Decision support systems in forest management: requirements from a participatory planning perspective
Full text
Related documents
After serious initial doubts about PRINCE2’s suitability for such a large infrastructure project, the Authority’s Chief Executive, members of the Authority’s Procurement Office
This article aims at exploit- ing differences between full-term and preterm infant cry with robust automatic acoustical analysis and data mining techniques..
We hypothesize that (a) following AIS, children will have particular difficul- ties with attention and executive function skills on performance-based assessment and behavioral
in 1991, which then became the main problem facing the Libyan economy. 1 of 1993, the Central Bank of Libya is entitled to offer favourable interest rates to projects
Not only because of my amazing experience at adidas Group, where I worked as an intern in the Global Operations & Strategy department, or because I was the Sports Business
In the wake of cases challenging the role of the Federal Trade Commission (the “FTC” or “Commission”) and the scope of its authority in regulating cybersecurity,
The total commitments in transport sector (including technical assistance for studies in transport sector) in 2005 amount to € 492.8 million of which € 93.9 million were
Digital terrain models from airborne laser scanner data – a grid based approach. Global synthesis of the