• No results found

STAR-SI Performance Management. Tools, Tips and Techniques. Frances Cotter, M.A., M.P.H. Jay Ford, Ph.D.

N/A
N/A
Protected

Academic year: 2021

Share "STAR-SI Performance Management. Tools, Tips and Techniques. Frances Cotter, M.A., M.P.H. Jay Ford, Ph.D."

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

(1)

STAR-SI Performance

Management

Tools, Tips and Techniques

Frances Cotter, M.A., M.P.H. Jay Ford, Ph.D.

(2)

Why Measure Change?

• Measuring change enhances process improvement by:

– Identifying which changes worked

– Understanding which changes resulted in the most significant improvement

– Identifying areas for improvement, and

(3)

Key Elements of STAR-SI

State Performance Management

• State level Access and Retention Performance Measures and Performance Targets

• Performance Outcome Tracking/Feedback – Access and Retention Outcomes

– State Diffusion Model Implementation

• Recognition for moving towards a culture of improvement • Application of Process Improvement tools through PI

(4)

Six Simple Rules of the Road

• Define measures

• Collect baseline data • Establish a clear aim • Collect data

consistently

A Change Project is One Level of Care, One Location, One Aim and A Specific Population

(5)

12 Key Data Elements

… Date of First Contact … Date of Client Discharge … Date of Clinical Assessment … Total Number of Days in

Treatment

… Client Level of Care … Total Units of Service Received … Date of Admission … Treatment Completion[1]

… Date of the 1st Post Admission Unit

of Service[2] … Gender … Date of the 2nd Post Admission Unit

of Service … Ethnicity … Date of the 3rd Post Admission Unit

of Service … Race … Date of the 4th Post Admission Unit

of Service … Age

[1]Treatment Completion equals Yes, Transfer or Other for all other reasons

(6)

Four GPRA Specific Outcomes

• Number of participants

• Number of admissions

• Average LOS

(7)

State Specific Measures

… Avg. Time to First Client

Treatment Session …

Assessment Conversion Rate

… Avg. Time to Assessment … Admission Conversion Rate

… Avg. Time from Assessment to 1st

Clinical Treatment Session …

% of Clients receiving a 4th Unit of Service in 30 Days of Admission

(8)

Other State Measure Examples

• Treatment completion

• Broken appointments for assessment

• Time from first to second OP Treatment Session

(9)

Establishing a Baseline

• Never start a project without it

• Define a clear starting point

• Use agreed-upon definition

(10)

Establishing an Aim

Be flexible

– Information suggests changing aim: change it – Aim is too ambitious: set a

realistic aim that still

challenges the agency to improve

– Aim is easily achieved: set a more ambitious aim that stretches the agency’s capacity to improve

(11)

Collect Data Consistently

• If possible, leverage state information systems

• If not, devise ways to collect information, but KEEP IT SIMPLE

(12)

Collect Data Consistently

• If it is PDSA Change Data, you should:

– ground change in day-to-day measurement – collect small samples over short time periods – pencil and paper is sometimes better to chart

progress

(13)

Key Elements of STAR-SI State Performance Management

• State level Access and Retention Performance Measures and Performance Targets

• Performance Outcome Tracking/Feedback – Access and Retention Outcomes

– State Diffusion Model Implementation

• Recognition for moving towards a culture of improvement • Application of Process Improvement tools through PI

(14)

Introductory Challenges

• Belief that the audience is familiar with the data or how to interpret data

• Display numbers so others can understand

• Interpret numbers so correct decisions are made based on them

(15)

Six Simple Rules of the Road

• Define measures

• Collect baseline data • Establish a clear aim • Collect data

consistently

• Chart progress: one chart, one message • Ask questions

(16)

Use Trend Lines

Time from 1st Contact to 1st Treatment

9.6 7.8 7.6 9.1 5.2 5.6 2.2 4 0 2 4 6 8 10 12

Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Months

(17)

Asking Questions

• Do the results look right? • What is the data telling us?

• Does it provide directions on how to proceed?

• What are you going to do about it? • Unsuccessful changes offer the

(18)
(19)

Evaluating State Diffusion

• Develop an ongoing infrastructure to support process improvement

• Ensure fidelity to the system

• Review and change data infrastructure to ensure it is meaningful

• Enable the partnership

– State and providers – Other partners

(20)

NIATx Tools

Outcomes

– NIATx/GPRA Spreadsheet

Change Projects

– Quick Start Guide

– Change Project Form

– Provider Change Project Report

(21)

STAR-SI Reporting Requirement

Core Access and Retention Measures

Implementation of the NIATx State

Diffusion Model

(22)

Core Access and Retention Measures

Six Core Measures

– Four GPRA measures:

– Two state-specific measures (minimum)

Two Report Formats:

– Semi-annual progress report: all grantees

– Core measure performance targets and outcomes summary

GPRA Report: CSAT grantees only

– Four GPRA Measures only

(23)

Grantee Reporting: Implementation of State Diffusion Model

Semi-annual Progress Report

– Living document

– Standardized format for each model component

– To be designed as a management tool useful to states

– Primary source for project officer evaluation of performance

(24)

Grantee Reporting:

Grant Implementation

Semi-Annual Progress Report

– External factors impacting grant implementation

– Changes in key staff

(25)

Project Officer Role

• STAR-SI is a Cooperative Agreement

– Significant Project Officer guidance/input

• Fidelity to NIATx State Diffusion Model • Setting and/or modifying core measure

performance targets

• NIATx technical support services

References

Related documents

In our model, main banks play the role of reducing the lenders’ demand for accounting conservatism by reducing information asymmetry.. We find that main banks can reduce the

The second aim is to show step- by-step the methodology design for the discrete-time case when the set-valued maximal monotone operators are used together with the implicit

However, such SHRM required man- agement style and employee attitude uncommon for the Russian environment: as suggested Gibbs and Ashill (2013, p. 317), employees in many

Keywords: Simulation, simulation software, instrumental systems for simulation, special purposes simulation systems, web-based simulation, parallel and distributed

However, the rest 21 items of 25 item tests consider to have perfect discrimination index between both upper and lower group of all new admissions of English Entrance

As one of the key integrated components for Gallagher systems, Controller 6000 provides distributed intelligence in the field, managing access control and security

Figure 7.20 - Sunulated transverse diffuse scan for a GaAs grating generated using the Bede REFS code and the model developed for the coherent scatter from a single surface. As can