000 $150,000

Landscape Lump Sum $15,000 $15,000

Contingency $71,000

Engineering, Survey, Permits, Testing $64,000

Total: $493,000

3 CHILDREN'S PLAY AREA

Bituminous Parking Lot by Playground - 30 Stalls,

3" Thick 12,800 SF $1.75 $22,400

Earthwork for Parking Lot 12,800 SF $1 $12,800 Parking Lot Drainage Lump Sum $15,000 $15,000

Concrete Wheel Stops 30 Each $70 $2,100

Parking Lot Striping and Signage Lump Sum $400 $400

Bituminous Sidewalk 3,100 SF $1.75 $5,400

Expanded Playground Lump Sum $100,000 $100,000 Interactive Splash Pool 3,700 SF $200 $740,000 Concrete Splash Pool Patio - 4" Thick 3,600 SF $4 $14,400 Multi-Use Structure - Pool Mechanical,

Picnic Shelter and Restrooms Lump Sum $250,000 $250,000

Picnic Tables 12 Each $600 $7,200

Reconstruct 40 Stall Gravel Lot East of Ice Cream Concessions Building and Install Bituminous Pavement - 3" Thick

17,500 SF $2 $35,000

Concrete Wheel Stops 40 Each $70 $2,800

Parking Lot Striping and Signage Lump Sum $500 $500

Seed and Mulch Lump Sum $5,000 $5,000

Contingency $242,000

Engineering, Survey, Permits, Testing $218,000

Total: $1,673,000

4 OPEN FIELD AREA - PASSIVE RECREATION

Disk Golf - Galvanized Steel Deluxe Baskets 9 Each $600 $5,400 Picnic Tables (informal Placement) 15 Each $600 $9,000

Cooking Grills 5 Each $600 $3,000

Contingency $3,500

Engineering, Survey, Permits, Testing $3,100

Total: $24,000

(3)

5 BANDSHELL AND RESTROOMS

Demolition - Parking Lot Pavement Removal Lump Sum $5,000 $5,000 Resurface Parking Lot - 220 Stalls, 1.5" Lift 56,000 SF $1.25 $70,000 Bituminous Entry Drive - 3" Thick 8,800 SF $2 $17,600

Striping/Signage Lump Sum $4,000 $4,000

Concrete Sidewalk - 8' Wide, 4" Thick 5,600 SF $4 $22,400

Parking Lot Gate 2 Each $5,000 $10,000

Bandshell Façade Modifications Lump Sum $15,000 $15,000 Tree Plantings, Seed and Mulch Lump Sum $15,000 $15,000

Contingency $32,000

Engineering, Survey, Permits, Testing $28,000

Total: $219,000

6 NATURAL AREA - TROUT POND

Pond Dredging - 10' Average Depth 3,700 CY $10 $37,000 Grade Disposal Area 1.5 Acres $5,000 $5,000 Stream Channel Construction - 4' - 5' Wide 800 LF $300 $240,000 Wood Fishing Platform - 40' x 25' 1,000 SF $50 $50,000 Picnic Shelter - 30' x 60' 1 Each $80,000 $80,000 Concrete Pavement for Picnic Shelter 2800 SF $4 $11,200

Sidewalk 5' Wide 750 SF $4 $3,000

Interpretive Sign Panels 10 Each $2,000 $20,000

Seed and Mulch 2 Acres $4,000 $8,000

Picnic Tables 20 Each $600 $12,000

Grill 4 Each $600 $2,400

Contingency $94,000

Engineering, Survey, Permits, Testing $83,400

Total: $646,000

(4)

8 ACTIVE RECREATION AREA

Basketball Court - 60' x 110' 6,600 SF $5 $33,000 In-Line Hockey Rink - 125' x 250' 31,250 SF $7 $218,750 Skateboard Park - 100' x 200' 20,000 SF $10 $200,000 Double Tennis Court - 100' x 120' 12,000 SF $6 $72,000

Batting Cages Lump Sum $30,000 $30,000

Putt-Putt Golf Course - 200' x 200' Lump Sum $300,000 $300,000 Landscape Screening Lump Sum $15,000 $15,000 Footbridge Across Trout Stream Lump Sum $35,000 $35,000

Sidewalk 6' Wide 3,000 SF $4 $12,000

Contingency $183,000

Engineering, Survey, Permits, Testing $164,250

Total: $1,233,000

8a Batting Cages Lump Sum $30,000 $30,000

8b Maintenance Building

Building - 30' x 80' 2,400 SF $175 $420,000

Sitework Lump Sum $100,000 $100,000

Bituminous Pavement - 3" Thick 8,500 SF $2 $17,000 Landscape Plantings, Seed and Mulch Lump Sum $30,000 $30,000

Contingency $113,400

Engineering, Survey, Permits, Testing $101,600

Total: $782,000

Total Active Recreation Area: $2,045,000

9 ACTIVE RECREATION AREA - OPEN FIELD

Reconstruct Ball Field and Backstop Lump Sum $85,000 $85,000 Parking Lot - 3" Thick Bituminous, 35 Stalls 16,600 SF $2 $33,200

Concrete Wheel Stops 35 Each $70 $2,450

Parking Lot Sitework Lump Sum $20,000 $20,000 Parking Lot Striping and Signage Lump Sum $500 $500 Sidewalk - 5' Wide Concrete 1,500 SF $4 $6,000 Picnic Shelter - 30' x 30' 1 Each $65,000 $65,000 Concrete Pavement for Picnic Shelter 1,600 SF $4 $6,400 Concrete Sidewalk - 5' Wide 600 SF $4 $2,400

Picnic Tables 10 Each $600 $6,000

Grills 2 Each $600 $1,200

Landscaping Lump Sum $15,000 $15,000

Contingency $48,630

Engineering, Survey, Permits, Testing $43,220

Total: $335,000

(5)

10 GATEWAY LANDSCAPING

10a Brown Street / Randolph Street Roundabout

Pavement Removal 8,000 SF $1.50 $12,000

Bituminous Road Pavement - 5" Thick 9,000 SF $3 $27,000 Special Pavement - Crosswalks 1,100 SF $15 $22,500 Special Pavement - Perimeter Walk 2,500 SF $15 $37,500

Curb and Gutter 500 LF $20 $10,000

Road Signage Lump Sum $500 $500

Special Features/Park Signage 150 LF $500 $75,000 Landscape and Irrigation Lump Sum $20,000 $20,000

Contingency $40,900

Engineering, Survey, Permits, Testing $36,600

Total: $282,000

10b Randolph Street / High Street Intersection

Special Pavement - Crosswalks 1,400 SF $15 $21,000

Curb and Gutter 300 LF $20 $6,000

Road Signage Lump Sum $500 $500

Special Features/Park Signage 60 LF $500 $30,000

Landscape Lump Sum $10,000 $10,000

Contingency $13,500

Engineering, Survey, Permits, Testing $12,000

Total: $93,000

10c Denton Road / Kibby Road Intersection

Special Pavement - Crosswalks 700 SF $15 $10,500 Special Pavement - Sidewalks 2,000 SF $15 $30,000

Road Signage Lump Sum $500 $500

Special Features/Park Signage 100 LF $500 $50,000 Landscape and Irrigation Lump Sum $20,000 $20,000

Contingency $22,200

Engineering, Survey, Permits, Testing $19,800

Total: $153,000

10d Brown Street / Denton Road Intersection

Special Pavement - Crosswalks 1,700 SF $15 $25,500 Special Pavement - Sidewalks 3,500 SF $15 $52,500

Curb and Gutter 200 LF $20 $4,000

Fountain in Pond Lump Sum $5,000 $5,000

Road Signage Lump Sum $500 $500

Landscape and Irrigation Lump Sum $20,000 $20,000

Contingency $21,500

Engineering, Survey, Permits, Testing $19,000

Total: $148,000

Total Gateway Landscaping: $676,000

(6)

11 INTERPRETIVE / VISITORS CENTER

Building - Furnishings Not Included 5,000 SF $400 $2,000,000

Site Work Lump Sum $50,000 $50,000

Site Utilities Lump Sum $20,000 $20,000

Concrete Sidewalk/Patio 4" Thick 2,500 SF $4 $10,000 Landscape and Irrigation Lump Sum $30,000 $30,000

Benches 5 Each $1,000 $5,000

Wood Livery Platform - 60' x 40' 2,400 SF $50 $120,000 Wood Warming Hut - 20' x 20' 400 SF $75 $30,000 Bituminous Parking - 80 Angled Stalls Along Randolph 12,800 SF $2 $25,600 Parking Lot Signage and Striping Lump Sum $400 $400

Contingency $458,200

Engineering, Survey, Permits, Testing $412,800

Total: $3,162,000

12 NATURAL AREA

12a Canal and Pond Dredging (Golf Course is included) (quotation provided by Jackson County from Ripstra & Scheppleman, Inc.)

Soil Removal and Placement in Open Field Area at the Driving Range (item 4) and in Open Field Area (Item 9)

Open Ditch Excavation 5,300 LF $12 $63,600

Pond Hydraulic Dredging 95,000 CY $10 $950,000

Channel Dredging 25,400 CY $12 $304,800

Dam Replacement (Golf Course) 3 Each $25,000 $75,000 Bridge Replacement (Golf Course) 6 Each $50,000 $300,000 Topsoil, Seed, Fertilize and Mulch Lump Sum $100,000 $100,000 Erosion Control Measures Lump Sum $10,000 $10,000

Contingency $270,500

Engineering, Survey, Permits $26,100

Total: $2,100,000

12b Wetland Interpretive Opportunities

Wood Boardwalk - 8' Wide 29,200 SF $35 $1,022,000 Bituminous Path - 8' Wide 3" Thick 1,100 LF $15 $16,500 Wood Fishing/Viewing Platforms - 3 @ 40' x 25' 3,000 SF $50 $150,000

Wood Benches 15 Each $400 $6,000

Raised Foot Bridges Across Canal - 4 @ 8' x 75' long 2,400 SF $50 $120,000 Interpretive Sign Panels 20 Each $2,000 $40,000 Native Meadow Restoration - Grow Zones 5 Acres $5,000 $25,000

Contingency $275,900

Engineering, Survey, Permits, Testing $248,600

Total: $1,904,000

12c Viewing Chamber

Viewing Chamber - 15' x 15' w/Heavy Timber and

Concrete Construction with Interpretive Signage 1 Each $350,000 $350,000

Contingency $70,000

Engineering, Survey, Permits, Testing $63,000

Total: $483,000

Total Natural Area: $4,487,000

(7)

13 OPEN AREAS

Picnic Shelter - 30' x 60' 1 Each $80,000 $80,000 Concrete Pavement for Picnic Shelter - 4" Thick 2800 SF $4 $11,200 Concrete Sidewalk - 5' Wide, 4" Thick 750 SF $4 $3,000

Picnic Tables 20 Each $600 $12,000

Grills 4 Each $600 $2,400

Bituminous Pavement Parking Lot Reconstruction

Along Denton Road - 35 Angled Stalls, 3" Thick 15,600 SF $2 $31,200 Site Earthwork for Parking Lot 15600 SF $1 $15,600

Concrete Wheel Stops 35 Each $70 $2,450

Parking Striping and Signage Lump Sum $500 $500 Bituminous Path Replacement - 10' Wide, 3" Thick 500 LF $22 $11,000

Landscape Lump Sum $10,000 $10,000

Contingency $35,850

Engineering, Survey, Permits, Testing $32,800

Total: $248,000

14 CASCADES MANOR HOUSE

Gazebo - 40' Diameter 1 Each $100,000 $100,000 Formal Garden - 100' x 200' Lump Sum $100,000 $100,000

Irrigation Lump Sum $20,000 $20,000

Manor House Façade Repairs Lump Sum $75,000 $75,000

Contingency $59,000

Engineering, Survey, Permits, Testing $53,000

Total: $407,000

15 MULTI-USE PATH West of Brown Street

Bituminous Path - 10' Wide, 3" Thick 6,500 LF $22 $143,000

Earthwork for Path 6,500 LF $6 $39,000

Clearing and Grubbing - 20' Wide 600 LF $5 $3,000

Signage/Striping Lump Sum $5,000 $5,000

Fitness Trail - 16 Stations 16 Each $1,500 $24,000

Restoration Lump Sum $8,000 $8,000

Contingency $44,400

Engineering, Survey, Permits, Testing $39,600

Total: $306,000

Along Randolph Street

Bituminous Path - 10' Wide, 3" Thick 800 LF $22 $17,600

Earthwork for Path 800 LF $6 $4,800

Signage/Striping Lump Sum $1,000 $1,000

Restoration Lump Sum $1,000 $1,000

Contingency $4,880

Engineering, Survey, Permits, Testing $4,720

Total: $34,000

(8)

16 BROWN STREET IMPROVEMENTS 16a Road Improvements

Remove West 2 Lanes 42,000 SF $1.50 $63,000 Earthwork and Topsoil Restoration 800 CY $20.00 $16,000 Resurface East 2 Lanes - 1.5" Lift 42,000 SF $1.25 $52,500

Curb and Gutter 500 LF $20 $10,000

Road Signage Lump Sum $5,000 $5,000

Drainage Lump Sum $15,000 $15,000

Contingency $32,300

Engineering, Survey, Permits, Testing $29,200

Total: $223,000

16b R.O.W. Enhancements

Special Pavement in Front of Amphitheater 6,000 SF $15 $90,000 Pedestrian Crosswalks - Special Pavement 10' Wide 1,000 SF $15 $15,000 Concrete Sidewalk - 12' Wide, 6" Thick 4,560 SF $8 $36,480 Ornamental Street Lights - 80' Apart 36 Each $8,000 $288,000

Landscape Plantings and R.O.W. Irrigation Lump Sum 150,000 $150,000

Contingency $115,900

Engineering, Survey, Permits, Testing $103,620

Total: $799,000

Total Brown Street Improvements $1,022,000

GRAND TOTAL $29,498,000

References

Related documents

Based on the results of this study, steepest corneal curvature in keratoconus and postoperative LASIK ectasia changed with 95% confi dence when the difference between a single

The objective of the following paper is to compare full scale lift and drag flight test data to other comparable models, including a numerical RANS CFD model, an empirical model

Assistive technology devices and/or services are essential factors in meeting the educational needs of students with speech-language disabilities and must be considered for

15 Patients with higher ischemic stroke risk (CHA 2 DS 2 -VASc ≥ 2) have 25% less probability to receive dabigatran or rivaroxaban, compared with warfarin,

Analogous to traffic normal- ization for network intrusion detection systems, the proposed RouteNormalizer patches ambiguities and eliminates seman- tically incorrect routing updates

i) To evaluate the suitability of mediated electrochemical analysis to address microbial pathways of NOM redox cycling in the future. ii) To develop a bioassay for nitrite removal

Establishing a feminine tradition of Afro American writing, the one that subverted the phallogocentric structure of language which is particularly designed to

Least squares adjusted means were used to describe associations between the measures of physical activity, and the PCS and MCS scores for neighbourhood measures of (i) active living