• No results found

Department of Mechanical Engineering. Indian Institute of Technology Roorkee. Telephone : ( ) Off : Department of Mechanical Engineering

N/A
N/A
Protected

Academic year: 2021

Share "Department of Mechanical Engineering. Indian Institute of Technology Roorkee. Telephone : ( ) Off : Department of Mechanical Engineering"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Course 12. Industrial Engineering (Video Course) Faculty Coordinator(s) :

1. Prof. Pradeep Kumar

Department of Mechanical Engineering Indian Institute of Technology Roorkee Roorkee-247 667

Email : kumarfme@iitr.ernet.in

Telephone : (91-1332) Off : 285602

Res : 270211, 285130 2. Prof. H. S. Shan

Department of Mechanical Engineering Indian Institute of Technology Roorkee Roorkee-247 667

Email :

shanhfme@iitr.ernet.in

Telephone : (91-1332) Off : 285680

Res : 271024, 285016 3. Prof. P. K. Jain

Department of Mechanical Engineering Indian Institute of Technology Roorkee Roorkee-247 667 Email : pjainfme@iitr.ernet.in Telephone : (91-1332) Off : 285290 Res : 285350 Detailed Syllabus : Work Study

Historical background; Work study definition; Role of work study in improving productivity; Ergonomics and work study.

Work study procedure: selection of jobs; Information collection and recording; Recording techniques -charts and diagrams; critical analysis; developing better method; installation and follow up of standard method.

(2)

Motion Study

Memomotion and micromotion study; therbligs; cyclegraph and

chronocyclegraph; simochart; Principles of motion economy; Design of work place layout.

Work measurement

Definition; Procedure; Performance rating; Concept of normal time; allowances. Work sampling technique of work measurement.

Introduction to pre -determined motion time system.

Quality & Reliability

Introduction and definitions of quality Evolution of Quality: Inspection, Quality Control, Customer-Orientation: Internal & External Customer Concept, Life cycle approach to quality costs- Prevention; Appraisal and Failure costs. Seven QC tools (Histogram, Check sheets, Ishikawa diagrams, Pareto, Scatter diagrams, Control charts). Process capability concepts.

Facilities Design

Site Selection: Factors influencing the selection, rural and urban locations of "") sites, optimum decision on choice of site and analysis. Plant Layout: Types of production, types of layouts, advantages and disadvantages of layout, factor affecting layout, systematic layout planning, Material handling: importance, principles of material handling,

Operations Research

Introduction, general methodology of OR, application of OR, Formulation of linear programming, deterministic models, graphical solution, simplex algorithm, Reliability

Introduction, Definitions, reliability evaluation, maintainability, and availability concepts.

Capacity Planning

Introduction, measures of capacity, capacity strategies, A systematic approach for capacity decisions, Long range capacity planning and control, Medium range capacity planning and control, Short range capacity planning and control. Inventory Management

Introduction, Inventory related costs, EOO model, EPO model, Inventory models allowing shortages, Inventory models allowing price discounts, Inventory model under risk conditions, Inventory control systems: continuous review, periodic review, optional replenishment etc., Inventory classification systems: ABC, FMS, VED etc, MRP.

CPM/PERT

(3)

Loading and Scheduling

General scheduling problem, Significance of loading and scheduling, Factors affecting scheduling, Scheduling system, Flow shop scheduling, Job shop scheduling, Sequencing, Line balancing.

Forecasting

Introduction, Demand patterns, Factors affecting demand, Subjective forecasting methods, Casual forecasting methods, Time series forecasting methods, Routine short term forecasting methods, Selection of forecasting model.

PPC

Introduction, System approach, Type of manufacturing systems, Factors affecting manufacturing systems.

Product design and development

Introduction, marketing aspects, functional aspects, operational aspects, durability and dependability, aesthetic aspects, economic analysis, profit and competitiveness, the three S's, break even analysis, economics of a new design, production aspects.

Lecture Details:

1. Work Study: Historical background. Definition. Role in improving productivity. Ergonomics

and work-study.

2. Work study Procedure: Selection of job for method study and defining problem.

Information collection.

3. Information recording techniques: charts and diagrams. 4. Critical analysis of information recorded.

5. Developing better method and installation as standard method. Follow up. , 6. Memomotion and micromotion study; therbligs, simochart. 7. Cyclegraph and chronocyclegraph; Principles of motion economy. Design of workplace layout.

8. Work measurement definition, applications and procedure.

9. Performance rating and concept of normal time; allowances; determination of standard time.

10. Work sampling technique of work measurement. 11. lntroduction of PMT systems.

(4)

12. Introduction and definitions of quality,

13. Evolution of Quality, Inspection, Quality Control, its benefits

14. Customer-Orientation: Internal & External Customer Concept, Life cycle approach to

quality costs- Prevention; Appraisal and Failure costs.

15. Seven QC tools (Histogram, Check sheets, Ishikawa diagrams, Pareto, Scatter diagrams,

Control charts).

16. Control charts; x bar chart, c chart 17. P c.hart, u chart 18. Process capability concepts.

19. Site Selection: Factors influencing the selection,

20. Rural and urban Iqcations of sites, optimum decision on choice of site and analysis.

21. Plant Layout: Types of production, types of layouts, advantages and disadvantages of layout,

22. Factor affecting layout, systematic layout planning,

23. Material handling: importance, & principles of material handling, 24. Introduction, general methodology of OR, application of OR, 25. Formulation of linear programming, graphical solution, 26. Simplex algorithm,

27. Introduction, Definitions, reliability evaluation, 28. Maintainability, and availability concepts.

29. Introduction to capacity, measures of capacity and strategies for capacity. 30. A systematic approach for capacity management

31. Introduction to inventory management and simple inventory models 32. Inventory models with varying market conditions (such as, discounts, risk factors etc.)

33. Inventory classification and inventory control systems 34. MRP

(5)

35. Project scheduling with CPM 36. Project. scheduling with PERT

37. Introduction, strategies and methods for aggregate planning 38. General scheduling problem and factors affecting scheduling 39. Flow shop and job shop scheduling

40. Sequencing and line balancing

41. Introduction to forecasting, demand patterns, factors affecting demand 42. Time series forecasting methods

43. System approach to PPC

44. Types of manufacturing systems, factors affecting manufacturing systems 45. Introduction to product design and development process

References

Related documents

CeO2 NPs exhibited hermetic effect on soybean that positive impact was observed on the soybean at 100 mg/kg while significant inhibition was shown at the highest concentration of

Our work reveals an association between incapacities on the IADL scale and the various factors and conditions re- lated to frailty (cognitive function, nutritional status, and falls)

Wien Holding manages KUNST HAUS WIEN as successfully as the company's whole cultural group, currently consisting of Vereinigte Bühnen Wien with the venues Theater an der Wien,

Using variation in the size of the bonus pool generated by a manufacturing plant’s gainsharing plan, which varies incentives for quality and worker engagement, we evaluate

Figure 2-18 Diesel cycle with natural gas direct high pressure (300 bar) injection (Source

3.1.3 Prednosti in slabosti novega davka Prednosti davka na nepremičnine:  vsi bistveni podatki, pridobljeni iz ene javne evidence REN podatki o nepremičnini, predmetu

Other factors to consider include the number and size of nonstandard booths (e.g., island booths, peninsula booths), the amount of space needed for the

Because of the poor performance in entropy gain for unsmoothed trees, M-Branch smoothing will be compared with the Laplace correction in the next section: it is the second best in