1 CONTRACTOR shall prepare the Technical Document Register (TDR), as shown below, to be used in the PROJECT. The following deliverables will constitute the minimum requirement of documents that shall be produced by CONTRACTOR and submitted to PCIHBV.

This TDR shall detail documentation titles and planned issue target dates, actual submission dates, the number of revisions during review and cycle, AFC and others while identifying dependencies and critical items. The TDR shall also identify the review chain or class for each document. The list of deliverables shall be all engineering documentation and drawings originating from CONTRACTOR, including third party reports and surveys, inspection reports and certification.

During the progress of the WORK, CONTRACTO

the CONTRACT, or as PCIHBV may reasonably. PCIHBV, within a reasonable period but no later than fourteen (14) days after receiving such drawings and information, shall signify its approval thereto or otherwise.

A. PROJECT MANAGEMENT Item Document Name

1 Project Execution Plan

2 Project Correspondence & Communication Procedure 3 Document Numbering Procedure

4 Drawing Numbering Procedure

5 CAD Manual Procedures and Standards 6 Equipment Tagging Procedure

7 Design Basis Memorandum - General 8 Contract Administration Procedure 9 Contract Management Programme 10 Contract Interface Plan

11 Engineering Execution Plan 12 Project Organization Chart

13 Document Review and Approval Procedure 14 Project Control and Reporting Procedure 15 Project Change Management Procedure 16 Defects Liability Procedure

17 Project Contract Execution Schedule Level 4 18 Work Breakdown Structure (WBS)

19 Technical Document Register (TDR) 20 Schedule Basis Memorandum 21 Payment Milestone & Cost Curve 22 Manpower Histogram

23 Progress Measurement Basis 24 Invoicing Administration Procedure 25 Change Order Procedure

(2)

2 27 Manpower Loading and Equipment Loading

28 Final Documentation Procedure

29 Project Close Out Procedure and Report 30 Project Hand Over Procedure

31 Procedure for Mechanical Completion 32 Procedure for Provisional Acceptance

33 Procedure for Final Documentation Preparation 34 Procedure for Engineering Close Out Report 35 Procedure for Procurement Close Out Report 36 Procedure for Construction Close Out Report 37 Procedure for Commissioning Close Out Report 38 Procedure for Project Close Out Report

39 Procedure for Project Handover

B. HSE

Item Document Name 1 HSE Plan

2 HSE Philosophy

3 Security Management Plan 4 Emergency Response Plan 5 Risk Management Procedure

6 Sub-Contractor HSE Management Plan 7 Incentive and Disciplinary Plan

8 HAZID for Early Works

9 Environmental Management Plan 10 Air, Water and Soil Pollution Plan 11 Waste Management Plan

12 Safety Induction Plan

13 Incident and Accident Reporting Procedure

14 Health, Safety and Environmental Committee Procedure 15 QRA Report

16 Permit To Work Procedure

17 Personal Protective Equipment Procedure 18 Lifting and Hoisting Procedure

19 Confined Space Entry Procedure 20 Noise Management Plan

21 Excavation Procedure

22 Crane Lifting and Operation Procedure 23 Welding, cutting and gas cylinders Procedure 24 Sling Safety Procedure

(3)

3 26 Blasting Procedure

27 Fire Protection and Prevention Procedure 28 Transportation Safety Procedure

29 Job Safety Analysis Methodology for All Construction Activities

C. QA/QC

Item Document Name 1 Project Quality plan

2 Quality Requirement Procedure for subcontractor 3 Site Document and Data Control Procedure 4 Control of Quality Records Procedure

5 Product Identification and Traceability Procedure 6 Source Inspection Management Procedure 7 Inspection and Testing Procedure

8 Control of Inspection, Measuring and Test Equipment Procedure 9 Punchlist Procedure

10 Internal Audits Procedure 11 Inspection and Test Plans

12 Mechanical Completion Procedure 13 Non-Destructive Test Procedure 14 Non-conformance Control Procedure 15 Corrective and Preventive Action Procedure

16 Working Near Existing Above/ Underground Facilities Procedure 17 Regulatory Approval Procedure

18 Technical Query Procedure

19 Applicable Welding Standards for Project Specifications 20 Welding Procedure

21 Welding Procedure Specification

22 Qualification of Welding Procedure Specification 23 Organization of Welding Process Control

24 Quality and Control of Welders 25 Welder Qualification Test Procedure

26 Welding Marking requirement and Procedure 27 Radiographic Procedure Specification 28 Radiographic Film Packing Procedure 29 Painting and Coating Specification 30 Control of welding Material 31 Pressure Leak Test Procedure 32 Holiday Test Procedure

(4)

4 D. PROCUREMENT / SUB-CONTRACT

Item Document Name

1 Procurement and Sub-Contract Plan 2 Procurement Execution Plan

3 Procurement Register 4 Project Material Take-Off

5 Prequalification of Vendors and Sub-contractors 6 Vendor Surveillance Procedure

7 Proposed Vendor List

8 Proposed Sub-Contractor List 9 Material Management Procedure

10 Scope of Work for Non-Destructive Testing (NDT) Piping and Pipeline 11 Expediting procedure

12 Material Handling and Control procedure 13 Material Receiving and Control procedure 14 Surplus Material Handling Procedure 15 Packing and Marking Procedure 16 Spare Part Philosophy and Procedure 17 Transportation and Logistic Procedure 18 Custom Clearance Procedure

19 Tax Exemption Procedure and Formalities

E. CONSTRUCTION Item Document Name

1 Construction Execution Plan 2 Method of Statements

3 Pre-Commissioning Procedure 4 Site Survey Procedure

5 Soil Investigation Procedure 6 Pipeline Lowering Procedure 7 Backfilling Procedure

8 Welding Methodology

9 Pipeline Tie-In Welding Procedure 10 Pipeline Weld Repair Procedure

11 Pipeline Control of Welding Consumables Procedure 12 PQR for Mainline Welding of Pipes

13 Flange Management Procedure

(5)

5 F. COMMISSIONING

Item Document Name

1 Commissioning Execution Plan

2 Commissioning and Start Up Procedure 3 Commissioning Safety Procedure

4 Interface Tie-in List and Responsibility Matrix 5 Procedure for Operating and Start Up Manual

G. PROCESS

Item Reports/Calculations

Steady State Hydraulic Report

1 Design Basis Memorandum - Process 2 Flow Assurance Report

3 Report - Stagnant Inventory - Final Route

4 Process Operating, Start-up, Shutdown and Safeguarding Philosophy 5 Utility Consumption Report

6 Equipment / Line Sizing report 7 HAZOP Study Report

8 HAZOP Close-out Report 9 Relief Load Report 10 Line List 11 Tie-in List 12 Equipment List Item Datasheets 1 Process Datasheet Item Drawings

1 Process Flow Diagram (PFD)

2 Piping & Instrumentation Diagram (P & ID) 3 Utilities Flow Diagram (UFD)

4 Process Safeguarding Diagram

H. PIPELINE

Item Reports/Calculations

1 Design Basis Memorandum - Pipeline 2 Right of Way (ROW) requirements 3 Pipeline Route Survey Report

4 Pipeline Stress and Flexibility Analysis Report 5 Pipeline Buoyancy Control Report

6 Pipeline crossing study report

(6)

6 8 Pipeline Internal corrosion mitigation study

9 Pipeline wall thickness calculations 10 Pipeline Material Take Off Report (MTO) 11 Pipeline Operating Manual

12 Pipeline spare part and consumables lists 13 Pipeline Preservation Report

14 Pipeline horizontal directional drilling (HDD) report 15 Pipeline Calculation Report

16 Stress Analysis Report 17 Crossing List

18 Scope of Work for Topographic Survey 19 Scope of Work for Geotechnical Survey 20 Scope of Work HDD

Item Specifications

1 Specification for Pipeline Welding 2 Specification for External Coating Repair 3 Specification for Large Check Valves 4 Specification for Barred Tees

5 Specification for Anchor Flanges

6 Specification for Pig Launcher / Receiver 7 Specification for Cold Bend

8 Specification for Monolithic Insulation Joints 9 Specification for Field Joint Coating

10 Specification for Buoyancy Control 11 Specification for Pigging

12 Specification for Corrosion Coupon

13 Specification for sampling & chemical injection Item Datasheets

1 Datasheet for Pig Launcher 2 Datasheet for Pig Receiver 3 Datasheet for Cold Bend 4 Datasheet for Bared Tees

5 Datasheet for Monolithic Insulation Joints 6 Datasheet for Anchor Flange

7 Datasheet for Field Joint Coating 8 Datasheet for Buoyancy Control 9 Datasheet for Corrosion Coupon

10 Datasheet for Sampling & Chemical Injection 11 Datasheet for External Coating Repair 12 Datasheet for Pigging

Item Material Requisitions

(7)

7 2 Material Requisitions for Monolithic Insulation Joint

3 Material Requisitions for Corrosion Coupon 4 Material Requisitions for Field Joint Coating 5 Material Requisitions for Barred Tee

6 Material Requisitions for Anchor Flange

7 Material Requisitions for Pig Launcher / Receiver 8 Material Requisitions for Heat Shrink Sleeves Item Drawings

1 General Notes and Drawing Index 2 Overall Pipeline Schematic

3 Details R.O.W Dimensions for Pipelines 4 Pipeline Alignment Sheet Key Plans 5 Pipeline Alignment Sheet

6 Installation Details for Block Valve Stations 7 Installation Details for Pipeline Arial Marker

8 Installation Details for Warning Sign for Water Way & Road Crossing 9 Installation Details for Set-On Weight

10 Installation Details for Utility & Pipeline Crossing

11 Installation Details for High Voltage Transmission Crossing-Over Head 12 Installation Details for Soil Erosion Protection Measures

13 Installation Details for Trenching & Backfilling-Normal Soil Condition 14 Installation Details for Trenching & Backfilling-High Water Table 15 Installation Details for Water Way/Creek Crossing - Open Cut 16 Installation Details for Water Way/Creek Crossing - HDD 17 Installation Details for Road Crossing - Open Cut

18 Installation Details for Road Crossing - Bored 19 Installation Details for Stream Diversion

20 Installation Details for Km Posts & Signage Installation 21 Installation Details for Anchor Block

22 Installation Details for Jib Cranes & Trollies

23 Installation Details for Pipeline Corridor Drainage Scheme and Drainage Slot 24 Installation Details for Pipeline Construction in Water Flood Area

25 Installation Details for Pipeline Field Joint Coating 26 Installation Details for Pipeline Bends

27 Installation Details for Pipeline Cathodic Protection System 28 Fabrication Drawings for Launchers

29 Fabrication Drawings for Receivers 30 Launchers General Arrangement 31 Receivers General Arrangement

(8)

8 I. PIPING AND MECHANICAL

Item Reports/Calculations

1 Design Basis Memorandum - Piping and Mechanical 2 Stress Analysis & Flexibility Report

3 MTO for Piping SP Item

4 MTO for Pipe, fitting & Bulk Material 5 MTO for Valves

6 MTO for Pipe Support 7 MTO for Bulk Material Item Specifications

1 Specification for Piping & Valves Material 2 Specification for Painting & Coating 3 Specification for Pipe Support

4 Specification for Wrapping, Painting & Coating for Underground Piping 5 Specification for Close Drain Vessel

6 Specification for Flanges 7 Specification for Manual Valves 8 Specification for Lifting Equipment 9 Specification for Fire Fighting Equipment Item Datasheets

1 Datasheet for Close Drain Vessel 2 Datasheet for Piping SP item 3 Datasheet for Manual valves 4 Datasheet for Lifting Equipment 5 Datasheet for Fire Fighting Equipment Item Material Requisitions

1 Material Requisitions for Close Drain Vessel 2 Material Requisitions for Valves

3 Material Requisition for Lifting Equipment 4 Material Requisition for Fire Fighting Equipment Item Drawings

1 Piping General Arrangement and Elevation for Sending Trap Area 2 Piping General Arrangement and Elevation for ESDV Block Valves 3 Piping General Arrangement and Elevation for Sending Trap Area 4 Above Ground and Under Ground Piping Key Plan (Launcher Area) 5 Above Ground and Under Ground Piping Key Plan (Receiver Area) 6 Above Ground and Under Ground Piping Key Plan (Block Valve Stations) 7 Close Drain Vessel Plan and Elevation

8 Piping Isometric Drawings

(9)

9 J. ELECTRICAL AND CATHODIC PROTECTION

Item Reports/Calculations

1 Design Basis Memorandum - Electrical 2 Cathodic Protection Design Report 3 Electrical Installation procedure

4 Electrical Testing & Commissioning Procedure 5 Calculation for Solar Panel Selection

6 Calculation for Cathodic Protection Design 7 Electrical Load List

8 Electrical Load Schedule for Nasiriyah Tie-In Area 9 Electrical Cable Schedule

10 Electrical Cable Sizing Calculation 11 Earthing System Calculation 12 Electrical Material Take Off List 13 Electrical Equipment List Item Specifications

1 Specification for Low Voltage Distribution Board 2 Specification for Solar Power System

3 Specification for Cathodic Protection Equipment & Material 4 Specification for LV Power, Control & Earthing cables 5 Specification for Electrical Bulk Materials

Item Datasheets

1 Datasheet for LV Distribution Board 2 Datasheet for Solar Power System

3 Datasheet for Cathodic Protection Equipment & Material 4 Datasheet for Power, Control & Earthing cable

Item Material Requisitions

1 Material Requisitions for Low Voltage Distribution Board 2 Material Requisitions for Solar Power System

3 Material Requisitions for Cathodic Protection Equipment & Materials 4 Material Requisitions for Power, Control & Earthing cables

Item Drawings

1 General Notes and Drawing Index

2 Single Line Diagram : 24V-DC , Solar Power panel for MOV and other loads 3 Single Line Diagram : 240V-AC Engine Driven Diesel Fuel Generator sets 4 Electrical Equipment Layout Drawing

5 Main Cable Routing Layout Plan

6 Hazardous Area Classification Layout Drawing 7 Earthing Layout

8 Installation Details for Solar Panel

9 Installation Details for Electrical Cable Trench 10 Installation Details for Cathodic Protection Test Post

(10)

10 11 Installation Details for Anode & Location Point

12 Installation Details for Groundbed & Location Point 13 Installation Details for Electrical Equipment

14 Installation Details for Earthing Cables 15 Installation Details for Electrical Cable Tray 16 Installation Details for Transformer Rectifier

K. INSTRUMENTATION AND CONTROL Item Reports/Calculations

1 Design Basis Memorandum Instrumentation and Control System 2 Instrument Air / Hydraulic Consumption Philosophy

3 Pipeline Leak Detection Control Philosophy 4 Over Pressure Protection Study

5 Fibre Optic Route Selection Study

6 Fibre Optic Network Equipment (FONE) System Sizing Calculation 7 Fibre Optic Network Cable (FOC) Link Budget Calculation

8 FONE Optical Link Calculation

9 Fiber Optic & Instrument Cable Schedule 10 Procedure for Fibre Optic Cable Installation 11 Material Take Off for Instrumentation

12 Fiber Optic & Instrument Cable Drum Schedule Item Specifications

1 Specification for General Instrumentation (Gauges & Transmitters) 2 Specification for Instrument Installation

3 Specification for Instrument Cable 4 Specification for Fibre Optic Cables 5 Specification for Safety Instrument System 6 Specification for Pipeline Leak Detection System 7 Specification for Over Pressure Protection System 8 Specification for Pressure Safety Valve (PSV) 9 Specification for Distributed Control System 10 Specification for Shutdown Valves

11 Specification for Motor operated valves (MOVs) 12 Specification for Instrument Bulk Material

13 Specification for Fiber Optic Transmission System 14 Specification for Fire and Gas System

15 Specification for VOIP Phone 16 Specification for HF/SSB Phone 17 Specification for Satellite Phone

18 Specification for Fibre Optic Network Equipment 19 Specification for SCADA System for Heavy Oil Pipeline Item Datasheets

(11)

11 1 Datasheet for Pipeline Leak Detection System

2 Datasheet for Instrument Cable 3 Datasheet for Fibre Optic Cable 4 Datasheet for Motor Operated Valve 5 Datasheet for Shut Down Valve

6 Datasheet for Pressure Safety Valve (PSV) 7 Datasheet for Level Gauges

8 Datasheet for Flow Transmitter 9 Datasheet for Pressure Gauges 10 Datasheet for Pressure Transmitter

11 Datasheet for Differential Pressure Transmitters 12 Datasheet for Temperature Transmitters 13 Datasheet for Temperature Gauges 14 Datasheet for Relief Valves

15 Datasheet for Scraper Signalers 16 Datasheet for Fire & Gas Devices 17 Datasheet for VOIP Phone 18 Datasheet for Satellite Phone 19 Datasheet for HF/SSB Phone 20 Datasheet for Actuated Ball Valve Item Material Requisitions

1 Material Requisitions for Safety Instrument System (SIS) 2 Material Requisitions for Pipeline Leak Detection System 3 Material Requisitions for Fibre Optic Instrument cables package 4 Material Requisitions for Process Control System pipeline system tie-in 5 Material Requisitions for Motor Operated Valves

6 Material Requisitions for Fibre Optic Network Equipment 7 Material Requisitions for Shutdown Valves

8 Material Requisitions for General Instrumentations (Gauges & Transmitters) 9 Material Requisitions for Fire & Gas Devices

10 Material Requisitions for Instrument Valves 11 Material Requisitions for VOIP Phone 12 Material Requisitions for Satellite Phone 13 Material Requisitions for HF/SSB Phone 14 Material Requisitions for Actuated Ball Valve 15 Material Requisitions for Instrument Valves 16 Material Requisitions for Scrapper Signalers Item Drawings

1 General Notes and Drawing Index

2 Heavy Oil Pipeline General System Architecture 3 Instrument Cable Routing & Layout Drawings 4 Fibre Optic Cable Routing & Layout Drawings

(12)

12 5 Instrument Junction Box Wiring & Termination Diagram

6 Fiber Optic & Instrument Cable Schedules 7 Instrument Index

8 Input / Output List

9 Control System Architecture

10 Pipeline Leak Detection System Architecture 11 Fibre Optic Network Equipment Block Diagram

12 Fibre Optic Network Equipment Power Distribution Diagram 13 Fibre Optic Network Equipment Rack Layout and Wiring Diagram 14 Installation Details for Fibre Optic Crossing and Trench

15 Interlock Logic Diagram 16 Instrument Support Details 17 Instrument Hook-Up drawing 18 Instrument Loop Diagrams 19 Overall System Block Diagram 20 Control Room Layout For Garraf 21 Cause Effect Diagram

L. CIVIL AND STRUCTURE Item Reports/Calculations

1 Design Basis Memorandum - Civil/Structural 2 Site Survey Report

3 Soil Investigation Report - Final Route (Geotechnical Investigation Report) 4 Report Buoyancy Control

5 Civil Materials - Provisional Take-Off (PMTO) 6 Foundation Calculation for Launcher Station 7 Foundation Calculation for Receiver Station 8 Foundation Calculation at Nasiriyah Tie-In Area 9 Foundation Calculation for Anchor Block 10 Foundation Calculation for Valve Stations 11 Calculation for Drain Tank Pit

12 Calculation for Drainage Item Specifications

1 Specification for Excavation and Backfilling 2 Specification for Fencing

3 Specification for Architectural Works 4 Specification for Earthworks

5 Specification for Concrete Works 6 Specification for Road and Paving 7 Specification for Steel Structures 8 Specification for Grouting and Leveling

(13)

13 9 Specification for Drainage

Item Drawings

1 General Notes and Drawing Index Drawing Index 2 General Notes - Civil

3 General Notes - Structural

4 Civil Layout - Garraf Launcher Area 5 Civil Layout - Receiver Tie-In Area 6 Plan , Elevation , Sections RTU Room

7 Foundation Details - Pig Launcher (Phase 1 & Phase 2) 8 Foundation Plan and Details - Pig Receiver Phase 2 9 Foundation Details - 24 Line Anchor Block

10 Foundation Details - Solar Panels 11 Foundation Details Jib Crane (Phase II)

12 Structural and Foundation Details - RTU Shelter

13 Foundation Details Pig Receiver Impact Wall Details (Phase II) 14 Pipe Support Details - Garraf Area

15 Pipe Support Details - Receiver Tie-In Area 16 Installation Details for Fence and Gate

17 Plan & Profile River Crossings (Pipeline Route Plan) 18 Plan & Profile Highway Crossings (Pipeline Route Plan) 19 Plan & Profile Details for River Crossing

20 Plan & Profile - Detail Open Cut Road Crossing 21 Plan & Profile - Detail Bored Road Crossing

22 Plan & Profile - Detail Underground Utility Crossing 23 Tie-In at Receiver (Tie-In Station / Foundation Layout) 24 Details of Foundation & Supports - Sending Trap areas 25 Details of Foundation & Supports - River Crossing ESDV Sites 26 Details of Foundation & Supports - Receiving Trap /Tie-In area 27 Installation Details for Drain Tank & Base Pads

28 Pipeline Anchor Block Layout

29 Details of Foundation & Supports for ESDV Control Panel and Solar Panel 30 Details of Foundation for Lighting Pole

31 Transformer / rectifier Pads for Cathodic System 32 Gravel Pad Plan & Drainage Layout - Sending Trap Area 33 Gravel Pad Plan & Drainage Layout - ESDV

34 Gravel Pad Plan & Drainage Layout - Receiving Trap Area 35 Details of Service, Access Roads with Gravel & Drainage 36 Camp and Contractor Yard Plan

37 Installation Details for Concrete Slab 38 Earthwork drawings

(14)

14 M. MATERIAL CORROSION

Item Reports/Calculations 1 Corrosion Management Plan 2 Material Selection Report

3 Pipeline Integrity Management Plan

4 Calculation and Design for Cathodic Protection System 5 Operation and Manual for Cathodic Protection System 6 MTO for Cathodic Protection System Permanent 7 MTO for Cathodic Protection System Temporary

8 Tender Bid Evaluation (TBE) for Cathodic Protection System 9 Tender Bid Evaluation (TBE) for Painting and Coating Item Specifications

1 Project Quality Plan

2 Non-conformance Control Procedure 3 Corrective and Prevention Action Procedure 4 Packing and Preservation Procedure

5 Hardness Test Procedure

6 Specification for CP Material and Equipment 7 Welding Procedure Specification

8 Welding Repair Procedure Specification 9 Welder Qualification Test

10 Paint Matrix

11 Specification for Corrosion Monitoring Systems & UT Thickness Measurement Locations 12 Inspection Test Plan

13 Radiographic Test 14 Magnetic Particle Test 15 Ultrasonic Test 16 Particle Test

17 Final Documentation 18 Blasting and Painting Item Datasheets

1 Cathodic Protection Material and Equipment 2 Painting Datasheet

Item Material Requisitions 1 Painting and Coating

2 Cathodic Protection System Permanent 3 Cathodic Protection System Temporary Item Drawings

1 CP Installation Drawing Canal Crossing Test Post

2 CP Installation Drawing Deep Well Anode Ground Bed Details 3 CP Installation Drawing Anode Junction Box

(15)

15 5 CP Installation Drawing Test Post With Thermite Weld Pin Brazing Details

6 CP Installation Drawing Isolation Joint Test Post 7 CP Installation Drawing Test Post Anode

8 CP Installation Drawing Typical Road Crossing

9 CP Installation Drawing Reference Electrode & Polarization Coupon Details 10 CP Installation Drawing Foreign Bond Box

11 CP Installation Drawing Typical Equipotential Bond Box

12 CP Installation Drawing Typical Connection Details Thermite Weld & Pin Brazing 13 CP Installation Drawing Typical Cable Laying Details

14 CP Installation Drawing Drain Point Test Post Details 15 CP Installation Drawing Line Current Test Post Details 16 CP Installation Drawing Polarization Coupon Test Post 17 CP Installation Drawing Welded Pad Connection Details 18 Materials Selection Diagram

References

Related documents

For a given dehydrogenation catalyst, the catalyst life , the molar conversion of ethyl benzene, and the molar selectivity of ethyl benzene to styrene are effected by reactor

Zato podjetje namerava v prihodnje slediti najnovejšim tehnološkim trendom na svojem področju, saj le tako ostaja konkurenčen igralec na trgu med večjimi distributerji Podjetje X

 Aveo cheetah3 usb2 0 driver windows 7  Driver scanner panasonic kx mb283  Pumpkin patch farm nokesville va  Emachines sound driver for w3050  Auto update driver search on

Test 5, numerical solutions and corresponding contour plots obtained with CN − FDs − FDt approach on uniform grid at the cut planes z = 0.. Test 5, numerical solutions

Health Informatics and Information Management (HIIM) Program Advisory Committee, University of Central Florida, Orlando,

The parties have agreed to a payment of $425,000 in attorneys’ fees and costs, as noted in the Settlement Agreement at 5, Section II.B.4 (Attorney’s Fees and Costs)1. Exhibit

How do i finish my homework faster internet Do my dissertation conclusion sample Essay writing prompts for college students

Copyrighted © 2008 DePrince& Associates www.supervoodoospells.com Page 4 Sunday morning before sunrise, hold this glass of water facing the East.. As the sun begins to