SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i January 25, 2016
7. HIGHWAY MATTERS
A. ROUTE 616 (IVOR ROAD) BRIDGE PROJECT UPDATE
Attached for your reference, please find a copy of the Traffic Alert from VDOT regarding the closing of the Route 616 (Ivor Road) Bridge for repairs. The bridge was closed to traffic on January 20 and is expected to remain closed for up to 6 weeks. Detour information is included in the Traffic Alert.
B. PUBLIC HEARING - REPLACEMENT OF RT. 671 BRIDGES
VDOT has scheduled a design public hearing for Wednesday, February 17 from 5:30 to 7:00 p.m. in the Board of Supervisors Meeting Room to share their proposed project plans for the replacement of two bridges on Route 671 (General Thomas Highway) over the Nottoway River in Southampton County. Construction to replace the 26’ wide bridges with new 42’ wide spans is tentatively scheduled for Summer 2019. VDOT is planning to close that section of 671 while the bridges are replaced. Their value engineering analysis indicates that the project can be completed 9 months quicker and $1.7 million cheaper than trying to build the bridges while maintaining traffic.
C. MONTHLY CONCERNS
Please come prepared to share any highway concerns that exist within your respective districts.
Mike Johnson
From: VDOT-News <VDOTNews@VDOT.Virginia.gov>
Sent: Thursday, January 14, 2016 4:58 PM
Subject: HAMPTON ROADS: ROUTE 616 BRIDGE (IVOR ROAD) OVER SEACOCK SWAMP
RELEASE: IMMEDIATE January 14, 2016
CONTACT: Tiffany Whitfield: 757-925-1516 Emergency/After-Hours: 757-925-2584 Tiffany.Whitfield@VDOT.virginia.gov
ROUTE 616 BRIDGE (IVOR ROAD) OVER SEACOCK SWAMP
TO CLOSE FOR REPAIRS
Detour will be in place during the closure
SOUTHAMPTON COUNTY– Crews with the Virginia Department of Transportation (VDOT) will close Route 616
Bridge (Ivor Road) over the Seacock Swamp for superstructure repairs beginning Wednesday, January 20. The full bridge closure will last for six weeks. Signed detours are scheduled to be put in place beginning Monday, January 18. Traffic will be detoured as follows:
Passenger Vehicles:
Westbound Traffic: Travel west on Ivor Road (Route 616) for 3.6 miles and turn left on Millfield Road (Route
605). Travel southeast on Millfield Road for 2.3 miles and turn left on Seacock Chapel Road (Route 614). Travel east on Seacock Chapel Road 1.2 miles and turn left onto Doles Road (Route 600). Travel north on Doles Road for 2.7 miles back to Ivor Road.
Eastbound Traffic: Travel east on Ivor Rd (Route 616) for 0.3 miles and turn right on Doles Road (Route
600). Travel south on Doles Road for 2.7 miles and turn right on Seacock Chapel Road (Route 614). Travel west on Seacock Chapel Road 1.2 miles and turn right on Millfield Road (Route 605). Travel northwest onto Millfield Road for 2.3 miles back to Ivor Road.
Heavy Truck Traffic: (Two detour options)
Alternate #1 Detour Route Heavy Trucks: Traveling from Courtland (Route 58) to Ivor (Route 460):
From Courtland proceed north onto Jerusalem Plank Road (Route 35) 17.6 miles to Sussex Drive (Route 40). Turn right onto Sussex Drive and proceed northeast 7.9 miles to South County Drive (Route 460). Turn right onto South County Drive and proceed southeast 14.2 miles onto Ivor Road (Route 616-Town of Ivor).
Alternate #1 Detour Route Heavy Trucks: Traveling from Ivor (Route 460) to (Route 58):
From (Route 616-Town of Ivor) proceed northwest 14.2 miles and turn left onto South County Drive (Route 460). Proceed southwest 7.9 miles onto South County Drive (Route 460) and turn left onto Sussex Drive. Proceed on Sussex Drive (Route 40) 17.6 miles to Jerusalem Plank Road (Route 35) to Courtland.
Alternate #2 Detour Route Heavy Trucks: Traveling from Courtland (Route 58) to Ivor (Route 460):
From Courtland proceed southeast 13.8 miles to Route 258 Bypass (Truck Route). Take exit right, then turn right onto Route 258 Bypass (Truck Route) and proceed north 16.7 miles to Route 460 (Town of Windsor). Turn left onto Route 460 and proceed northwest 10.3 miles to Ivor Road (Route 616-Town of Ivor).
Alternate #2 Detour Route Heavy Trucks: Traveling from Ivor (Route 460) to Courtland (Route 58):
From (Town of Ivor) Ivor Road (Route 616) proceed southeast 10.3 miles and turn right onto Route 460 (Town of Windsor). Proceed on Route 460 16.7 miles turn left onto Route 258 Bypass (Truck Route). Proceed onto Route 258 Bypass (Truck Route) 13.8 miles northwest to Courtland.
Motorists are encouraged to visit www.511virginia.org, call 511, download Virginia’s free 511 mobile app, listen to Highway Advisory Radio (HAR) 1680 AM or call the Traffic Information Line at 757-361-3016 for current traffic and travel information.
RECEIVED
JAN
1
C 2n;5
COMMONWEALTH
of
VIRGINILA
DEPARTMENT OF TRANSPORTATION HAMPTON ROADS DISTRICT
Charles A. Kilpatrick, P.E.
Commissioner
Notice of Design Public Hearing Roule: 671 Gencral Thomas Hwy
1700 NORTH MAIN STREET SUFFOLK, VIRGINIA 23434 January 14.2016 Project: 0671-0S7-610. C501. C502. 8661. 8662, RW201 UPC: 101495 I'IIW A BR-OS7-05(0 17).05(033).05(032) Southampton County
From: 0.700 Milcs Wesl of Route 650
To: 0.007 Miles West of Routc 650
TO: Property Owner
Attached are the Public Noticc and Location Map advising of a proposed Highway Improvement Project. The Pub I ic I-Iearing wi II be February 17, 2016 at the Southampton County Office Center
(Board Room) Courtland. Virginia from 5:30 pm to 7:00 pm. A Snow Date of February IS, 2016
at 5 :30pm to 7:00 pm has been set in case of inclement weather on February 17,2016.
Should you desire additional inFormation or have any questions or comments concerning this
project. plcase contact the Project Manager. Diane Geouge at (757) 925-3624.
Sincerely.
Diane Gcougc
Roadway Design Engineer
Location and Design
Ilampton Roads District
Attachments
Route 671 (General Thomas Highway)
Over Nottoway River Bridge Replacement
Southampton County
Design Public Hearing
Wednesday, February 17, 2016, 5:30 p.m. to 7 p.m.
Snow Date: Thursday, February 18, 2016, 5:30 p.m. to 7 p.m.
Southampton County Office Center (Board Room)
26022 Administration Center Drive, Courtland, VA 23837
Come arid see the proposed project plans for the replacement of
two
bridges on Route 671
(General
Thomas
Highway) over Nottoway River in Southampton County. The proposed project includes the construction of
two
new bridges
with
two lanes and the addition of 9-foot 4-inch shoulders to each side of the bridges .
.
Review the proposed project plans and the environmental documentation at the public hearing or at the VDOT Hampton
Roads District Office, 757-925-2500 or 1-888-723-8400, TIYfTDD 711, or at VDOT Franklin Residency 23116
Meherrin
Road, Courtland, VA 23837, 757-346-3073. Please call ahead to ensure the availability of appropriate personnel
to
answer your questions. Property impact information, relocation assistance policies and tentative construction schedules
are
available
for your review at the above addresses and
will
be available at the public hearing.
Give your written or oral comments at the hearing or submit them by February 29, 2016, to
Ms.
Diane Geouge,
Project Manager, VDOI. 1700 North Main Street, Suffolk, VA 23434. You may also email your comments to N.Geouge@
VDOIVirginia
.
gov. Please reference "Route 671 Bridge Over Nottoway Bridge Replacement Comment" in
the
subject
line.
In compliance with the National Historic Preservation Act, Section 106 and 36 CFR Part
800,
information
concerning the potential effects of the proposed project on properties listed in or
eligible
for
listing
in the National Register of Historic Places is provided in the environmental documentation.
VDOT ensures nondiscrimination and equal employment
in
all programs and activities in accordance
with
Title VI and
Title VII of the Civil Rights Act of 1964. For more
information
or special assistance for persons
with
disabilities or limited
English proficiency, contact VDOT's Civil Rights Division at 757-925-2500 or TIYfTDD 711.
State Project: 0671-087-610. (SOl. (502. 8661. 8662. RW201
, , , , ,
,
,
,
.,
,
, ,
Project
Locotlon
571
, , , , , , , ... _---/ / / / ( \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / / / / \ \ \,
\ / / / / \ \ \ \ \ / / / \ \ \ / /,
\ \ / , / /550
elaware
, ,
,
\ \ \,
,
,
\ \,
\,
\--
---~VDOT
8ridge Replacement ProjectRoute 671
General Thomas Hlgtway Southomptan County
Project 0671-087-610. PE-IOI.
RW-201. C-501. C-502. 8-661. 8-662
From:0.700 MI.S.of Route 650 To: 0.007 Mi. N. of Route 650
o