• No results found

Version: 1.0. Effective From: 24/06/2013

N/A
N/A
Protected

Academic year: 2021

Share "Version: 1.0. Effective From: 24/06/2013"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)

              Policy No:  OP77    Version:  1.0                Name of Policy:  Web Management Policy      Effective From:  24/06/2013                  Date Ratified  06/12/2012  Ratified  Business and Service Development Committee  Review Date  01/12/2014  Sponsor  Director of Transformation and Compliance  Expiry Date  05/12/2015  Withdrawn Date          This policy supersedes all previous issues.     

(2)

Version Control   

 

Version  Release  Author/Reviewer  Ratified  by/Authorised  by  Date  Changes   (Please identify  page no.)  1.0    24/06/2013  Lucia Hiden  Business and  Service  Development  Committee    06/12/2012     

(3)

Contents    Section  Page    1  Introduction ... 4    2   Policy scope ... 4    3  Aim of policy ... 4    4  Duties (Roles and responsibilities) ... 4    5  Definitions ... 5    6  Web management policy ... 5  6.1  How the new website will be managed ... 5  6.2   How the website will be developed ... 5  6.2.1   Analytics ... 5  6.2.2   Requests for development or new sections ... 6  6.2.3   Content management system training ... 6  6.2.4   Management of out of date information ... 6    7  Training ... 6    8  Equality and diversity ... 7    9  Monitoring compliance with the policy ... 7    10  Consultation and review  ... 7    11  Implementation of policy (including raising awareness) ... 7    12  References... 7    13  Associated documentation (policies) ... 7    Appendices    Appendix 1   Web development request proforma ... 8  Appendix 2   Website content controller ... 11     

(4)

Web Management Policy      Introduction    The Trust has recently invested both financially and in staff resources in a new website  development for the Trust. This is viewed as being a key marketing tool for the  organisation which promotes our services, our hospital, our ethos and our new branding.    The decision was taken to make this investment as the previous site was un‐wielding and  unmanageable. It had grown out of control and contained information that was inaccurate  and out of date.    To ensure this is not repeated with the current site, the Trust invested in specialist external  expertise to deliver a high quality, easy to navigate product. It is supported by a content  management system which enables key personnel to make changes and developments to  the website quickly, easily and consistently.    The website will be managed by the communications team with support from the technical  web developers through the web development group.    This policy is required to manage the website appropriately to ensure it continues to meet  the current high standards.    Policy scope    This policy will demonstrate how to:  • Set out a system for managing requests and developments  • Keep quality control and assurance over the site  • Prevent site swelling and ensure consistency  • Prioritise new developments  • Keep the effective operations of the website high on the agenda of the Central  Team and others as a key marketing tool for the organisation.    Aim of policy    The policy relates to all staff across the Trust who wish to contribute to content on the  Trust’s external website.    Duties ‐ roles and responsibilities    Trust Board  The Trust Board is asked to support the aims of the web development policy and the web  development group in its implementation.     Chief Executive  The chief executive is the primary advocate of the new website and as such takes a lead  role in supporting its continued high standard of development.   

(5)

Executive Directors  Executive directors are asked to ensure support for the website by ensuring services  adhere to the web development prioritisation process (outlined later in this policy) and be  mindful of the content review process (also outlined later in the policy).    Divisional Managers and Divisional Directors  Divisional managers and directors are asked to ensure support for the website by ensuring  services adhere to the web development prioritisation process (outlined later in this policy)  and be mindful of the content review process (also outlined later in the policy).    Heads of Department  Heads of departments are asked to ensure support for the website by ensuring services  adhere to the web development prioritisation process (outlined later in this policy) and be  mindful of the content review process (also outlined later in the policy).    All staff  Staff are expected to adhere to the web development prioritisation process and to support  web development group members fully in the development of web requests.    Definitions    Web development group – the operational group tasked with the management,  development and analysis of the website.    Web management policy details    6.1  How the new website will be managed  Following the successful launch of the website in October 2012, the web  development group has been re‐started to manage the new website. This group is  chaired by the head of communications and administrated by the communications  officer. Membership consists of communications staff, web development officers,  information lead and IT. The minutes of this group will feed into both the IM&T  Committee and the Business Services and Development Committee.    The group will have the authority to make decisions concerning web development,  the prioritisation of new web developments and will provide information and  feedback across the organisation to support further development. Its terms of  reference are centred around implementing the actions required from within this  policy, how to use the specialist knowledge and skills of the group to ensure a high  quality website which is constantly evolving, how to manage new requests and how  to manage ensuring information is consistently kept up to date. The group will have  responsibility for ensuring the access needs of diverse patient groups are taken into  consideration as part of the development of the website.    6.2   How the website will be developed    6.2.1   Analytics  A dashboard will be developed based on the information provided through  Google analytics on visits to the website. This dashboard will be analysed at 

(6)

each Web Development Group and fed back to the IM&T Committee and the  Business Service and Development Committee on a quarterly basis. The  information will be used to inform decision making on prioritisation of key  marketing information and development of more popular sections as well as  decisions around prominent placing of sections.     6.2.2   Requests for development or new sections  All requests from services will be managed through the completion of an  application form (attached as appendix one) which outlines the prioritisation  criteria which will be awarded to each request.    The proformas will then be discussed and marked by the web development  group and prioritised accordingly. The priority will be based on:  • Meeting corporate, statutory and marketing objectives  • Improving the patient experience  • Time, commitment and resources involved  • Financial savings/ benefits  • Support from the requesting team.    Simple updates, such as a few paragraphs, changes to a phone number or to  add an image, will be managed on ad hoc basis by the communications  team.    6.2.3   Content management system training  Training on the use of the website’s supporting content management system  will be provided through the web development team to key individuals.  These will be people who have many requests for uploading information or  who have shown a particular interest and aptitude in the management of  their department’s web section.    With notable exceptions (such as the membership officer in relation to the  web management of policies), only the communications team will retain the  ability to publish to the website. This is to ensure consistency, quality and  ease of language and navigation.     6.2.4   Management of out of date information  The management of information is a key aspect to ensuring the consistent,  high quality of the website.  A flow chart which outlines the process for  managing up to date information is attached as appendix two. The  communications team will take responsibility for managing this process.    Training    Any training requirements in relation to the content management system will be carried  out by the communications team. There are no other training requirements.     

(7)

Equality and diversity    The Trust is committed to ensuring that, as far as is reasonably practicable, the way we  treat members of staff and patients reflects their individual needs and does not  discriminate against individuals or groups on the grounds of any protected characteristic  (Equality Act 2010). The aim of this policy is to enable patients and other key stakeholders  to access a range of information.    All patients have the right to access the facilities and services provided by the Trust, and an  equality analysis has been undertaken to consider how this policy can promote equality of  access to information for patients from diverse backgrounds.    Process(s) for monitoring compliance with the policy    Standard / process  / issue  Monitoring and audit 

Method  By  Committee  Frequency 

Monitoring use and  statistics to aid  future development    Google Analytics  and specialist  report  Web  Management  Group  BSDC  IM&T  Quarterly    10  Consultation and review    This policy has been reviewed by the members of the web development group    11  Policy implementation (including awareness raising)    Awareness of the policy will be done through a new web management section on the  intranet which will include a downloadable version of the prioritisation chart. An article  outlining the process will also be included in QE Weekly.    12  References    None.    13  Associated documentation    Attachments mentioned above.   

(8)

Appendix 1       

Web development request proforma 

 

This  proforma  must  be  completed  before  any  work  commences  on  a  new  web  development  request or significant changes are made to an existing section. All requests will be discussed by the  Web Development Group, which meets on the first Thursday of the month.    Please note that for requests requiring significant input or technical expertise, we may need to use  our external website partner and there may be a cost implication to this which would need to be  met by the requestor’s department.    Requestors will then be contacted by a member of the group to inform you of the priority given to  your  request  and  an  approximate  timescale.  The  criteria  the  group  works  to  is  attached  as  appendix one to this form. 

 

Any  queries  relating  to  the  completion  of  this  form  should  be  directed  to  Kerri  James  Communications Officer, on ext 3561, email [email protected]     Please note – this process currently applies to the external site only.    Details:  Name:    Department:    Extension number:    Date of application:    Section of the website  this request applies to:      Request information:  Please provide an  outline of the changes  you wish to make or the  new section you wish to  develop:    How will this  development help meet  your department’s  priorities?    How will this  development help to  meet the prioritisation  criteria outlined on  appendix one?   

(9)

How much staff  commitment and  resources is available  from within your  department to this  development?    Please indicate a  timescale you would like  to see this development  go live? (Please note,  this may not be  achievable depending on  the commitments and  resources available to  the web development  team)    Please provide any other  information you think is  relevant         

(10)

Web development prioritisation criteria 

  These questions will be answered by the Web Development Group and used to inform the priority  awarded to the request ranked from one as low to five as high.    Title of development request:    Name of requestor:      Does the request fit with the Trust corporate objectives?              Does the request fit with the service’s key objectives?              Are there external timescales/ factors influencing the development?              What level of commitment will the development require from the web  development group?            What level of commitment is evident from the service?              Will the development enhance a high quality patient experience?              Total score:      Web Development Group lead:        Does the development contribute to the service’s cost reduction programme?      Scores:    The following score levels will be applied to inform the priority of your request:  7 – 16 ‐ low  17 – 26 ‐ medium  27 – 35 – high.   

(11)

Appendix 2       

Website content controller  

  Create email distribution  list of everyone on website  that contributes to a  section. 102 sections in  total Every six months, from  July 2013, email owners to  ask if they have any  content that needs  updated  Ask owners to reply, either  to say their pages are  current, or with the  changes they'd like to be  made. If significant they  will need to fill in the  proforma Page owners have one  month to respond to initial  email Page owners that don't  reply within one month  are sent a second email  and given a further two  weeks to respond They are warned in the email  that if they don't respond, all  non generic information  which could potentially be  out of date such as contact   details and processes, will be  removed. If no response, information  removed as we can no longer  guarantee its accuracy Next round of updates would  then begin in January. The  whole process should only  take three months.

References

Related documents

[To be inserted in tenders for Works contracts, including Turnkey contracts] The successful bidder shall not be allowed to sub-contract works to any contractor from a

Enhanced day to day cover Insured Network Benefit significantly enhances members day-to-day cover once their annual savings deposit is Enhanced day-to-day

Since insulin-like growth factor 1 (IGF1) controls postnatal growth, we tested whether the CG methylation of the two promoters (P1 and P2) of the IGF1 gene is a potential

AEP Texas Central Company 2013 Residential Air Conditioning Distributor Pilot Page 2 Incentive Levels: Climate Zone 3 (South Region) and Climate Zone 2.. Residential

Cable Television Franchise Fund (Cable Fund) revenues are generated by franchise fees from cable television providers and these funds support limited activities provided by

Hasil penelitian menunjukkan bahwa terdapat hubungan antara self-efficacy dan metakognitif dalam pembelajaran siswa SMA pada konsep Genetika, selain itu juga terdapat

She is a member of the American Bankruptcy Institute, the International Women’s Insolvency and Restructuring Confederation, the Delaware Bankruptcy Inns of Court, and the

The objective is to determine an optimal common production cycle time that minimizes the long-run average cost per unit time for such a specific multi-item EPQ model with