• No results found

A Project Scheduling Method Based on Fuzzy Theory

N/A
N/A
Protected

Academic year: 2020

Share "A Project Scheduling Method Based on Fuzzy Theory"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2 represents fuzzy earliest and latest times of events by using (6) and (15).

References

Related documents

The second, quantitative, first collected data from one hundred and three (103) individuals; then it uses SPSS 20 to practice PCAs that confirm the three dimensions

penicillin is presented. The patient had normal nnmunity and no demonstrable sequestered focus of infection but failed to respond to appropriate doses of intravenous

Human lung adenocarcinoma cell line A549 (13) was inoculated into healthy C57BL/6 mice for the establishment of bone metastasis model of lung cancer in this study

Antioxidant activity was corroborated by different assays, showing that the compounds present in the extracts act by different mechanisms (radical scavenger and iron

Simplified dynamic analysis of beams and slabs with tuned mass dampers Andrew Robertson MSc, CEng, MIStructE, MICE, Independent Civil and Structural Engineering Consultant,

As inline deduplication is performed and each node has its own independent CAS, it is possible to send only the new chunks over the network to the nodes with the most

The electrochemical properties study of the following conducting polymers: poly(4-aminobenzylamine) (P4ABA) and polyaniline (PANI) nanocomposites with copper maghnite