Railway Timetabling

Optimizer

www.eurobios.com

The world leader in commercializing the science of

complexity and complex adaptive systems through

market driven software products.

(2)

EXPERTISE ET METIER

„

EUROBIOS est:

z

Éditeur

de solutions logicielles, et

Société de Conseil

z

Spécialisé dans la conception et la mise en œuvre de solutions:

- De simulation stratégique,

- D’optimisation tactique ou opérationnelle,

- De prévision à court ou moyen terme.

z

Disposant d’une expertise et d’une maîtrise appliquée des « sciences de la complexité ».

Recherche

opérationnelle

Intelligence

artificielle

Simulation à base

d’agents

Réseaux de

neurones

Algorithmes

Génétiques

Sciences de la

complexité

(3)

Copyright Eurobios 2000- 2008 ©- Confidentiel - Diffusion interdite sauf autorisation expresse d’Eurobios

(4)

QUELLE SOLUTION EUROBIOS POUR QUELLE PROBLEMATIQUE ?

-Optimisation d’horaires

-Optimisation de tournées

-Affectation de ressources

-Réallocation industrielle

-Simulation logistique

-Prévision de la demande

-Modélisation de comportement

de marchés

-...

(5)

Railway Timetabling

Optimizer

(6)

Railway Timetabling Optimiser

„

Railway context

z

Following EU policy directives, activities of infrastructure manager and train

operators are separated

z

Increase in traffic densities is expected

„

Ability to undertake infrastructure planning in a very timely, smooth and

efficient way is becoming a critical task for the infrastructure manager

„

Railway Timetabling Optimiser (RTO) is a decision support tool for strategic

and operational timetabling planning of the rail infrastructure

„

Benefits are:

z

A better usage of track resources,

z

An increase of the rail system capacity

z

Faster replies to requests from train operators

(7)

Copyright Eurobios 2000- 2008 ©- Confidentiel - Diffusion interdite sauf autorisation expresse d’Eurobios

„

Railway Timetabling Optimiser answers questions like:

z

What is the best way to plan a number of train services starting from

scratch?

z

What is the best timetable subject to some specific revenue constraints?

z

What is the best way to add a new train service to an existing timetable

while minimizing perturbations?

z

How and when should maintenance operations be planned?

z

May I build more robust timetables?

(8)

Railway Solutions Platform

„

Railway Timetabling Optimiser’s architecture is based on the Eurobios Railway

Solutions Platform

„

The platform is designed to model and manipulate railway problems related to

infrastructure usage:

z

From strategic to operational level

z

From automatic problem solving (optimizer) to interactive design

(semi-automatic or completely manual)

„

Examples:

z

Planning of infrastructure investments

z

Planning of maintenance operations

z

Robustness of timetables

(9)

Copyright Eurobios 2000- 2008 ©- Confidentiel - Diffusion interdite sauf autorisation expresse d’Eurobios

Railway Timetabling Optimiser

„

RTO integrates the railway infrastructure usage model

„

It integrates also railway high-level and low-level constraints:

z

Domain-specific constraints such as:

-

Tracks usage (capacity, crossing, headway)

-

Time window

-

Stations capacity

-

Safety

-

Connections

z

Train strategic timetabling specific constraints and data model :

-

Symmetry

-

Strong periodicity

(10)

Railway Solutions Platform

Railway

domain-specific

constraints

Train

scheduler

Train timetabling

specific

constraints

Strategic Train Timetabling data

model

Strategic

planner

Strategic train

timetabling

Railway network

structure and

infrastructure

usage

Railway

infrastructure

usage

data model

Railway Solutions

Platform

RT

O

RTO

„

Based on Eurobios Railway Solution Platform,

RTO is customisable to your

specific environment and needs:

„

RTO Constraints-based modelling allows taking into account:

z

Complex optimisation constraints

z

Railway domain specific constraints

z

User specific workflow and habits

(11)

Copyright Eurobios 2000- 2008 ©- Confidentiel - Diffusion interdite sauf autorisation expresse d’Eurobios

„

Why are Eurobios methods and technologies better?

z

Proprietary Constraints Network:

- Provides a flexible environment for representing all complex constraints

of a domain (e.g., railway systems)

- Manages interactions with the user:

• Gives explanations about eventual constraints violations

• Provides real-time feedback about the impact of changes

performed by the user

- Supports optimisation

z

State of the art optimisation algorithms:

- Genetic Algorithms and Memetic Algorithms

- Meta-heuristics

(12)

Railway Timetabling Optimiser

Visualisation/Analysis

Analysis

Optimisation

Engine

User

Interface /

Constraints

Network

Timetabling Problem

Definition

Train services

definition

Constraints:

Infrastructure

Service

Asda dsd dsd 12 32 32 22 44 43 23 44 44 55 66 44 22 33 44

Tables

Optimisation

objectives

Graphs

RTO

(13)

Copyright Eurobios 2000- 2008 ©- Confidentiel - Diffusion interdite sauf autorisation expresse d’Eurobios

(14)

Benefits for RFI (Rete Ferroviaria Italiana):

-

Rationalization of the timetabling construction

process which has been performed by hand until

now

- Proposition of improved timetables subject to a

number of strategic objectives

- Saving time

(15)

euro

bios

complexity made simple

Thank you for your attention

www.eurobios.com

References

Related documents

The formulation composition was selected on Tween 80 ternary phase diagram and was modified by the addition of xanthan gum at different concentrations (0.0% – 1.0%).. The

The average price of the open market homes sold in the year to 31 March 2015 was £459,000 (2014: £400,000) and each of the Group’s developments average price is less than £1,000

The ASO AC members have maintained a deep involvement in ICANN community through representatives in the Cross Community Working Group (CWG) , ICANN Nominating Community (NomCom),

CpG methylation does not affect binding of the Sleeping Beauty transposase to transposon inverted repeats in vivo Transposition is a multistep process consisting of: (i) binding

The observed methylation changes suggest the neoplastic tissue may arise due to aberrant gene expression of genes normally silent in adrenocortical cells or the silencing

For all three isoforms (PcdhaC2, Pcdhb6, and PcdhgA8), cells expressing the double arginine/aspartic-acid mutants tested positive for cell aggregation ( Figure 6 C), indicating

From the microarray miRNA results, it was found that the 16 microRNAs that had altered expression due to increased ANXA7 expression have not been identified previously in