• No results found

3. QUALITY ASSURANCE REQUIREMENTS

N/A
N/A
Protected

Academic year: 2021

Share "3. QUALITY ASSURANCE REQUIREMENTS"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 3.1: Construction Quality Documentation Requirements
Table 3.2: Hold Points
Table 3.4:  Drawing Scales

References

Related documents

As noted in the Literature Review, above, scholarship on the determinants of foreign direct investment (FDI) variously argue the influence of GDP growth, the openness of a

Visoke koncentracije ortofosfata, kao što su one izmjerene u rujnu u piezometrima Zelendvor (2,01 mg/L), PDS-5 (2,55 mg/L) i PDS-7 (3,5 mg/L), mogu ukazivati na onečišćenje

This conclusion is further supported by the following observations: (i) constitutive expression of stdE and stdF in a Dam + background represses SPI-1 expression (Figure 5); (ii)

• Follow up with your employer each reporting period to ensure your hours are reported on a regular basis?. • Discuss your progress with

Marie Laure Suites (Self Catering) Self Catering 14 Mr. Richard Naya Mahe Belombre 2516591 info@marielauresuites.com 61 Metcalfe Villas Self Catering 6 Ms Loulou Metcalfe

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

However, obtaining bacterial genomic information is not always trivial: the target bacteria may be difficult-to-culture or uncultured, and may be found within samples containing

4.1 The Select Committee is asked to consider the proposed development of the Customer Service Function, the recommended service delivery option and the investment required8. It