High-quality Plant Asset Data Handover
High quality Plant Asset Data Handover
Validation, Transformation & Loading Solution
(VTL)
(
)
Tom Arsenovic Tom Arsenovic
Vice President, PP&M EMIA Services & Business Development Adrian Park,
Adrian Park,
Information validation & take-on
– Business challenges –
Business challenges
enormous data volumes
often undertaken at the end of a project
often undertaken at the end of a project
when there is limited time and resources
limited resources with necessary skills
$
$
typically cost $10-20M for a $1billion
CAPEX plant and take over 1 year
poor quality data can add 30% to
modification costs and can result in
wrong decisions impacting plant
reliability, and safety
solution is not just an IT tool:
– clear specification of requirements in
contracts
– organisation to follow-up and verify
– strategy of incremental handover
The challenge
Problematic information handover during asset lifecycle:
FEED d t il d d i
– FEED → detailed design
– detailed design → construction (including numerous sub-contractors)
– construction → commissioning
– operations, maintenance, enhancements etc
– decommissioning
The Solution
– information management plan covering the entire asset lifecycle
– detailed specification of engineering data requirements p g g q
– generally available commercial tools, acceptable to a wide range of
suppliers, which facilitates the efficient handover of quality controlled engineering information
Achieving seamless handover to operations via
continual loads
continual loads
SP-PID SP-EL others Handover of FEED information to EP Handover of project ‘Traditional’ EPCMExecution SP-3D SP-I SP-MAT
Plant handover
to EP project
information to operator Continual Incremental Handover
EP EP Exception Reports Standards/ Standards/ CMCM handover
design engineer procure construct commission startup
concept FEED operate maintain optimize
EP EP Standards/ Specifications Standards/ Specifications SP-I OWNER
OWNER OPERATOROPERATOR
SP-I ERP
Continuous validation / aggregation / consolidation
SP PID SP PID SP I Construction SPF EDW SPF EDW Contract Award
SP-PID Construction SP-PID
Analysis & simul
CMMS
Strategies to ensure improved handover
Information Management Scope (IMS): addresses hand-over
requirements in order to ensure safe and efficient operation of a
requirements, in order to ensure safe and efficient operation of a
facility
– minimum level of documentation required to effectively manage its assets and
business business
– data format requirements and taxonomies structured to be compatible with the
engineering, operating and maintenance systems to be used
– information specification provides the details of the required data and formats
Tools required to facilitate the handover of a high quality digital plant
– computerized tools to ensure validation, transformation and data loading
– facilitate an incremental handover (eliminates full handover every iteration)facilitate an incremental handover (eliminates full handover every iteration)
– consolidation of data in a single authoritative engineering data Warehouse,
providing a consistent source for asset information throughout the asset lifecycle via access from a simple web portal
– delivered over the lifecycle of the asset where possible
– codification of business rules – as needed from the enterprise to the project
level as needed
VTL overview
contractors
data validation team
t OO / PMC
CAPEX
project team
operations
at OO / PMC
p j
operations
VTL
Staging area SAP SPO/ SPFVTL
suppliers
other Intergraph target systems other non-Intergraph target systems legacy systems QC Reports systems systemsVTL validation rules
powerful and highly flexible generic rule
definition capability including:
– syntax rules (ENS) – uniqueness validation – relationship cardinality
date & time validation – date & time validation – integer validation – string validation – pick-list validationp c st a dat o
– unit of measure validation – mandatory fields
– cascading errors
– PL/SQL and DLL rule definitions for more complex rules
rules may be included into rule sets that are
run against data submissions
run against data submissions
rules and rule sets are reusable
severity of validation findings may be graded
on rules eg as “warnings” and “errors”
VTL configurable validation engine
role-based rules administration
with SPF Desktop Client.
p
wide range of standard out of the
box rule types that may be defined
in a SPF form by end users
y
configurable rules to check:
– naming standards
– mandatory relationships
– mandatory relationships
– enumerated values
– ranges and UoMs for numeric
values values
– lengths and format for string values
custom rules may be written using
PL/SQL or NET
PL/SQL or .NET
rule sets for organizing rules that
are run together
8 © 2010 Intergraph Corporation. All Rights Reserved!
VTL data import
plug-and-play “readers” allow
import from various file types:
import from various file types:
– CSV – XLS
constant prompted and custom
constant, prompted, and custom
code values may be inserted
comparison with previous
s bmission to disco er deletes
submission to discover deletes;
implicit and explicit deletes
supported
t
ti
b
d
Wi d
automation based on Windows
Workflow Foundation
mapping and transformation
b
d
i d
d d XSLT
based on industry-standard XSLT
VTL mapping and transformation
XSLT transformation (Extensible
(
Style Sheet Language) is used
during both import and export to
the staging area
g g
XSLT is a very robust
technology supporting a very
gy
pp
g
y
wide range of transformations
customers may choose any tool
custo e s
ay c oose a y too
to generate XSLT
transformations
VTL staging area
VTL staging area based on SmartPlant
Foundation where:
– user/user group access rights are managed
– validation rules are managed
– rule sets are managed
– data submissions loaded
– validation executed and results held
– data submissions and validation results may
be q eried and na igated be queried and navigated
– full auditable traceability of all validation and
updates performed
VTL schema
VTL schema
– staging area schema (aligned with SPO Core)
is provided OOTB
– OOTB schema accepts most common OO
handover data
– role-based navigation provided by SPF
– may be modified using the SPF UML based
schema editor schema editor
VTL data export/load
plug-and-play “writers” allow
export/load to various systems
export/load to various systems.
OOTB writers for loading SPF 3.8
and 4 x systems
and 4.x systems
OOTB generic writer will invoke
any EXE hand off data and
any .EXE, hand-off data, and
monitor progress
based on Windows Workflow
based on Windows Workflow
Foundation
i
d t
f
ti
mapping and transformation
based on industry-standard XSLT
IMPORTANT DISCLAIMER
This document is designed to communicate a perspective
g
p
p
of likely R&D prioritization based on the current indicators
of client demand. It will change both in scope and timing
i
t i d
t
d
d
hi h i
it d
i
in response to industry demand, which is quite dynamic.
Intergraph retains all decision rights as to what will be
included in a particular release and does not make
included in a particular release, and does not make
binding commitments outside of a written commercial
Validation Transformation & Loading (VTL)
-selected items from backlog
selected items from backlog
extend reader plug-ins
XML ISO 15926
– XML, ISO 15926
– extract of tags from CAD files, scanned files, MS Office
files and PDF files under loading
– hotspotting CAD PDF under loadinghotspotting CAD, PDF under loading
web service loading
run VTL direct on a SPO implementation
li
i
di i
list view editing
Excel load registers and mappings (to be released)
KPI and dashboard reporting
p
g
export and bulk load to SAP PM
support for multiple domains for cross-source
comparison
comparison
SPO VTL – benefits & value proposition
Reduced time and cost of data handover from
CAPEX projects and turnaroundsp j
– $10-20m – up to 1 year
Improved range, quality, and consistency of
validation performed
Simple for end-users to define rules
End-to-end automation
Enable comparison of data in the staging area
with data in the target SPF system via PL/SQL rules
F ll dit bl t bilit f d t b i i
Fully auditable traceability of data submissions,
validation performed, results and manual changes
Support for the increasingly data centric
Support for the increasingly data centric
deliveries from projects
Tight integration with target engineering
database including comparison of data with data g p
Extract from Shell Presentation
Extract from Shell Presentation
Summary
The challenge
– data volumes are enormousdata volumes are enormous
– data is usually delivered incomplete, with errors or badly formatted – limited time or resources to validate data during project close-out
Benefits
Benefits
– accelerated and improved start-up and commissioning process can take up to one year to load operations systems
– reduced information management cost at handover
costs involved for a $1 billion CAPEX project are typically $10-20 million
reduction of 80% cost should be possible by implementing data handover standards & specifications and automation of receipt, verification and loading
reduced modification cost – reduced modification cost
validating and correcting data for a modification can be up to 30% of the modification cost
Enabled through
g
– rapid loading of massive data quantities – support for continual incremental handover
– rules based and automated quality assurance for very large data or information sets – rules based and automated conversion
Integrating the
Engineering Enterprise
© 2010 Intergraph Corporation. All Rights Reserved! 20