A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure

N/A
N/A
Protected

Academic year: 2020

Share "A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

TABLE 2. Descriptive Statistics of collected data
Figure 1.(e)  Dependency of each factor with CAPEX
TABLE 3. New data set for cost model construction
Figure 4 indicates the actual CAPEX data versus predicted the same one. It is appear that the proposed model can predict the mining CAPEX of open pit
+2

References

Related documents

This is the cornerstone of the Axiomatic Design that examines a design problem and how it is modeled before any attempt to solve the problem 16 and, in this work, we have been able

High titers of neutralizing antibody against Cox- sackie B, virus were detected in serum specimens obtained on the sixteenth and twenty-third days of illness. TREATMENT AND COURSE :

Anti-inflammatory effects of the preparation were studied according to the below methods: S.Salamon– burn induced inflammation of the skin, caused by hot water (80 0 C) in white

Sensory characteristics Colour differences among ice cream samples with different levels of pulse protein concentrate substitution was observed by instrumental

des Produktes massiv gesteigert, wenn [...] [Unternehmen] positive Aufmerksamkeit erzeugen konnten oder Sympathien für [...] [die] Marke wecken konnten.“ (Gerstenberg und

Evaluation of the developed shift scheduling model shows that the resulting schedule balances the physical workload which also level shift allocation among workers,

Flexible Financial Impact on Falling Risk (Fall) (Stock of 58 Companies Admitted to the Stock Exchange over the Period from 2001 to 2010) The results show that

So this weight is used in the decision support system, which of these systems determines the selection of cement transport trucks based on the calculation of driver