MAP-21 Performance Measures

ACPA perspective

NCC , Asheville, NC, September 24th, 2013

Leif Wathne

(2)

Talking Points

What Congress wants…

Industry efforts

What is a good measure?

What about IRI?

What about RSL?

Closing thoughts

(3)

What Congress Wants – MAP-21

Sec 1203, §150 DECLARATION OF POLICY.—

… provide a means to the most efficient investment of Federal transportation funds …, and improving project decision making through performance based planning and programming.

(c) Establishment of Performance Measures

(3) (A) (ii) …establish measures for States to use to assess (I) the condition of pavements on the interstate system (II) the condition of pavements on the NHS

(4)

FHWA Efforts

Pavement Performance Measure Rule • Propose and define pavement condition measures, along with minimum

condition standards, target establishment, progress assessment and reporting requirements.

(5)

Concrete Pavement Industry Efforts Engage with FHWA

ETG formation? Policy Office Infrastructure

AASHTO JTCoP

Dialogue with Congress

EPW and T&I staff briefing

(6)

Concrete Pavement Industry Efforts

Established ACPA Performance Measure Task Force

Review ongoing efforts Evaluate options

Make recommendations – ONGOING…

Input to the USDOT Draft Strategic Plan

(7)

WHAT IS A GOOD MEASURE?

(8)

AASHTO’s Recommendations

AASHTO SCOPM Task Force on Performance Measures

Interstate rating of good, fair and poor based on

IRI

NHS rating of good, fair and poor based on IRI Pavement Structural Health Index based on

rutting, faulting and cracking (over next several years)

(9)

IRI as a Performance Measure – Why? Ready for implementation

Applicable for both asphalt and concrete

Already being collected

Can be collected with single piece of equipment …but, IRI does not account for the “structural” condition of the pavement, so a Structural Health Index must be developed.

(10)

IRI as a Performance Measure – Challenges IRI only gives point-in-time measure

IRI only addresses the functional component, so is not comprehensive

IRI is a delayed performance indicator – by the time IRI is unacceptable, rehabilitation should have been performed!

(11)

What about Remaining Service Life?

Remaining Service Life (RSL) defines how long

the public will be able to use the pavement segment.

While use of IRI, faulting and cracking can be important to the performance measure process, the use of RSL can enhance this pavement

condition data by demonstrating the time until rehabilitation is necessary.

(12)

Remaining Service Life

Pavement Health Track (PHT) tool (FHWA, 2010) Remaining Service Life Forecasting Tool

http://www.fhwa.dot.gov/pa vement/healthtrack/

KEY: Monitor Condition – Forecast the Future.

RSL – main performance Indicator

(13)

Remaining Service Life?

Remaining Service Life (RSL) is the number of years before rehabilitation is required for any given pavement section.

• A RSL=10 means that it is 10 years to

next rehabilitation for that segment

• RSL of a new pavement is equal to the

pavement design life

• A pavement with a condition worse

than the target has an RSL = 0

• What is the current condition of my pavement network?

• How does the current condition compare to the required level of

service/performance?

• Which individual pavement sections are critical to sustained performance? • What are my best "operations and maintenance" and "capital improvement”

investment strategies to ensure sustained performance over the short to medium time horizon?

• What is my best long-term funding strategy to ensure sustained performance?

Target /Min. Acceptable Rating

P av em ent C ondi ti on

Current Age Next Rehab

Initial Const. or Last Rehab

x

Current Level

(14)

RSL – NOT a substitute for condition measure Pavement distress data is not universal or standardized

• RSL converts performance measure into an operational measure that

tells how well the pavement is serving the public.

• RSL can take into account both Ride (IRI) and Structural Condition • RSL is “Flexible” and allows State DOT’s to use their current data and

lets them set Individual Condition Targets

Accounts for Changing Conditions

• Two pavement sections

having the same

condition (IRI) are not necessarily equal

• They will require

different management strategies

• RSL takes into account

“rate of deterioration”

• Keeps agencies from

doing “band aid approaches” just to improve the condition

Target /Min. Acceptable Rating

IR I C ondi ti on ( in/ m i) Current Age Next Rehab Initial Const. or Last Rehab Current Level RSLA Pavement A Pavement B RSLB x

(15)

How do you determine segment RSL?

Use Current Conditional & Performance Data

RSL builds on each DOT’s “condition” measures already being used

For each roadway segment, DOT

determines “Time to Next

Rehabilitation” for each distress

Time to next rehab (IRI) = 16 yrsTime to next rehab (cracking) = 12yrsTime to next rehab (faulting) = 10 yrs

Distress targets are set by each state DOT

Performance predictions are based on

modeling (Pavement-ME models, LTPP Models, FHWA PHT, state models, straight line predictions, etc.)

Target 16 years 0% 3% 6% 9% 12% 15% 18% 20 00 20 04 20 08 20 12 20 16 20 20 20 24 20 28 20 32 20 36 Segment Cracking Cracking Crack Predict 12 years 0.03 0.06 0.09 0.12 0.15 0.18 20 00 20 04 20 08 20 12 20 16 20 20 20 24 20 28 20 32 20 36 Segment Faulting Faulting Fault Predict 10 years Se gm ent RSL = 10 year s

(16)

Combine data into Network RSL Segment 1 RSL = 10 years 10 Miles (0.02% of system) Segment 2 RSL = 27 years 5 Miles (0.01% of system) Segment Xi RSL = Ti years 10 Miles (0.02% of system) . . . 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 0 4 4 8 8 1 2 12 16 16 20 20 24 24 - 28 28 32 32 36 % o f Pa v e men t N e tw o rk 2012 RSL (Lane-mile-years) Network Length = 3849 Lane Miles Network RSL = 51,269 lane-mi-yrs Avg RSL = 13.3 years

Remaining Service Life (before repairs are needed)

Represents average time between rehab for any given section

(17)

Benefits of Increased Network RSL

Higher RSL networks deliver more value than lower RSL networks…

Increasing RSL means average years of service for network is increased

This reduces network’s annual cost, as there are

fewer pavements to rehabilitate each year.

Objective: Select activities that increase

(18)

RSL as a Pavement Performance Measure

RSL adds a time element to the traditional

performance measures - can distinguish between pavements of same condition but different worth Intuitive measure – (18 is better than 11)

It is a multi-condition measure – based on existing state data

No need to develop universal distress data Can be used to determine best investment strategies and projections

Is applicable to other performance provisions in MAP-21 as well…

(19)

Thank you!

Thank you to the ACPA

Performance Measure Task Force – especially Jim Mack ACPA Celebrating 50 years… would love to see you in

Puerto Rico!

December 4-6, 2013 Rio Mar Resort

(20)

Comments - Questions?

www.acpa.org

apps.acpa.org | ACPA Application Library

local.acpa.org | ACPA-affiliated Chapter/States

resources.acpa.org | Concrete Pavement Resource Center

References

Related documents

Request approval to 1) accept a grant award from, and enter into a grant agreement with, the American Psychological Association Board of Educational Affairs to pursue accreditation

Esta política educativa consiste en varias medidas: (a) se debe autori­ zar a los apoderados a elegir la escuela pública que prefieran; (b) se faculta a dichas escuelas

This study aims to research into whether the Taiwanese-Mandarin bilingual aphasic patients with the selective recovery pattern lose the knowledge of the inaccessible language or

If you’re a beer buff, take a guided tour at Deschutes Brewery to learn more about how the craft beer scene got its start in Central Oregon, then visit a few.. of the city’s

¶65. RSL claims that these amended orders were required by Aviva's desire that its records reflect the correct payment recipient – RSL, not Woodbridge or BOI. Thus, RSL claims that,

TEMCO FIREPLACE PRODUCTS DIRECT VENT FIREPLACES INSTALLATION AND STARTUP CHECKLIST.

Line design loads applied to post insula- tors often include tension, or compression, in addition to the primary vertical cantilever load.. In addition, some longitudinal load

As it says in the City’s General Plan, “When surveyed, City residents have repeatedly placed open space and environmental conservation high on the list of community goals, values,