REQUEST FOR PROPOSAL

For

Outsourcing of IT Service Desk and

Desktop Support Services along with standards Service

Desk Tool based on ITIL guidelines

RFP # no.: 06/IT / Services/HAAD/PT/2010

Bid issue date: March 10, 2010

Deadline for submission of proposals: March 31, 2010

(2)

INDEX

Contents of the Request for Proposals ... 4

Definitions and Abbreviations: ... 5

Section A – Instruction to Bidders ... 6

ARTICLE 1‐ TENDER PROCESS DEADLINES ... 6

ARTICLE 2 ‐ PACKING AND LABELLING OF PROPOSALS ... 6

ARTICLE 3 ‐ SUBMISSION OF PROPOSALS ... 6

ARTICLE 4 ‐ PROPOSAL CONTENTS ... 7

A. TECHNICAL OFFER ... 7

B. FINANCIAL OFFER ... 8

ARTICLE 5 ‐ BID BOND ... 8

ARTICLE 6 ‐ RFP TERMS AND CONDITIONS ... 8

ARTICLE 7 ‐ VALIDITY OF PROPOSAL ... 8

ARTICLE 8 ‐ INCOMPLETE AND LATE OFFERS: ... 8

ARTICLE 9 ‐ INQUIRIES ... 8

ARTICLE 10 ‐ ALTERATION OF PROPOSALS ... 9

ARTICLE 11 ‐ ELIGIBLE BIDDERS ... 9

ARTICLE 12 ‐ PROOF OF NON‐PROFIT STATUS ... 9

ARTICLE 13 ‐ COSTS FOR PREPARING PROPOSALS ... 9

ARTICLE 14 ‐ CLARIFICATION ... 9

ARTICLE 15 ‐ EVALUATION OF PROPOSALS ... 9

C. TECHNICAL EVALUATION OF BIDS ... 10

D. EVALUATION OF FINANCIAL OFFERS ... 10

ARTICLE 16 ‐ AMENDMENTS ... 10

ARTICLE 17 ‐ CONFIDENTIALITY ... 10

ARTICLE 18 ‐ OWNERSHIP OF PROPOSALS ... 10

ARTICLE 19 ‐ BID CANCELLATION ... 10

ARTICLE 20 ‐ DISCUSSION/NEGOTIATION ... 10

ARTICLE 21 ‐ AWARD ... 10

Section B – Terms of References ... 11

ARTICLE 1 ‐ GENERAL BACKGROUND AND HAAD OBJECTIVES ... 11

ARTICLE 2 ‐ SPECIFIC BACKGROUND OF IT IN HAAD ... 12

ARTICLE 3 ‐ PURPOSE AND OBJECTIVES OF THE RFP ... 12

ARTICLE 4 ‐ SCOPE OF WORK & TECHNICAL REQUIREMENTS ... 13

ARTICLE 5 ‐ PERIOD OF PROJECT EXECUTION ... 26

ARTICLE 6 ‐ REQUIREMENTS... 26

A. PERSONNEL /KEY EXPERTS ... 26

B. EQUIPMENT / FACILITIES ... 26

ARTICLE 7 ‐ DELIVERABLES ... 27

Section C – Draft Contract Agreement and Conditions ... 28

ARTICLE 1 ‐ SUBJECT ... 28

ARTICLE 2 ‐ STRUCTURE OF THE CONTRACT ... 28

ARTICLE 3 ‐ CONTRACT VALUE ... 28

ARTICLE 4 ‐ COMMENCEMENT DATE ... 28

ARTICLE 5 ‐ PERSONNEL ... 28

ARTICLE 6 ‐ INFORMATION TO BE PROVIDED TO THE VENDOR ... 29

ARTICLE 7 ‐ REPORTING ... 29

ARTICLE 8 ‐ INVOICES ... 29

ARTICLE 9 ‐ CONTRACT PRICE ... 30

ARTICLE 10 ‐ CONTACT ADDRESSES ... 30

ARTICLE 11 ‐ PERFORMANCE BOND ... 30

(3)

ARTICLE 13 ‐ NON‐ASSIGNMENT ... 31

ARTICLE 14 ‐ CONTRACTING AUTHORITY ACKNOWLEDGEMENT ... 31

ARTICLE 15 ‐ PENALTIES ... 31

ARTICLE 16 ‐ CONFIDENTIALITY ... 32

ARTICLE 17 ‐ TAXES ... 33

ARTICLE 18 ‐ TERMINATION ... 33

ARTICLE 19‐ GOVERNING LAW AND LANGUAGE ... 33

ARTICLE 20 ‐ ENTIRE AGREEMENT ... 33

ARTICLE 21 ‐ DISPUTE SETTLEMENT ... 34

(4)

Contents of

the Request for Proposals

The complete Request for Proposals shall include the following: Section A: Instructions to Bidders

Section B: Terms of Reference (Technical requirements/ Scope of Work) Section C: Draft Contract Agreement and Conditions

Annexes:

(5)

Definitions and Abbreviations:

The terms used in this RFP and the subsequent contract shall have the following meanings: Bidder A legal entity entitled to submit a proposal in response to this bid

Vendor /OSP The awarded bidder selected to perform the project’s scope of work

Contracting Authority/HAAD Health Authority – Abu Dhabi Days/months/years Calendar days/ months/years

Project Outsourcing of IT Service Desk and Desktop Support Services along with standards Service Desk Tool based on ITIL guidelines.

Government Government of Abu Dhabi

N/A Not applicable

RFP Request For Proposals

ToR Terms of Reference

ADSCIC Abu Dhabi Systems &Information Centre

ITSM Information Technology Service Management

OSP Outsourced Service Provider

WO Work Order

ITS Information Technology Section

SLA Service Level Agreement

(6)

Section A – Instruction to Bidders

In submitting proposals, bidders must comply with all instructions contained in this RfP document. Failure to submit a proposal containing all the specified information and documentation (incl. All completed forms and templates, and a declaration that all the specified ToR will be accepted) within the stated submission deadline will lead to rejection of the proposal.

Article 1 - Tender Process Deadlines

Deadline for requesting clarifications from the HAAD March 28,2010

Last date for issuing clarifications by the HAAD March 30,2010

Clarification Meeting N/A

Deadline for submission of proposals March 31,2010

Article 2 - Packing and Labelling of Proposals

Each submitted proposal must comprise a technical offer and a financial offer, each of which must be submitted separately. Each technical offer and financial offer must contain one original, clearly marked "Original", and 2 copies, each marked "Copy".

Article 3 - Submission of Proposals

Proposals must be submitted either by recorded delivery (official postal service) or hand delivery directly to the HAAD in return for a signed and dated receipt to the following address:

To: Mr. Ali Al Mazrouie

Head, Corporate Support Services Att.: Mr. Moinudeen Zayed

Procurement Officer

Procurement & General Services- Section Health Authority – Abu Dhabi

Airport Road – behind Al Futtaim Motors Agency P.O. Box 5674

2nd floor

Note: Proposals submitted by any other means (i.e, fax or e-mail) will be rejected. Any deviation from these instructions (e.g., unsealed envelopes or references to price in the technical offer) is to be considered a breach of the rules, and will lead to rejection of the proposal.

The outer envelope should carry the following information:

a) The address for submission of proposal indicated above;

b) The reference code of the bid to which the bidder is responding (06/ Service/HAAD/PT/2010)

c) The name of the bidder.

(7)

Article 4 -

Proposal Contents

A. Technical offer

The Technical offer must include the following documents:

y *Letter of Submission on Vendor’s letterhead signed and stamped by the person in charge or the Vendor’s authorized representative acknowledging the Vendor’s agreement to the terms and conditions of this RFP and certifying that all information offered in the submitted proposal are true, accurate, and complete.

y Full contact details of the key person in the company in case of any clarification requirements.

y Table of Contents, including page numbers.

y *An executive summary section should contain a summary of the vendor’s proposal written for non‐technical personnel. The summary should define: o the overall services offering including the proposed services

approach/strategy, manpower resourcing, deliverables, service level agreements (SLAs) and associated support services.

o State the number of offered on‐site ( at HAAD main building) and off‐ site resources to cover and provide the services required herein Section‐ B of this RfP

o explain how the proposed services offering is geared to address HAAD’s operational business requirements and objectives.

y Audited Financial Statements for the past one year.

y The bidder should have a minimum of three years experience in UAE Market y Copy of valid trade license/ Legal registration documents

y *Business references the overall services experience of the vendor, including customer references for services delivery of a similar nature and volume in the UAE that verify that the bidder has a satisfactory performance record and demonstrate that the bidder has the capability of meeting the project requirements. The references should specify the bidder’s relevant contribution to each listed project. References can only be considered if the bidder clearly lists a point of contact in the client organization for that project (name, address, telephone number, etc.).

y *Bidder’s Staff organisation chart.

y *Detailed CVs for the key experts and project’s staff incl. their language capabilities, their employment status with the bidder, and their legal status (current right to work in the UAE).

y *Bid Bond

*Note: After the bid opening and in case bidder did not submit the required documents stated above, the proposal will be administratively rejected without further consideration for review and evaluation.

(8)

B.

Financial offer

The Financial offer should be quoted in U.A.E currency (AED), inclusive of all costs and all applicable tariffs and /or taxes.

The Bidder should quote his prices clearly stating the total amount “not to exceed basis” per annum for providing the required services as per the RFP requirements stated in Section B showing a breakdown of the fee structure (i.e. :This should show the monthly charges to be paid to the Vendor and the rates of the proposed Vendor’s staff, including all levels. etc).

Important Notes to bidders in preparing the financial offer:

A. It is bidder’s responsibility to examine and consider all the RfP requirements while preparing the financial proposals and the offered off‐site and on site resources for providing the services requested in Section B‐ herein.

B. Bidders should quote the prices including all anticipated costs (i.e: accommodation, travels expenses.. etc)

C. Bidders should provide the financial offer in two options as follows:

1- Option 1: State the financial offer for providing the services requested herein Section B‐ daily from 7 am to 4 pm, Sunday through Thursday

2- Option 2: State the financial offer if providing the services requested herein Section B‐ at the round 7 days/24 hours .

D. Bidders should quote there prices per annum showing the monthly costs and break down for the monthly rate/per dedicated staff to the contract implementation.

Article 5 - Bid Bond

The bidder must submit a bid bond with an amount of 60,000 AED(Sixty Thousands Dirham) enclosed in the technical proposal. The bond shall be unconditional, valid for 120 days starting from the closing date of proposal submission and addressed to the Health Authority – Abu Dhabi. Bid Bonds must be issued from one of the UAE banks. The bid bond will be returned back to bidders after the evaluation and awarding processes are completed.

Article 6 - RFP Terms and Conditions

Failure to meet the specified terms and conditions of this RFP at the time of award will result in disqualification of the Bidder.

Article 7 - Validity of Proposal

Proposals must remain valid and open for the acceptance of the HAAD for 120 days from the RFP closing date. Proposals specifying a shorter acceptance period will be rejected.

Article 8 - Incomplete and Late Offers:

Incomplete and late proposals will not be accepted. It is the bidder’s responsibility to ensure that the proposal is submitted complete, on time and in accordance with the RFP terms and conditions. Late proposals shall be returned to Bidders unopened.

Article 9 - Inquiries

Bidders may submit questions in writing either through fax or e‐mail to the following address and before the deadline stated in the table of tender deadlines (Article 1/ Section A).

(9)

Contact name : Ms. Dina Mohsen Khaled Procurement Officer

Address : Health Authority – Abu Dhabi Fax no. : +9712 4496969

E‐mail : dkhaled@haad.ae

Any clarification issued by the HAAD will be communicated in writing to all the bidders before date stated in the table above. No further clarifications will be given after the stated date.

Note: Any clarification issued by HAAD will be communicated in writing to all the bidders & will be published on HAAD website: www.haad.ae .

Any prospective bidders seeking to arrange individual meetings with HAAD or any of its employees concerning this contract during the bidding period may be excluded from the bidding procedure.

Article 10 - Alteration of Proposals

Bidders may alter their proposals by written notification prior to the deadline for submission of proposals stated in this RFP. No proposals may be altered after this deadline.

[

Article 11 - Eligible Bidders

Bidders considered eligible to submit proposals are defined as the entity /organisation that is legally registered in the UAE to do business and can provide a valid certificate of legal registration/ trade registration license.

Article 12 - Proof of Non-profit Status

Bidders claiming non‐profit status must provide certification from the registering body with their proposals.

Article 13 - Costs for preparing proposals

Under no circumstances will the HAAD accept liability for any costs incurred in connection to the preparation and submission of proposals even if the HAAD decides to reject all the proposals or cancel the tender altogether.

Article 14 - Clarification

During the evaluation process, the HAAD may request additional information from bidders with regard to the submitted proposal if deemed necessary by the tender evaluation committee.

Article 15 - Evaluation of proposals

The evaluation process will identify and recommend the proposal which is technically superior at reasonable price.

• The weight of the technical factors = 70 % • The weight of the cost = 30 %

Only proposals with average scores of at least 70 points in the technical evaluation criteria set out at Annex I qualify for the financial evaluation.

(10)

C. Technical evaluation of bids

The technical quality of each bid will be evaluated in accordance with the evaluation criteria specified in Annex I of this RfP document. No other award criteria will be used. The award criteria will be examined in accordance with the requirements indicated in this RfP.

D. Evaluation of financial offers

Upon completion of the technical evaluation, the financial offers of those bidders who passed the technical evaluation stage will be opened.

Article 16 - Amendments

During the proposal submission period, if the HAAD decides to modify/ change any requirement/s of the RfP, [the modification/s shall be released through the issuance of an amendment to the RfP.] Any amendment will be issued in writing and will be sent to all bidders.

Article 17 - Confidentiality

The entire evaluation procedure is confidential and all proposals are for official use only and may be communicated neither to the bidders nor to any party other than the HAAD.

Article 18 - Ownership of Proposals

The HAAD retains ownership of all proposals received as part of this tender. Consequently, bidders have no legal right to have their proposals returned to them.

Article 19 - Bid Cancellation

The HAAD has the right at any stage in the bidding process to cancel the whole bid without justification to any of the bidders. In the event, Bidders will be notified in writing of the cancellation by the HAAD.

Article 20 - Discussion/Negotiation

HAAD may initiate discussions should clarification or negotiation be necessary. Bidders should be prepared to provide qualified personnel to discuss technical and contractual aspects of the proposal.

Article 21 - Award

HAAD reserves the option of contracting only for a portion of the specified project scope or of not awarding a contract to any bidder. Final approval to enter into a contract, and the scope of services to be provided pursuant to the contract, rests with HAAD. A contract may be awarded to more than one bidder based on the quality of the proposals and HAAD’s needs.

(11)

Section B – Terms of References Article 1 - General background and HAAD objectives

Health Authority ‐ Abu Dhabi (HAAD) is a Government Authority for the Emirate of Abu Dhabi with the mandate to regulate the delivery of healthcare services for the residents of the Emirate of AbuDhabi.

The primary functions of HAAD are:

• Enhance the quality of the healthcare services, within the Emirate of Abu Dhabi and to develop policies, standards, strategic plans, capacities and service levels;

• Establish and enforce regulations governing all aspects of healthcare provisioning for public and private healthcare facilities through the process of licensing and inspection;

• Issue licenses to all healthcare professionals wishing to practice in the Emirate through credentialing and examination process;

• Regulate the relationship between health insurance providers, healthcare facilities and patients;

• Regulate scope of services, premiums & reimbursement rates of providers and payor

• Determine eligibility, and arrange, for U.A.E. national patients to obtain medical treatment abroad.

Please visit www.haad.ae to understand more about the activities at HAAD.

In order to achieve above mentioned primary functions HAAD has adopted the following strategic directions:

ƒ Providing access to affordable healthcare to everyone in the Emirate of Abu Dhabi through the introduction of mandatory health insurance

ƒ Ensuring healthcare providers achieve world‐class outcomes

ƒ Maximizing patient safety with respect to all healthcare services and building patient trust in health system through systematic implementation of standards in both the public and private sectors, inspection against and enforcement of these standards, as well as through promoting participation in established international quality accreditation programs

ƒ Expanding medical teaching and training capacities, as well as increasing the number of staff with international qualifications at all levels in the health system

ƒ Enabling informed patient choice of healthcare providers based on transparent outcomes data and systematically measured customer satisfaction

ƒ Promoting effective steering of patients through the system and efficient use of resources

ƒ Promoting health awareness and healthy behaviors through increased screening for diseases, health awareness campaigns, vaccination programs, and other preventative initiatives

ƒ Ensuring that the Emirate of Abu Dhabi’s health system is prepared for all foreseeable emergency & disaster scenarios

(12)

Article 2 - Specific background of IT in HAAD

HAAD depends a great deal on Information Technology solutions & services for desktop office automation as well as core business applications to manage its business operations. The IT infrastructure currently in place consists of a full‐fledged Data Center that connects all HAAD locations and offices, and serves the business needs of its employees, customers, associated business and government entities and the healthcare ecosystem at large.

The IT Section (ITS) is one of the support services of the HAAD, with the responsibility to build and manage:

1. A comprehensive suite of business information systems. 2. A comprehensive suite of e‐government services.

3. Underlying network computing systems, personal computing systems and support services.

In line with the HAAD strategy and with the objective of maximizing focus on core services and maximizing the efficiency and effectiveness of support services; the IT department plans to outsource the functions of IT service desk integrated with Call Center and IT desktop support.

ITS, manages IT requirements of HAAD which consists of selection of Information Technology solutions as well as Deployment and Maintenance of IT Infrastructure and Applications in lines with HAAD’s business objectives. The IT Infrastructure comprises of Desktops & Laptops, Printers & Scanners, Servers, Storage, Network & Security devices and related software components.

In this context, HAAD is inviting leading IT Service Providers (OSP) to submit proposals for the provision of the IT services as specified in this Request for Proposal (RFP).

2.

Article 3 - Purpose and Objectives of the RfP

• Strategic focus: Off‐loading of non‐strategic (commodity) IT processes and services to enable focus on strategic processes and initiatives.

• Service improvement: Improve efficiency and effectiveness of IT services leveraging the skills & capabilities of professional vendors.

• Service flexibility: Use flexible sourcing models that will enable the IT department to effectively cope with rapid growth in its products, services and client base.

• Cost reduction and cost transparency.

• Remediation of current service issues and improvement of user satisfaction levels.

• Enhance User Productivity, Knowledge & Awareness. • Streamline Vendor Coordination for Warranty Support.

(13)

Article 4 - SCOPE OF WORK & Technical Requirements

Work and Technical Requirements

A. Organizational perspective

From an organizational perspective, outsourcing includes following functional services that part of the IT organization (IT Services); these are:

1. The Helpdesk

2. The Desktop Support

3. Telecom Support (User side) 4. IT Asset Management (User side)

The desktop support provides a wide range of technical services for end users on the site, remotely and over the phone. Following is a list for the key roles and responsibilities:

• Preparation of new PCs/notebook computers for deployment, including the unpacking, installation of the operating system, installation of applications and clients as per the user requirements, settings of operating system, user profiles, & PC BIOS parameters as per HAAD policies.

• Onsite installation of new PCs and locally attached peripherals such as printers, image scanners. The installation includes site readiness inspection to verify availability of proper desktop, power outlets, & network outlets.

• Installation of additional applications as per user’s requirements such as HAAD Business applications, Acrobat reader, etc.

• Preparation and onsite installation of Networked printers that will serve HAAD Business Applications users.

• Preparation and onsite installation of Printers for some users.

• Inspecting and troubleshooting the Time attendance recording devices distributed across all sites.

• Upgrade of PC hardware as required such as increase of memory or hard disk size.

• Upgrade of operating systems and applications such as Windows XP to Windows 7 and Office XP to Office 2007/2010.

• Troubleshooting of hardware and software for PCs & Peripherals.

• Recovery (If possible) of lost user’s data caused by hardware or software failures and user errors.

• Relocation of PCs & Peripherals as required by users.

• Configuring user data backup mechanisms as required by users.

• Configuration and fine‐tuning of existing applications on PCs such as internet browsers and office automation application settings.

Helpdesk staff located at the HAAD headquarters must assume the following key roles and responsibilities:

• Receive incident reports from Users via telephone or email

• Perform incident classification, prioritization, correlation with other reported incidents and matching against known errors

(14)

• Record all required incident details on the incident management system • Link the incident record to the User ID and configurations

• First level support to attempt to resolve the incident, use remote control if necessary for incident resolution

• If the incident requires escalation to level 2 support, the helpdesk staff create a work order on Service Desk and assign it to the appropriate level 2 technician / engineer

• Track the incident until closure and keep the User up to date with the incident status

• Functional escalation in case the incident resolution times exceed the agreed service levels

• Selective quality checks on closed incidents & service requests

• Receive service requests forms that have passed the business assessment and approval procedures

• Link the service request record to the User ID and configurations

• Forward the service request to the proper IT technician / engineer, in accordance with the service request procedures

• Track the service request until closure and keep the User up to date with the status

• Functional escalation in case the service request completion times exceed the agreed service levels

• Notify Users about major system/network outages. In most cases, the outage notification template is filled by IT operations or applications teams then emailed by the Service Desk staff to the appropriate distribution list

The current estimated inventory of Desktops & Peripherals includes the following: Desktops/Laptops: Approx. 500

Printers: Approx. 80 IP Phones: Approx. 400

B. Systems perspective

From a systems perspective the breakdown of support responsibilities is as follow: End-user systems - Support outsourced to OSP

• Desktop computers • Notebook computers • Desktop printers • Scanners

• USB attached desktop devices

• Other desktop peripherals like barcode readers, special purpose serial printers • Desktop operating systems

• Desktop applications (MS Office, MS Project etc)

• Desktop utilities (Internet Explorer, Adobe Acrobat, Macromedia Flash, etc.) • Desktop virus defense

(15)

• Network printers

• Desktop management systems and tools o Incident

o Problem o Configuration

o Software distribution o Remote Control

o Cloning and OS deployment

C. Process perspective

From a process perspective, the OSP will handle a variety of support related responsibilities that fall under 11 process domains:

1. Incident management

2. Service request management 3. Problem management

4. Desktop operations management 5. Change management

6. Configuration management

7. User (IT user) relations management 8. Vendor relations management

9. Service level management 10. People management 11. Platform management

D. Tools & Resource perspective

• OSP must setup a Call Center with sufficient telephone lines and be integrated with Service desk system for quality review & exhaustive reporting facilities.

• This Call Center along with respective Service desk engineers must be located at OSP’s office.

• OSP shall ensure to deploy an integrated suite of Desktop Management, Desktop Security, ITIL compliant Service desk system and Asset management system along with required Hardware & Software.

• All these Hardware & Software Tools must be with sufficient legal licenses, renewed at respective periods and transferrable to HAAD as and when required. • All Manpower resources shall be qualified Electronics/Computer engineers and

trained and experienced with ITIL processes for service delivery management. • The Team leaders and / or Managers allocated shall be ITIL certified.

• Manpower resources proposed must be a mix of English & Arabic speaking skill sets.

• Transportation facility with Vehicles, Drivers and office boys for regular Desktops & Peripherals shifting between locations.

• Engineers must be equipped with Comprehensive IT Tool kits along with Mobile phones & Car with Valid UAE driving License.

(16)

As part of these Tools & Resources, OSP must provide following minimum reports on Daily, Weekly & monthly basis:

• Overall Incident Summary reports.

• Incidents Summary reports location wise. • Call Documentation reports.

• Call Capture reports.

• Average Call Answer time reports. • Maximum Time to respond reports. • First Call Resolution reports.

• Overall Work Orders Summary reports. • Work Orders Summary reports location wise. • Work orders response time reports.

• Work orders Resolution time reports. • Service Requests Response time reports. • Service Requests Completion reports. • IT Assets recording reports.

• Assets recording (New & updates) time reports. • Periodic IT Assets Audit reports.

The responsibility matrix below outlines HAAD view for the process responsibilities at the time of preparing the RFP. This responsibility matrix is not rigid and will be subject to change during the negotiations with the selected OSP.

Responsibility matrix of services from process perspective

Service / Task Responsible Party

OSP HAAD IT Both

1- Incident Management

Level 0 / 1 incident management 9

Level 2/3 incident management (End‐User Systems)

9 Level 2 / 3 incident management (Network

Systems

9 User point of contact for incident status updates 9

Known error documentation (End‐User Systems and telecom devices)

9

Known error documentation (Network Systems) 9 Daily ,weekly and monthly incident reporting 9

Establish and maintain incident management policies and procedures

9 2- Service Request Management

Business assessment and approval 9

Recording and tracking of service requests on service request system

9 Hardware and software procurement (Internal

purchase requisition, Purchase Order, Tender,

(17)

Service / Task Responsible Party

OSP HAAD IT Both

Summary of Quotation, Petty Cash, etc.) User point of contact for service request status updates

9 Provision of service (End‐User Systems and

telecom devices)

9

Provision of service (Network Systems) 9

Establish and maintain incident management policies and procedures

9 3- Problem management

Problem recording and administration (End‐User Systems)

9 Problem investigation and resolution (End‐User

Systems)

9 Problem recording and administration (Network

Systems)

9 Problem investigation and resolution (Network

Systems)

9 Establish and maintain problem management

policies and procedures

9 4-Desktop operations management

Installation and configuration of End‐User systems and telecom devices : Desktops

/Printers/ network Printers/scanners/barcode scanners/ Telephones (digital, IP, wireless IP)/Fax machines

9

Preparation and annual desktop upgrade plan 9

Implementation of annual desktop upgrade plan up to 100 Desktops

9 Packaging and deployment of new software

releases

9 Packing and deployment of patches and hot‐ fixes (OS, security and application)

9 Preventive and routine maintenance (End –User

system)

9 5- Change Management

Submit RfC (Request for Change) 9

Assess RfC 9

Approve / Disapprove RfC 9

Implement Changes (End‐User systems) 9

Implement Changes (Network systems) 9

Establish and maintain change management policies and procedures

9 6- Configuration Management

Record all inventory and configuration items in the configuration management database (End‐ User Systems)

(18)

Service / Task Responsible Party

OSP HAAD IT Both

Continuous update of inventory and configuration management records (End‐User Systems)

9 Record all inventory and configuration items in

the configuration management database (Network Systems)

9

Continuous update of inventory and configuration management records (Network Systems)

9 Perform routine inventory and configuration

audits

9 Perform periodic inventory and configuration audits 9 Reconciliation of inventory and configuration

database

9 Periodic and on demand exports from the

configuration management database to the asset management system

9

Monitor software license utilization (End‐User Systems)

9 Monitor software license utilization (Network

Systems)

9 Establish and maintain configuration

management policies and procedures

9 7- User (HAAD User) Relationship

Management

Point of contact for incident and service request status updates

9

Create outage notifications 9

Outage notification broadcast 9

Point of contact for User complaints and suggestions

9

Measure User satisfaction 9

User account management 9

8- Vendor Relations Management

Liaison of vendor support (End‐User Systems) 9

Liaison of vendor support (Network Systems 9

Liaison of procurement activities 9

Vendor issue management 9

9- Service Level Management

Set service level metrics and objectives 9

Record service level exceptions (end‐User System and telecom devices)

9 Record service level exceptions (Network

System)

9 Service level reporting (End‐User Systems and

telecom devices)

9

Service level reporting (Network Systems) 9 Service level audits and spot checks 9

(19)

Service / Task Responsible Party

OSP HAAD IT Both

Activate service level exceptions terms and conditions (including penalty clauses)

9

Conduct periodic SLA performance reviews 9

Establish and maintain service level management policies and procedures

9 10 - People Management

Provide Service Desk technicians 9

Provide Desktop /Telecom Support technicians 9 Service Desk and Technical Support staff training

and development

9 Provide Service Desk & Technical Support manager 9

Provide Overall Program Manager 9

Provide configuration officer 9

Provide change and release manager 9

Provide OSP relations manager 9

11- Platform Management

Acquire incident information system 9 Implement incident information system 9 Operate incident information system 9 Acquire problem information system 9 Implement problem information system 9 Operate problem information system 9 Acquire configuration information system 9 Implement configuration information system 9 Operate configuration information system 9 Acquire change management information system 9 Implement change management information

system

9 Operate change management information system 9 Acquire software distribution system 9 Implement software distribution system 9 Operate software distribution system 9

Acquire remote control system 9

Implement remote control system 9

Operate remote control system 9

Acquire Imaging and PC deployment system 9 Implement Imaging and PC deployment system 9 Operate Imaging and PC deployment system 9 Acquire software license monitoring system 9 Implement software license metering system 9 Operate software license metering system 9 Acquire Hardware/Software Inventory system 9 Implement Hardware/Software Inventory system 9 Operate Hardware/Software Inventory system 9 Acquire Desktop Power management system 9 Implement Desktop Power management system 9

(20)

Service / Task Responsible Party

OSP HAAD IT Both

Operate Desktop Power management system 9 Acquire Comprehensive Desktop Security system

(Patch, Device Blocking, Vulnerability

Assessment, Anti Spyware, Application Blocking)

9

Implement Comprehensive Desktop Security system

9 Operate Comprehensive Desktop Security system 9 Acquire Service Desk Call Management System 9 Implement Service Desk Call Management System 9 Operate Service Desk Call Management System 9 Acquire Call Center & IVR system 9 Implement Call Center & IVR system 9 Operate Call Center & IVR system 9 E. Service Level Metrics / Terms

HAAD IT aims for SLA based provision of services. The list of SLA metrics and terms below outlines HAAD view at the time of preparing the RFP.

Target Service Levels

Service / Task Target Service Level

1- Incident Management Level 0 / 1 incident

management • Coverage hours from 7 am to 4 pm, Sunday through Thursday • 100% incidents are recorded on the

incident information system • Adherence with HAAD incident

management policies, procedures and standards

• 98 % call capture

• Average response time to a call = 10 Sec

• Max time to respond to a call = 25 Sec • 50 % Level 1 (first call) incident

resolution

• 90 % User satisfaction

(21)

Level 2/3 incident management

(End‐User Systems) • Coverage hours as per specified above • Work Order response times according to priority

A = 15 Min B = 1 Hours C = 4 Hours

D = 8 Hours

• PC, printer, scanner or telecom device (repair or replace time) according to priority A = 2 Hours B = 4 Hours C = 24 Hours D = 48 Hours • 90 % User satisfaction User point of contact for

incident status updates • incident status update within 15 min • User notification by e‐mail upon resolution

Daily incident reporting • Call statistics : ‐Total no. of calls ‐No. of unattended calls

• Incident statistics :

- Total No. of Incidents - Closed Incidents - No. of created WO - No. of open WO - No. of closed WO 2- Service Request Management

Recording and tracking of service requests on service request system

• 100 % service requests are recorded on the service request information system • Adherence with HAAD service request

policies, procedures and standards User point of contact for service

request status updates • incident status update within 15 min • User notification by e‐mail upon service delivery completion

3- Problem management Problem recording and administration (End‐User Systems and telecom devices )

• 100 % Problem capture

• Adherence with HAAD problem management policies and procedures Problem investigation and

resolution (End‐User Systems and telecom devices)

• 100 % Problem resolution

4- Change Management

Implement Changes • Only approved changes are implemented

(22)

Record all inventory and configuration items in the configuration management database (End‐User Systems)

• 100% items shall be recoded into the configuration databases

• 98% accuracy of inventory • Max time to record new item= 24

Hours

• Adherence with HAAD configuration management policies, procedures and standards

Continuous update of inventory and configuration management records (End‐User Systems and telecom devices)

• All items shall be updated using manual or automated procedures • Max. time to update the record of a

changed item=48 Hours Record all inventory and

configuration items related to new projects in the

configuration management database (End‐User Systems)

• Max. time to record new item= 2 days after getting project completion report with asset details.

• Adherence with HAAD configuration management policies, procedures and standards

Perform routine inventory and

configuration audits • Inventory audits every 6 months • Audit reports to HAAD Periodic and on demand

exports from the configuration management database to the asset management system

• Every 6 months

6- User (HAAD User) Relationship Management

Measure User satisfaction • 90 % User satisfaction 7- Vendor Relations

Management

Liaison of vendor support (End‐

User Systems) • Document all vendor support requests • Report vendor delays incidents to HAAD IT instantly

• Report every 6 months about overall vendors warranty commitment issues to HAAD IT

8- Service Level Management Service level reporting (End‐ User Systems and telecom devices)

• Weekly online reports

• Monthly detailed reports generation & submission

Conduct periodic SLA

performance reviews • Monthly SLA Performance review meeting 9 - People Management

(23)

Provide Service Desk

technicians • OSP staff should pass HAAD interview • OSP commit to provide at least 60% of Arabic language speakers agents • Staff replacement in case of persistent

poor performance

• Adherence with HAAD HR (Code of Conduct) and Information Security policies and procedures

Provide Desktop Support

Technicians • OSP involved staff should pass HAAD interview • Staff replacement in case of persistent

poor performance

• Adherence with HAAD HR (Code of Conduct) and Information Security policies and procedures

Provide Service Desk/Technical Support Manager and Overall Program Manager

• ITIL certified

• 5 years management experience • Replacement in case of persistent poor

performance

• Adherence with HAAD HR (Code of Conduct) and Information Security policies and procedures

Provide configuration officer &

Service request officer • Experience in config. Management & handling Service requests. • Replacement in case of persistent poor

performance

• Adherence with HAAD HR (Code of Conduct) and Information Security policies and procedures

10- Platform Management Acquire incident information

system HAAD acceptance

Implement incident information

system HAAD acceptance

Operate incident information

system HAAD acceptance

Acquire problem information

system HAAD acceptance

Implement problem

information system HAAD acceptance Operate problem information

system HAAD acceptance Acquire configuration information system HAAD acceptance Implement configuration information system HAAD acceptance Operate configuration

(24)

Acquire change management

information system HAAD acceptance Implement change management

information system HAAD acceptance Operate change management

information system HAAD acceptance Acquire service level

management system HAAD acceptance

Implement service level

management system HAAD acceptance

Operate service level

management system HAAD acceptance

Acquire software distribution

system HAAD acceptance

Implement software

distribution system HAAD acceptance Operate software distribution

system HAAD acceptance

Acquire remote control system HAAD acceptance Implement remote control

system

HAAD acceptance Operate remote control system HAAD acceptance Acquire cloning and PC

deployment system HAAD acceptance

Implement cloning and PC

deployment system HAAD acceptance

Operate cloning and PC

deployment system HAAD acceptance

Acquire software license

monitoring system HAAD acceptance

Implement software license

monitoring system HAAD acceptance

Operate software license

monitoring system HAAD acceptance

Acquire Comprehensive

Desktop Security system HAAD acceptance Implement Comprehensive

Desktop Security system HAAD acceptance Operate Comprehensive

Desktop Security system HAAD acceptance Acquire Service Desk Call

Management System HAAD acceptance Implement Service Desk Call

Management System HAAD acceptance Acquire Imaging and PC

deployment system HAAD acceptance

Implement Imaging and PC

(25)

F. HAAD Site Details

Following table provided approximate number of Desktops Laptops at respective HAAD locations:

Site No of Desktops/Laptops

HAAD Headquarters 300

IPC Office (Najda street) 50

Zayed Herbal Center (Near Mafraq) 30

Al Ain 50

Mortuary (Al Ain) 3

Mortuary (AD) 3

Madinat Zayed 5

Silla 3

Delma 3

Gayathi 3

Operate Imaging and PC

deployment system HAAD acceptance

Acquire software license

monitoring system HAAD acceptance

Implement software license

metering system HAAD acceptance

Operate software license

metering system HAAD acceptance

Acquire Hardware/Software

Inventory system HAAD acceptance

Implement Hardware/Software

Inventory system HAAD acceptance

Operate Hardware/Software

Inventory system HAAD acceptance

Acquire Desktop Power

management system HAAD acceptance

Implement Desktop Power

management system HAAD acceptance

Operate Desktop Power

management system HAAD acceptance

Acquire Comprehensive

Desktop Security system (Patch, Device Blocking, Vulnerability Assessment, Anti Spyware, Application Blocking)

HAAD acceptance

Implement Comprehensive

Desktop Security system HAAD acceptance Operate Comprehensive

(26)

G. Estimated Hardware Installations During 2010

Category installationsNo of new

Desktop computers 80

Notebook computers 15

Printers 20

Scanners 10

Other Peripherals 5

H. Helpdesk & Desktop Support Staff

Site Number of support staff

HO 2

Other sites 2

I. Helpdesk Statistics 2009 (Estimation)

Average monthly helpdesk calls (actual may vary up to 20%) 1100

Average monthly calls escalated to level 2/3 support (actual

may vary up to 20%) 600

% level 1 call resolution 50%

New software and hardware requisitions 5%

Article 5 - Period of project execution

The period of execution of the whole project will be for two years from signing the Agreement with HAAD to be renewable for one more year with same terms and conditions based on the performance of the Vendor and HAAD sole discretion

Bidders should submit a detailed time schedule for the project implementation period and it phases.

Article 6 - Requirements

A. Personnel /Key experts

Bidder should have appropriate and capable staff with qualifications and experience as follows:‐

A minimum of four years experience in setting up the IT helpdesk along with technical support based on ITIL best practices guideline, within the UAE

Staff with minimum of two years experience in the field of help desk and technical support.

B. Equipment / Facilities

The Vendor will work in his own environment using his own equipment, however it is expected that the vendor will spend appropriate time in HAAD to carry out the assignment and during that can be provided with office space in HAAD while using his own equipment.

(27)

Article 7 - Deliverables

While HAAD will monitor the service levels of the Vendor as per above listed SLA terms, the Vendor should submit the following:

• Overall Incident Summary reports.

• Incidents Summary reports location wise. • Call Documentation reports.

• Call Capture reports.

• Average Call Answer time reports. • Maximum Time to respond reports. • First Call Resolution reports.

• Overall Work Orders Summary reports. • Work Orders Summary reports location wise. • Work orders response time reports.

• Work orders Resolution time reports. • Service Requests Response time reports. • Service Requests Completion reports. • IT Assets recording reports.

• Assets recording (New & updates) time reports. • Periodic IT Assets Audit reports.

(28)

Section C – Draft Contract Agreement and Conditions

This Contract (“Contract”) is entered into by and between the Health Authority - Abu

Dhabi (the Contracting Authority) having its principal place of business at - P.O Box: 5674 – Abu Dhabi – United Arab Emirates , and --- (“the Vendor”) having

its / their principal place of business located at ---

The Contracting Authority wishes the Vendor to perform the services hereinafter referred to, and the Vendor is willing to perform these services.

Now therefore the Parties to this Contract hereby agree as follows:

Article 1 - Subject

The subject of this Contract is‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, with identification number: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

Article 2 - Structure of the contract

The Vendor will carry out the services on the terms and conditions set out in this contract, which comprises, in order of precedence, the special conditions ("Special Conditions") defined in this document and the following annexes:

Annex I: Request for Proposal Annex II: Vendor’s proposal Annex III: Vendor Personnel CV’s

Annex VI: Correspondences between both parties

In case of any contradiction between the above documents, their provisions shall be applied according to the above order.

Article 3 - Contract value The contract value is ‐‐‐‐‐ AED

Article 4 - Commencement date

The date for commencing the contract performance shall be the date of signature of this contract.

Article 5 - Personnel

A. The Personnel specified in the Staffing Plan set out in Annex III (the “Personnel”) shall carry out the Services indicated therein. In relation to the Personnel, the Vendor shall fully abide by the labour laws, health insurance laws, residence & employment visa requirements, health & safety and all other employer‐employee relationship matters under the United Arab Emirates laws. Nothing in this Contract shall be construed to create an employer‐employee relationship between HAAD & the Vendor’s Personnel.

B. In the event that any of the Personnel specified in Annex III is, in the opinion of the Contracting Authority, incompetent in discharging his/her assigned duties, the Contracting Authority may request the Vendor, to immediately provide as a replacement, a person with qualifications and experience acceptable to the

(29)

Contracting Authority without any additional cost. The Vendor shall submit to the Contracting Authority the names and curricula vitae (to include details of all qualifications) of any proposed substitute and shall permit the Contracting Authority to interview any substitute. The Contracting Authority may in its absolute discretion refuse to accept any proposed substitute and in such case the Vendor shall submit to the Contracting Authority further names and curricula vitae of proposed substitute personnel. The fees for the Services as set out below in Article 9 will not be changed by the replacement of Vendor’s personnel as requested by the Contracting Authority.

C. The Vendor shall make no change to the personnel specified in Annex III without the prior approval of the Contracting Authority. If the Contracting Authority shall approve a change in the Personnel, the Vendor shall submit to the Contracting Authority the names and curricula vitae (to include details of all qualifications) of any proposed substitute and shall permit the Contracting Authority to interview any substitute. The Contracting Authority may in its absolute discretion refuse to accept any proposed substitute and in such a case the Vendor shall submit to the Contracting Authority further names and curricula vitae of proposed substitute personnel. Without prejudice to the foregoing, if the Contracting Authority so requests, the Vendor will provide the Contracting Authority with the names of proposed substitutes to enable the Contracting Authority to approve a substitute in accordance with the terms hereof in advance of any specific requirement by the Contracting Authority. The Contracting Authority shall promptly give or refuse its approval.

Article 6 - Information to be provided to the Vendor

The Authority shall supply free of charge all available data and information, and shall give such assistance to the Vendor at its request and as may be reasonably required for carrying out his duties under this Agreement. The Contracting Authority recognizes and confirms that the Vendor will use and rely primarily on the information provided by the Contracting Authority and on information available from public sources in performing the Services without having independently verified the same and does not assume responsibility for the accuracy or completeness of any information provided by the Contracting Authority or such other publicly available information.

Article 7 - Reporting

The Vendor shall provide the Contracting Authority with monthly progress reports as specified in the ToR.

Article 8 - Invoices

Payments will be made within 30 days from the date of receiving an acceptable invoice to the finance. The submitted invoice should be signed and stamped by the Vendor and include the following information:

• Contract no.

• Contact person in the firm • The service provided

• Bank details (i.e., branch details, account number etc.…)

(30)

Article 9 - Contract Price

The contract Prices shall be fixed and not subject to change. Article 10 - Contact addresses

[

Any written communication relating to this Contract between the Contracting Authority and the Vendor must state the Contract title and identification number, and must be sent by post, fax, e‐mail or by hand to the addresses identified herein this contract .

Article 11 - Performance Bond

The Vendor shall be required to secure a performance bond in an amount equal to 10 % of the total award price within 10 days from signing the contract and to be in effect for the duration of the performance period. The performance bond may be used to satisfy penalties for late delivery and/or loss incurred in the event of the Vendor’s failure to deliver or perform according to the requirements of the contract. The performance bond may be liquidated by HAAD to satisfy penalties should they be applicable. In this case provided that this Contract has not been terminated the Vendor shall replenish the performance bond to 10% of the total award price.

[

Article 12 - Intellectual Property

D. The Vendor may furnish the Contracting Authority with reports, analyses or other such materials (the "Materials"). The Contracting Authority understands and agrees that any such Materials will be furnished solely for its internal use and may not be furnished in whole or in part to any person or entity except as set out in clause 12.2, below.

E. The Contracting Authority may furnish the Materials to its directors, officers, and employees (and to its legal counsel, accountants, and investment bankers if retained by the Contracting Authority to provide services relating to the Services in connection with the Project), in each case only if such persons (i) need to know such information, (ii) are informed of the confidential nature of the Materials, and (iii) agree to comply with the restrictions stated in document. The Contracting Authority further agrees that, without the Vendor’s prior consent, it shall not refer to the Vendor or attribute any information to the Vendor in any communication external to the Contracting Authority for any purpose, including without limitation in press releases, web sites, offering memoranda, and conversations with analysts.

F. The Contracting Authority shall own all right, title, and interest, including, without limitation, all intellectual property rights, in and to the Materials, except that the Vendor retains all right, title and interest, including, without limitation, intellectual property rights, in and to the Vendor’s Tools (as defined below). To the extent that the Materials include any Vendor’s Tools, the Vendor hereby grants to the Contracting Authority a non‐exclusive, non‐transferable, non‐sub‐ licensable, worldwide, royalty‐free, perpetual license to use and copy the Vendor’s Tools solely for internal purposes and solely as part of the Materials. The “Vendor’s Tools” consist of any and all concepts, analyses, know‐how, tools, frameworks, models, and industry information and perspectives used by the Vendor in connection with the Services.

(31)

Article 13 - Non-assignment

A. The Vendor shall not assign or transfer the benefits and obligations of this Agreement or any part thereof to any person/company except by the Contracting Authority 's written approval, provided, however that any assignment by the Vendor to an affiliate shall not require the consent of the Contracting Authority. For the purposes of this agreement with respect to the Vendor, the term “affiliates” means any entities that directly or indirectly control, are controlled by, or are under the same control as, such party or any other entities affiliated with such party or entities.

B. In any case of bankruptcy or liquidation of the Vendor, this Agreement shall automatically be terminated. In this case, the official receivers, trustees or liquidators of the Vendor shall not have the right to transfer/ assign the benefits or any of the rights under this Agreement or prejudice the rights acquired by the Contracting Authority from the Vendor hereunder.

Article 14 - Contracting Authority Acknowledgement

It is the long‐standing practice of the Vendor to serve multiple clients within industries, including those with potentially opposing interests, as well as counter‐parties in merger, acquisition and alliance transactions. The Vendor is committed to maintain the confidentiality of the Contracting Authority’s information (generally as described in this Agreement) in all such situations.

Article 15 - Penalties

Should OSP fails to provide HAAD with any of the in‐scope services listed in

(Responsibility matrix of services from process perspective) or violates pre‐agreed services levels specified in Target Service Levels not due to HAAD negligence or

misuses thereof, prohibit the overall operations, Such failure at a reasonable discretion of HAAD may be charged according to the penalty scheme shown here:‐

Sr.# Activity Baseline Penalty Criteria

1 Call Captured 98% 1% of Monthly Charges < 98%

1.5% of Monthly Charges < 96% 3% of Monthly Charges < 94 %

2 Monthly Avg HD Response Response timesAs per 1 % of Monthly Charges Avg Response time < 90% mentioned in

Appendix‐C 1.5% of Monthly Charges Avg Response time < 80% 3% of Monthly Charges Avg Response time < 70% 3 Avg Desktop repair time Response timesAs per 1% of Monthly Charges Avg Response time < 90%

mentioned in

Appendix‐C 1.5 % Monthly Charges Avg Response time < 80% 2% of Monthly Charges Avg Response time < 70%

(32)

Sr.# Activity Baseline Penalty Criteria 4 Service Requests Processing

100% Service request

recorded 0.5% of Monthly Charges

Service request recorded < 98% 1.5% of Monthly Charges recorded < 95%Service request 2% of Monthly Charges recorded < 90%Service request 5 Monthly SLA report & review meeting every month1st week of 1% of Monthly Charges per non submission of report 6 Configuration reportMonthly Inventory every month1st week of 1% of Monthly Charges per non submission of report

7 Configuration dataInventory 98% Accuracy 1.5 % of Total Amount1% of Total Amount

Inventory Configuration data < 98% Accuracy Inventory Configuration data < 95% Accuracy

8 Customer Satisfaction 80% every 6 month AED 10,000/‐AED 20,000/‐ AED 25,000/‐

75‐79% 70‐75% <70 % Should OSP fails to achieve a percentage of 98% of inventory accuracy during HAAD Inventory accuracy audit conducted every 6 months, and then HAAD may impose penalty Of 3 % of the total amount of the SLA value.

These audits shall be carried out jointly by HAAD & OSP representatives over a sizable sample.

Article 16 - Confidentiality

The Vendor and/or the Contracting Authority:

a. Acknowledges that all Disclosures given by either of them or a third party to the other is of a confidential nature;

b. Acknowledges that all Disclosures are issued in connection with the performance of the Agreement and shall remain the property of the Disclosing Party at all times;

c. Undertakes to keep secret and confidential all and every part of the Disclosure and the contents of this Agreement unless and until the relevant part thereof shall become public knowledge;

d. Undertakes to keep in a safe, secure and confidential place any documents and materials supplied to it, and not to make use of or permit others to make use of the Disclosure or any part of it except where it is necessary in order for a person to perform this Agreement or as otherwise authorized by the Contracting Authority or the Vendor in writing;

(33)

e. To the extent that the Disclosure is no longer required to enable either the Contracting Authority or the Vendor to perform its duties under this Agreement, such party shall return the Disclosure together with all copies, notes and transcriptions thereof to the other party forthwith upon demand but in any event shall return the Disclosure and all copies, notes and transcriptions of the same upon the termination of this Agreement;

f. The Vendor and the Contracting Authority shall procure that any person to whom all or part of the Disclosure is divulged shall enter into a confidentiality undertaking in similar terms hereto;

g. In so far as any part of the Disclosure is in the public domain, the provisions of this clause will not apply to that part of the Disclosure.

Article 17 - Taxes

The Vendor shall be liable for all taxes, imposts, duties, withholding taxes, charges or other assessments of whatsoever nature, whether levied by the Government of Abu Dhabi or the UAE Government.

Article 18 - Termination

The availability of penalties does NOT limit the Contracting Authority’s right to terminate this contract under 13.B or for the Vendor’s lack of performance in carrying the agreed upon service for reasons to be justified by the Contracting Authority’s advisory board.

The Contracting Authority and the Vendor shall both have the right to terminate this Agreement or any appointed Vendor upon written notification of at least thirty (30) working days before such termination. In such a case the Vendor shall proceed in an orderly, rapid and economic way with the procedures to terminate his services and duties under this Agreement. In the event of any termination hereunder, the Contracting Authority’s sole responsibility with respect to professional fees and related expenses shall be to pay those professional fees and related expenses earned or incurred through the effective date of termination. Article 19 - Governing Law and Language

The contract is subject to and shall be construed according to the applicable laws and regulations of the United Arab Emirates and the Emirate of Abu Dhabi. The contract and all notices pursuant to the provisions of this subcontract shall be in English.

Article 20 - Entire Agreement

This Agreement embodies the entire Agreement between the Contracting Authority and the Vendor with respect to the Services and supersede all prior agreements, negotiations, understandings, representations and warranties, whether written, oral or otherwise and in particular any standard terms customarily issued by the Vendor.

(34)

No changes, amendments or modifications of the terms or conditions of this Agreement shall be valid unless executed in writing and signed by both parties. Article 21 - Dispute settlement

Any disputes arising out of or relating to this contract which cannot be settled otherwise shall be referred to the competent courts in the Emirate of Abu Dhabi for consideration and settlements in accordance with the applicable law and regulations. Notwithstanding the referral of the disputes as mentioned herein, the Vendor shall continue to perform their duties under this agreement if so requested by the Contracting Authority.

This contract is written in English in three originals, two originals for the Contracting Authority and one original being for the Vendor.

For the Vendor For the Contracting Authority

Name: Name:

Position: Position:

Signature: Signature:

(35)

Annex 1 – Evaluation Criteria and scores

Only proposals with average scores of at least 70 points qualify for the financial evaluation.

Evaluation Criteria Maximum score

Understanding of the project's requirements

Proposed method to be approached in providing the required services successfully

20 Vendor’s background and experience on projects of similar

nature, 30

Vendor’s market benetration within UAE 30

Availability of sufficient and capable personnel with the required

qualifications, skills and experience dedicated to the project 20 Mandatory criterion‐ accepting HAAD’s Scope of Work and

turnaround time Y/N

References

Related documents

Some routine maintenance and service works are likely to impact on ACM from time to time. Situations where this can occur will be identified through the City of Gold Coast

Forest product portfolio Solid wood Pulp and paper Bio- energy Bio-fuels Bio- chemical s Bio- products Bio- plastics Textiles Food additives.. These avenues offer an occasion

As noted at the beginning of this chapter, the size of fire at the point of detection by ceiling mounted detectors, particularly point-type detectors, increases as ceiling

Lapatinib plus capecitabine in patients with previously untreated brain metastases from HER2-positive metastatic breast cancer (LANDSCAPE): a single-group phase 2 study.

Korean Institute for Health and Social Affairs, Seoul, South Korea. 03/2006-08/2006

Fuel fill with lockable cap and 203 mm (8 in.) riser Electrical stub-up area open to bottom Fuel leak detection switch available option Emergency inner tank relief vent Removable

Humiles (Rydb.) Semple presents an in- teresting system in which to examine patterns of polyploidy and infraspecific cytotype variation. The subsection is composed of one

In Homily 13 On repentance , Asterius directly addressed such priests eight times and devoted an entire section of the homily to “the art of shepherding” in the hope that he