INSTALLATION QUALIFICATION PROTOCOL
For the
NEW PURIFIED WATER SYSTEM
Prepared by
TABLE OF CONTENTS
1.0 PURPOSE AND OBJECTIVE(S) ... 4
2.0 BACKGROUND ... 4 3.0 SCOPE ... 4 4.0 REFERENCES ... 4 5.0 RESPONSABILITIES ... 5 5.1 Validation Specialist ... 5 5.2 Quality Dept. ... 5 5.3 Facility Dept. ... 5 6.0 METHODOLOGY ... 6
6.1 Verification Data Sheet ... 6
6.2 Deviation Report ... 6
6.3 Signature Log Sheet ... 6
6.4 Test Instruments Calibration ... 6
7.0 EQUIPMENT/PROCESS DESCRIPTION ... 7 7.1 Water Softener ... 7 7.2 Ozone Generator ... 7 7.3 Reverse Osmosis ... 7 7.4 Mixed Bed... 7 7.5 Ozone Destructor ... 7 7.6 De-gasifier ... 8 7.7 UV light ... 8 7.8 Filter ... 8
APPENDIX I: DEVIATION REPORT ... 11
APPENDIX II: SIGNATURE IDENTIFICATION LOG SHEET ... 12
APPENDIX III: TESTING INSTRUMENTS LOG SHEET ... 13
IQ-01 EQUIPMENT VERIFICATION ... 15
IQ-02 DOCUMENT INVENTORY VERIFICATION ... 37
IQ-03 DRAWING VERIFICATION ... 56
IQ-04 SYSTEM DESIGN VERIFICATION ... 58
IQ-05 PLACEMENT VERIFICATION ... 60
IQ-06 UTILITY VERIFICATION ... 67
REVISION HISTORY
1.0 PURPOSE AND OBJECTIVE(S)
This protocol (___) intends to provide documented evidence that the new Purified Water System
was installed according to manufacturer’s specifications and ___ ___ requirements.
This Installation Qualification will provide documented evidence that all key aspects of the Purified
Water System equipment’s assembly and its auxiliary systems is as intended by manufacturer
design and in accordance to ___’s requirements.
At the end of the execution activities, a final report will be developed with a summary of the
executed tests results and the recommendation(s) necessary for the Installation Qualification.
Potential risks involved with the new Purified Water System installation when connected to the
manufacturing processes has already being evaluated by Risk Assessment PLS 0410.
2.0 BACKGROUND
In order to meet the new purified water utility demands at ___ I in ___ ___, ___ ___, a new purified
water system was purchased to replace the existing system. It is expected that this new purified
water system will increase the supply to up to 100 GPM. Additionally, it is intended to produce a
water quality that meets or exceeds current Purified Water USP and EP standards.
3.0 SCOPE
This protocol applies to the new equipment and auxiliary components that constitute the Purified
Water System, installed at ___ in ___ ___, ___ ___
4.0 REFERENCES
5.0 RESPONSABILITIES
5.1 Validation Specialist
• Prepare the documents that are applicable to the Validation exercise
• Coordinate efforts and resources, along with Facilities Dept., to perform the Validation
exercise
• Execute and collect the verification data for the Validation protocol
• Verify data against Acceptance Criteria and initiate deviation, as applicable
• Investigate, justify, and correct any deviation encountered during Validation execution
• Prepare validation Final Report
5.2 Quality Dept.
• Evaluate with the originator the extent of the validation required
• Review and approve documents for the validation exercise
• Review and approve validation activities for compliance and adherence to ___’s policies,
practices, and procedures
• Check that the collected data meets the acceptance criteria and that all the deviations (if
applicable) are properly resolved
• Once executed, review any deviations generated to confirm that investigation and
resolutions are complete
• Cooperate with Validation Specialist to investigate, justify, and correct any deviation
encountered during Validation execution
• Review and approve Final Report
• Maintain original validation documentation, except for drawings and equipment manuals
that will remain in the equipment information files
• Store the Validation Package in a designated filing area
5.3 Facility Dept.
• Review and approve documents for the validation exercise
• Coordinate efforts and resources to perform the validation activities
• Supply documentation and tools needed for the protocol execution
• Provide training in this protocol to all employees involved (internal and external) during the
execution of this protocol and ensure that all signatures are collected on Signature Log
Sheet
• Assist to document, investigate, justify, and correct any deviation encountered during the
IQ protocol execution
6.0 METHODOLOGY
6.1 Verification Data Sheet
All data resulting from test execution will be entered in Verification Data Sheets that will
pre-define the objective(s) to be attained with the verification, the procedure that will be followed
to reach such objective(s), the reference material to be used, and the criteria to evaluate as
to accept or not the testing results. All data entry will be properly signed and dated by the
executor in the “Performed By” and “Date” spaces. In cases where a Field Verification is
requested, a “Fail” condition will be applied to unverifiable information.
The comments/observations section included in each Data Collection Form will be used to
describe any additional information considered of importance for describing the validated
condition and/or discrepancies and resolution activities produced during the execution. The
comments/observations included must be signed or initialed and dated.
When the test execution is finished, a subject matter expert will sign and date on the
“Reviewed by” and “Date” spaces respectively, to state the completeness and correctness of
the data.
6.2 Deviation Report
The following deviations must be documented using the Deviation Report Form attached to
this protocol:
• Results invalidated and/or not in compliance with their pre-established Acceptance Criteria
• Testing procedure and/or sampling plan not followed or that could not be completed as
planned
These deviations will be handled as per ___ ___ PR
The investigation process due to deviated sampling results will be handled by contract
laboratory, following their own investigation procedures. These incidents will be informed to
who oversees the validation project in ___ ___, ___ PR, which in turn will open a deviation
report to follow the lifecycle of the investigation and to implement any possible changes due
to investigation resolution.
Typographic, text edit and syntax errors will be documented as such in the “Comments”
section under the corresponding test script, and considered as a minor issue that may not
invalidate a test or become cause for writing a deviation report. These will be explained in the
Final Report.
6.3 Signature Log Sheet
Each individual who signs or initials any page included in this protocol shall be identified
using the Signature Log Sheet by type/printed name, full signature, written initials and
department represented.
7.0 EQUIPMENT/PROCESS DESCRIPTION
Purified Water
▲is water obtained by distillation, ion-exchange treatment, reverse osmosis, and
other suitable processes. It is prepared from water complying with the regulations of U.S.
Environmental Protection Agency (EPA) with respect to drinking water. It contains no added
substances.
The Purified Water system includes the following equipment, along with associated components:
• 30 um filters (2) • 6, 000 and 8, 000 Gal. Tanks
• 1 um filters (4) • Distribution Pumps (4)
• 0.2 um filters (4) • Dual Reverse Osmosis unit
• Dual Softener unit • Dual Mix Bed unit
• Ozone Generator • UV lamps (4)
• Ozone Destructor • Degasification unit
• Microza filters (18)
7.1 Water Softener
The Water Softener reduces the levels of calcium and other scale creating elements from the
process stream. Water softeners also remove aluminum, copper and other trace metals. The
removal process occurs by ion exchange. The softener vessel is filled with sodium form cation
resin. The calcium, magnesium, barium, strontium, and other ions removed by the resin are
replaced with sodium ions. The cation resin has a fixed capacity for ion removal and must be
regenerated when that capacity has been exhausted.
7.2 Ozone Generator
The Ozone Generator is employed to produce the Ozone used to sanitize the Softened Water
that passes through to the 6,000 Gallon Tank.
7.3 Reverse Osmosis
The Reverse Osmosis unit processes water by means of semi-permeable membranes, which
allow pressurized water to freely pass through the membranes, but almost totally reject
dissolved and suspended substances in the feed water.
7.4 Mixed Bed
The Mixed Bed de-mineralizes water by using the ion exchange process. The influent water
passes through a bed of Cation and Anion resin that are intimately mixed. The mixed bed
configuration functions similarly to a two-bed configuration in regards to the ion exchange
process; however, it is much more efficient and therefore produces water of much greater
7.6 De-gasifier
De-gasifier membranes are employed to reduce the oxygen level of the water. Membrane
contactors make it possible to transfer gas from an aqueous stream without dispersion. By
virtue of surface tension, the water on one side of the membrane is exposed to the gas side of
the membrane with no liquid transfer, providing a large surface area for gas/liquid contact and
transfer. Dissolved O
2passes from the water surface into the gas side by diffusion and is
swept out by a combined vacuum/air flow.
7.7 UV lights
Ultraviolet lamps produce UV-C (germicidal UV), which is a radiation that when harmful
microbes are exposed to the UV rays, scrambles the DNA structure of the organism,
rendering it sterile and can no longer reproduce.
Almost all of a UV lamp’s output is concentrated in the 254 nanometers (nm) region in order to
take full advantage of the germicidal properties of this wavelength. The lamp is mounted such
that water passing through a flow chamber is exposed to the UV-C light rays.
7.8 Filters
At the first stage, the raw water enters a 30 µm pre-filter to trap any heavy sediment before it
enters the softeners. The 1 µm filters will act as a resin trap and removes suspended from the
softeners. The absolute 0.2 micron rated filters significantly enhances the water quality with its
capacity to remove the majority of microorganisms. The Microza ultra filters that are at the end
of the purified water system uses fiber hollow technology that will remove endotoxins and
viruses.
7.9 Distribution Pumps
Two pairs of distribution pumps will provide constant flow of the processed water throughout
the Purified Water System pipelines. Although its functionality will not contribute directly to the
processing of Purified Water, by providing a constant flow will indeed significantly reduce the
chances of microbial growth due to stagnant water.
7.10 Tanks
Two storage tanks will provide storage capacity to the Purified Water System. A 6,000 gallon
tank will store ozone-treated softened water that will supply constant feed to the dual R.O.
unit, while an 8,000 gallon tank will store water post reverse osmosis and de-ozonization
treatment, which will supply constant feed to the main loop.
With this configuration in place, a Purified Water (USP, EP) quality is intended to be achieved through the following processes:
• Filtration (by means of 30 um filters, 1 um filters, 0.2 um filters, and R.O. Unit, and “Microza” filters)
• Ion exchange (by means of Softener and Mix Bed)
• Sanitation (by means of Ozone Injection and UV light radiation)
• Degasification (by means of a de-gasifier unit)
DEVIATION DESCRIPTION
Deviation reported by:_________________________________ Date: _________________ ENGINEERING INVESTIGATION
Attach additional pages, if necessary
Root Cause:
□
Manpower□
Methods□
Equipment□
Materials□
EnvironmentCORRECTIVE / PREVENTIVE ACTION
Evaluation performed by:____________________________________ Date: _________________ Testing required after Corrective action implemented? (YES/NO) ______________
Test results (PASS/FAIL/NA) ________________
APPENDIX I: DEVIATION REPORT
Deviation Number: _________________ Test Description/Test Number:
APPENDIX II: SIGNATURE IDENTIFICATION LOG SHEET
This sheet is intended to record each individual who takes part of the execution process and is not
included in the front page. The scope of this sheet applies to anyone who signs or initials any page
included in the attached qualification documents. Each person shall be identified by typed or printed
name, full signature, written initials, and department represented.
APPENDIX III: TESTING INSTRUMENTS LOG SHEET
This sheet is intended to record all field test instrument that assists in the execution process.
INSTRUMENT ID DESCRIPTION TEST ID CALIBRATION
DATE/DUE DATE COPY OF CERTIFICATE ATTACHED? (YES/NO) PERFORMED BY/DATE
VERIFICATION DATA SHEETS
INSTALLATION QUALIFICATION
MAIN COMPONENT VERIFICATION
IQ-01
Objective:
• Assure that all main and auxiliary components of the Purified Water System are as per
manufacturer/vendor specifications (Manuals, Spec sheets, P & ID’s, etc.)
Pr
a. Per equipment, collect and document the required information thru physical inspection (tag,
engrave, plate, sticker, etc)
ocedure:
b. Evaluate findings against specifications
References Required:
• Note: Vendor/Manufacturer documentation (Manuals, Spec sheets, P & ID’s, etc.) does not
count as “Actual Result” reference
Acceptance Criteria:
MAIN COMPONENT VERIFICATION
IQ-01
Filter set 1A & 1B
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 1A Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity 1B Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Filter set 2A & 2B
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 2A Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity 2B Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Filter set 3A & 3B
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 3A Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity 3B Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Filter set 4A & 4B
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 4A Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity 4B Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Filter set 5A & 5 B
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 5A Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity 5B Tag ID Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. Quantity Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Ozone Generator
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Model Serial No. B oos te r pu m p Tag ID Manufacturer Model Serial No. R eci rcu lat io n p u m p Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Ozone Destructor
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Model Serial No. U V l ight Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual Softener unit
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Un it A Tag ID Manufacturer Model Serial No. Un it B Tag ID Manufacturer Model Serial No. C o n tr o l P a n e l Manufacturer Model R esi n Type Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual Softener unit (Brine Tank)
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
6,000 Gal. Tank
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Description V e n t F il te r Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. L evel Manufacturer Part No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Distribution Pumps (1A, 1B)
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 1A Tag ID Manufacturer Model Serial No. 2A Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
8,000 Gal. Tank
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Description V e n t F il te r Cartridge Manufacturer Cartridge Part No. Housing Manufacturer Housing Part No. L evel Manufacturer Part No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Distribution Pumps (2A, 2B)
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 2A Tag ID Manufacturer Model Serial No. 2B Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
UV lamps (1A, 1B)
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 1A Tag ID Manufacturer Model Serial No. 1B Tag ID Manufacturer Model Serial No. Comments/Observations:
EQUIPMENT VERIFICATION
IQ-01
UV lamps (2A, 2B)
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE 2A Tag ID Manufacturer Model Serial No. 2B Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual Reverse Osmosis (Service unit A)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Tag ID Manufacturer Model Serial No. Fe e d P um p Tag ID Manufacturer Model Serial No. A n ti scal an t D o s in g S yst em Tag ID Manufacturer Model Serial No. C ont rol P a ne l Manufacturer Model Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual Reverse Osmosis (Service unit B)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Tag ID Manufacturer Model Serial No. Fe e d P um p Tag ID Manufacturer Model Serial No. A n ti scal an t D o s in g S yst em Tag ID Manufacturer Model Serial No. C ont rol P a ne l Manufacturer Model Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual R.O. unit (Cleaning Skid)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Tag ID Manufacturer Model Serial No. C le a ni ng P um p Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
De-gasification unit
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Model Serial No. Pu m p Tag ID Manufacturer Model Serial No. Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Dual Mixed Bed unit
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Un it A Tag ID Manufacturer Model Serial No. Un it B Tag ID Manufacturer Model Serial No. C ont rol P a ne l Manufacturer Model Ac id & C au st ic Type Comments/Observations:
MAIN COMPONENT VERIFICATION
IQ-01
Microza “ultra filtration” filters
SPEC EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Tag ID Manufacturer Part No. Serial No. Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Objective:
• Assure that all the basic literature required for the system operation/maintenance of the Purified
Water system is available and properly stored
Pr
a. Per equipment, collect all related documentation
ocedure:
b. Document all relevant information according to “Document Info” column
c. If any of the “document type” is not applicable, write an Not Apply to the “Document Info”
column and explain in the “Comments/Observations” section
References Required:
• Manufacturer’s Documentation - Installation and Operational Manuals, Wiring Diagrams, Spare
Parts List, P & ID’s, etc.
• Vendor’s Documentation - Purchase Order, etc.
Acceptance Criteria:
• At least the basic literature (see document type) was found for all equipment and was found to
be properly stored
DOCUMENT INVENTORY VERIFICATION
IQ-02
Filter set 1A & 1B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Filter set 2A & 2B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Filter set 3A & 3B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Filter set 3A & 3B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
Filter set 4A & 4B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
Filter set 5A & 5B DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Dual Softener unit DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawings P & ID’s PLC Software Backup & Report MSDS Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
6,000 Gal. Tank DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Distribution Pumps (1A, 1B) DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
8,000 Gal. Tank DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Distribution Pumps (2A, 2B) DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Ozone Generator DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawings P & ID’s PLC Software Backup & Report Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Ozone Destructor DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings P & ID’s PLC Software Backup & Report Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
UV lamps (1A, 1B, 2A, 2B) DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Dual Reverse Osmosis unit DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawing P & ID’s PLC Software Backup & Report MSDS Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Degasification unit DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings Mechanical Drawings P & ID’s Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Dual Mixed Bed unit DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings P & ID’s PLC Software Backup & Report Other Documents Comments/Observations:
DOCUMENT INVENTORY VERIFICATION
IQ-02
Microza “ultra filtration” filters DOCUMENT
TYPE
DOCUMENT INFO
(DOC #, TITLE, REV., LOCATION)
DOCUMENT STORAGE (LOCATION) PERFORMED BY/DATE Installation and Operation Manual Purchase Order Electrical Drawings P & ID’s Other Documents Comments/Observations:
DRAWING VERIFICATION
IQ-03
Objective:
• Assure concordance between drawings (P & I D’s and Electrical Schematics, etc.) and field
installation of the Purified Water System
Pr
a. Collect and document the drawings found thru IQ - 02: “Document Inventory Verification”
ocedure:
b. Verify against field installation by performing a physical inspection and redline drawings, if
discrepancy occurs
c. Sign, date & submit discrepancies to Facilities Dept. for review
d. Upon review, determine if drawings and/or field installation needs to be updated
e. Attach verified drawings to this protocol
References Required:
• Process and Instrument Diagrams (P & I D’s)
• Electrical Schematics
Acceptance Criteria:
• Drawings match field installation and vice versa
• Discrepancies between drawings and field installation were satisfactorily resolved by submitting
changes and updating drawings and/or field installation
DRAWING VERIFICATION
IQ-03
Sheet ______ of ______
Use additional pages as necessary
DRAWING
TYPE & ID TITLE & REVISION
REDLINED? (YES/NO) UPDATE? (DWG, FLD, NA) PERFORMED BY/DATE Comments/Observations:
SYSTEM DESIGN VERIFICATION
IQ-04
Objective:
• Assure that the installation design is in compliance with the specified requirements for systems
capable of producing Purified Water
Pr
• Verify system installation as per specifications by performing a physical verification and/or
providing documented evidence
ocedure:
• Document findings and evaluate against expected results
Note: This verification is best performed during “Drawing Verification”
References Required:
• P & ID’s
• Material Safety Data Sheets
• Chemical Analysis Sheets
Acceptance Criteria:
SYSTEM DESIGN VERIFICATION
IQ-04
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Feed water
The raw water source supplied to the system must be from Well or City Water
Processing
The system contains equipment capable of performing Deionization and Reverse Osmosis or
Distillation.
Piping
Piping will provide constant circulation of Purified water. Piping does not have an unused portion greater in length than six diameters of the unused pipe measured from the axis of the pipe in use (dead leg).
Contact material
All material in direct contact shall be non-reactive to Purified Water. Comments/Observations:
PLACEMENT VERIFICATION
IQ-05
Objective:
• Assure that the equipments have the appropriate conditions to perform setup and maintenance
and to operate accordingly.
Pr
• Per equipment, verify field conditions by performing a physical inspection as per expected
results
ocedure:
• Document and evaluate findings against expected results
References Required:
• Skid Drawings
Acceptance Criteria:
PLACEMENT VERIFICATION
IQ-05
SKID #1 - Filter Set 1A, 1B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID #2 - Filter set 2A, 2B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID #3 - Distribution Pumps 1A, 1B; UV lamps 1A, 1B & Filter set 3A, 3B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID #4 - R. O. Piping/Valves
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID 5 - Pumps 2A, 2B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID 6 - UV lamps 2A, 2B & Filter 4A, 4B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
SKID 7 - Filter set 5A, 5B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
Water Softener Skid
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
Ozone Generator Skid
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
PLACEMENT VERIFICATION
IQ-05
Ozone Destructor Skid
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
R.O. Skid
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
R.O. Cleaning Skid
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
Position
The equipment shall be located along open
type waste drains.
Environment
The equipment is not placed on direct sunlight or other sources of heat.
• Assure that the installed utility meets the Purified Water System requirements
Pr
•
Utility Verificationocedure:
a. Per equipment, perform utility verification as per expected results by using a calibrated test
instrument (when required), and document results
b. Attach copy of instrument calibration certificate and ensure it is up to date
c. Ensure that each utility connection is properly labeled
• Electrical Verification
a. Perform verification as per Utility Verification thru a certified electrician
b. Attach copy of Electrician’s license and ensure it is up to date
Note: All readings will apply a ±10% tolerance
References Required:
• Test Instruments calibration certificates
• Copy of Electrician’s license
Acceptance Criteria:
• Utilities comply with expected results (manufacturer specifications)
• All calibrations/certifications are up to date
UTILITY VERIFICATION
IQ-06
Dual Softener unit ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ____________________________
OTHER SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Compressed Air
Chemical
UTILITY VERIFICATION
IQ-06
Ozone Generator ELECTRICAL
SPECS
EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE OZ -1 Voltage Phase Amperage Frequency Panel ID P -O Z 1 Voltage Phase Amperage Frequency Panel ID P -O Z 2 Voltage Phase Amperage Frequency Panel ID T ran sf o rmer Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ___________________________ License Number: ___________________________
OTHER SPECS EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Compressed Air 90-110 psig
UTILITY VERIFICATION
IQ-06
Ozone Destructor ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID Bulb installation
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ____________________________
UTILITY VERIFICATION
IQ-06
UV lamps (1A, 1B) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID Bulb installation
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ____________________________ Comments/Observations:
UTILITY VERIFICATION
IQ-06
UV lamps (2A, 2B) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID Bulb installation
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ___________________________ Comments/Observations:
UTILITY VERIFICATION
IQ-06
Distribution Pumps (1A, 1B) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ___________________________ Comments/Observations:
UTILITY VERIFICATION
IQ-06
Distribution Pumps (2A, 2B) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ___________________________ Comments/Observations:
UTILITY VERIFICATION
IQ-06
Dual Reverse Osmosis unit ELECTRICAL
SPECS
EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE U n it A Voltage1 Voltage2 Phase1 Phase2 Amperage1 Amperage2 Frequency Panel ID U n it B Voltage1 Voltage2 Phase1 Phase2 Amperage1 Amperage2 Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: _____________________________
OTHER SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Compressed Air 80-110 psig
Comments/Observations: 1Assembly power to assembly panel (PLC) 2Plant power to assembly power
UTILITY VERIFICATION
IQ-06
Dual Reverse Osmosis unit (Cleaning Skid) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORME D BY/DATE Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: _________________________
OTHER SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORME
D BY/DATE Chemicals
UTILITY VERIFICATION
IQ-06
Dual Reverse Osmosis unit (pumps) ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE R .O F e e d P u m p Voltage Phase Amperage Frequency Panel ID R .O . C le a n in g Pu m p Voltage Phase Amperage Frequency Panel ID A D S Pu m p Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ____________________________ License Number: ____________________________ Comments/Observations:
Degasification unit ELECTRICAL
SPECS
EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE D eg as P an e l Voltage Phase Amperage Frequency Panel ID V a c u u m P u m p Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ___________________________ License Number: _____________________________
OTHER SPECS EXPECTED
RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Compressed Air
UTILITY VERIFICATION
IQ-06
Dual Mixed Bed unit ELECTRICAL
SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL
PERFORMED BY/DATE Voltage Phase Amperage Frequency Panel ID
To be filled by a licensed electrician or electrical engineer with PE license
Does electrical installation comply with NEC standards? (YES/NO) _______________
Electrician signature: ___________________________ License Number: ____________________________
OTHER SPECS EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE Compressed Air (control panel) Clean Compressed Air (MB column) Chemicals Comments/Observations:
INSTRUMENTATION VERIFICATION
IQ-07
Objective:
• Assure that all the instrumentation installed in the Purified Water System that requires
calibration are added to a calibration program
Pr
a. Inspect all instruments evaluated with the “Calibration Program Addition Form” and verify that all
instruments installed at the Purified Water System were included
ocedure:
b. Record instruments (ID & type) that requires calibration according to the “Calibration Program
Addition Form”
c. Verify if the instrument that requires calibration is currently calibrated and record finding
d. Attach calibration certificate of all calibrated instruments
References Required:
Acceptance Criteria:
• Instruments that required calibration were included in site calibration program
• Instruments are currently calibrated
INSTRUMENTATION VERIFICATION
IQ-07
Sheet ______ of ______
Use additional pages as necessary
INSTRUMENT ID INSTRUMENT TYPE IT IS CURRENTLY CALIBRATED? (YES/NO/NA) CALIBRATION DUE DATE PERFORMED BY/DATE Comments/Observations:
MAINTENANCE VERIFICATION
IQ-08
Objective:
• Assure that the Purified Water System is included in a Preventive Maintenance Program and a
spare parts list exists
Pr
a. Per equipment, verify and document the required information by collecting documented
evidence (i.e. PM checklist, PM schedule) of the inclusion of the Purified Water System
components into ___’s Preventive Maintenance Program
ocedure:
b. Collect the Spare Parts list; verify & document the required information
c. Collect the Lubricants list; verify & document the required information
d. If lubricant specifications is not applicable, write a Not Apply to the “Actual Result” column and
explain in the “Comments/Observations” section
References Required:
• Evidence of PMP inclusion - PM checklist, PM schedule, PM program printouts, etc.
• Spare Parts list
• Lubricants list
• FOP 4.1 “Scheduled Preventive Maintenance”
Acceptance Criteria:
• All equipment is included in a PM schedule
• All equipment has spare part list
MAINTENANCE VERIFICATION
IQ-08
Filter set 1A &1B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Filter set 2A & 2B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Filter set 3A & 3B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Filter set 4A & 4B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Filter set 5A & 5B
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Dual Softener unit
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Ozone Generator
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Ozone Destructor
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
6,000 Gal. Tank
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
8,000 Gal. Tank
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Distribution Pumps (1A, 1B)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
Distribution Pumps (2A, 2B)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
UV lamps (1A, 1B)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
UV lamps (2A, 2B)
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Dual Reverse Osmosis unit
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
De-gasification unit
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Dual Mixed Bed unit
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.
MAINTENANCE VERIFICATION
IQ-08
Microza “ultra filtration” filters
SPEC EXPECTED RESULT ACTUAL RESULT PASS/FAIL PERFORMED
BY/DATE
PMP
A PM checklist, schedule or similar is available as evidence of inclusion into the
PM program.
Spare Parts
Spare parts inventory is available for the
equipment.
Lubricants
Lubricants inventory is available for the
equipment.