• No results found

Validation, Transformation & Loading Solution (VTL)

N/A
N/A
Protected

Academic year: 2021

Share "Validation, Transformation & Loading Solution (VTL)"

Copied!
20
0
0

Loading.... (view fulltext now)

Full text

(1)

VTL

VTL

High-quality Plant Asset Data Handover

High quality Plant Asset Data Handover

Validation, Transformation & Loading Solution

(VTL)

(

)

Tom Arsenovic Tom Arsenovic

Vice President, PP&M EMIA Services & Business Development Adrian Park,

Adrian Park,

(2)

Information validation & take-on

– Business challenges –

Business challenges

enormous data volumes

often undertaken at the end of a project

often undertaken at the end of a project

when there is limited time and resources

limited resources with necessary skills

$

$

typically cost $10-20M for a $1billion

CAPEX plant and take over 1 year

poor quality data can add 30% to

modification costs and can result in

wrong decisions impacting plant

reliability, and safety

solution is not just an IT tool:

clear specification of requirements in

contracts

organisation to follow-up and verify

strategy of incremental handover

(3)

The challenge

Problematic information handover during asset lifecycle:

FEED d t il d d i

FEED → detailed design

detailed design → construction (including numerous sub-contractors)

construction → commissioning

operations, maintenance, enhancements etc

decommissioning

The Solution

information management plan covering the entire asset lifecycle

detailed specification of engineering data requirements p g g q

generally available commercial tools, acceptable to a wide range of

suppliers, which facilitates the efficient handover of quality controlled engineering information

(4)

Achieving seamless handover to operations via

continual loads

continual loads

SP-PID SP-EL others Handover of FEED information to EP Handover of project ‘Traditional’ EPCM

Execution SP-3D SP-I SP-MAT

Plant handover

to EP project

information to operator Continual Incremental Handover

EP EP Exception Reports Standards/ Standards/ CMCM handover

design engineer procure construct commission startup

concept FEED operate maintain optimize

EP EP Standards/ Specifications Standards/ Specifications SP-I OWNER

OWNER OPERATOROPERATOR

SP-I ERP

Continuous validation / aggregation / consolidation

SP PID SP PID SP I Construction SPF EDW SPF EDW Contract Award

SP-PID Construction SP-PID

Analysis & simul

CMMS

(5)

Strategies to ensure improved handover

Information Management Scope (IMS): addresses hand-over

requirements in order to ensure safe and efficient operation of a

requirements, in order to ensure safe and efficient operation of a

facility

minimum level of documentation required to effectively manage its assets and

business business

data format requirements and taxonomies structured to be compatible with the

engineering, operating and maintenance systems to be used

information specification provides the details of the required data and formats

Tools required to facilitate the handover of a high quality digital plant

computerized tools to ensure validation, transformation and data loading

facilitate an incremental handover (eliminates full handover every iteration)facilitate an incremental handover (eliminates full handover every iteration)

consolidation of data in a single authoritative engineering data Warehouse,

providing a consistent source for asset information throughout the asset lifecycle via access from a simple web portal

delivered over the lifecycle of the asset where possible

codification of business rules – as needed from the enterprise to the project

level as needed

(6)

VTL overview

contractors

data validation team

t OO / PMC

CAPEX

project team

operations

at OO / PMC

p j

operations

VTL

Staging area SAP SPO/ SPF

VTL

suppliers

other Intergraph target systems other non-Intergraph target systems legacy systems QC Reports systems systems

(7)

VTL validation rules

powerful and highly flexible generic rule

definition capability including:

syntax rules (ENS)uniqueness validationrelationship cardinality

date & time validationdate & time validationinteger validationstring validationpick-list validationp c st a dat o

unit of measure validationmandatory fields

cascading errors

PL/SQL and DLL rule definitions for more complex rules

rules may be included into rule sets that are

run against data submissions

run against data submissions

rules and rule sets are reusable

severity of validation findings may be graded

on rules eg as “warnings” and “errors”

(8)

VTL configurable validation engine

role-based rules administration

with SPF Desktop Client.

p

wide range of standard out of the

box rule types that may be defined

in a SPF form by end users

y

configurable rules to check:

naming standards

mandatory relationships

mandatory relationships

enumerated values

ranges and UoMs for numeric

values values

lengths and format for string values

custom rules may be written using

PL/SQL or NET

PL/SQL or .NET

rule sets for organizing rules that

are run together

8 © 2010 Intergraph Corporation. All Rights Reserved!

(9)

VTL data import

plug-and-play “readers” allow

import from various file types:

import from various file types:

CSVXLS

constant prompted and custom

constant, prompted, and custom

code values may be inserted

comparison with previous

s bmission to disco er deletes

submission to discover deletes;

implicit and explicit deletes

supported

t

ti

b

d

Wi d

automation based on Windows

Workflow Foundation

mapping and transformation

b

d

i d

d d XSLT

based on industry-standard XSLT

(10)

VTL mapping and transformation

XSLT transformation (Extensible

(

Style Sheet Language) is used

during both import and export to

the staging area

g g

XSLT is a very robust

technology supporting a very

gy

pp

g

y

wide range of transformations

customers may choose any tool

custo e s

ay c oose a y too

to generate XSLT

transformations

(11)

VTL staging area

VTL staging area based on SmartPlant

Foundation where:

user/user group access rights are managed

validation rules are managed

rule sets are managed

data submissions loaded

validation executed and results held

data submissions and validation results may

be q eried and na igated be queried and navigated

full auditable traceability of all validation and

updates performed

VTL schema

VTL schema

staging area schema (aligned with SPO Core)

is provided OOTB

OOTB schema accepts most common OO

handover data

role-based navigation provided by SPF

may be modified using the SPF UML based

schema editor schema editor

(12)

VTL data export/load

plug-and-play “writers” allow

export/load to various systems

export/load to various systems.

OOTB writers for loading SPF 3.8

and 4 x systems

and 4.x systems

OOTB generic writer will invoke

any EXE hand off data and

any .EXE, hand-off data, and

monitor progress

based on Windows Workflow

based on Windows Workflow

Foundation

i

d t

f

ti

mapping and transformation

based on industry-standard XSLT

(13)

IMPORTANT DISCLAIMER

This document is designed to communicate a perspective

g

p

p

of likely R&D prioritization based on the current indicators

of client demand. It will change both in scope and timing

i

t i d

t

d

d

hi h i

it d

i

in response to industry demand, which is quite dynamic.

Intergraph retains all decision rights as to what will be

included in a particular release and does not make

included in a particular release, and does not make

binding commitments outside of a written commercial

(14)

Validation Transformation & Loading (VTL)

-selected items from backlog

selected items from backlog

extend reader plug-ins

XML ISO 15926

XML, ISO 15926

extract of tags from CAD files, scanned files, MS Office

files and PDF files under loading

hotspotting CAD PDF under loadinghotspotting CAD, PDF under loading

web service loading

run VTL direct on a SPO implementation

li

i

di i

list view editing

Excel load registers and mappings (to be released)

KPI and dashboard reporting

p

g

export and bulk load to SAP PM

support for multiple domains for cross-source

comparison

comparison

(15)

SPO VTL – benefits & value proposition

Reduced time and cost of data handover from

CAPEX projects and turnaroundsp j

$10-20mup to 1 year

Improved range, quality, and consistency of

validation performed

Simple for end-users to define rules

End-to-end automation

Enable comparison of data in the staging area

with data in the target SPF system via PL/SQL rules

F ll dit bl t bilit f d t b i i

Fully auditable traceability of data submissions,

validation performed, results and manual changes

Support for the increasingly data centric

Support for the increasingly data centric

deliveries from projects

Tight integration with target engineering

database including comparison of data with data g p

(16)

Extract from Shell Presentation

(17)

Extract from Shell Presentation

(18)

Summary

The challenge

data volumes are enormousdata volumes are enormous

data is usually delivered incomplete, with errors or badly formattedlimited time or resources to validate data during project close-out

Benefits

Benefits

accelerated and improved start-up and commissioning process can take up to one year to load operations systems

reduced information management cost at handover

costs involved for a $1 billion CAPEX project are typically $10-20 million

reduction of 80% cost should be possible by implementing data handover standards & specifications and automation of receipt, verification and loading

reduced modification costreduced modification cost

validating and correcting data for a modification can be up to 30% of the modification cost

Enabled through

g

rapid loading of massive data quantitiessupport for continual incremental handover

rules based and automated quality assurance for very large data or information setsrules based and automated conversion

(19)
(20)

Integrating the

Engineering Enterprise

© 2010 Intergraph Corporation. All Rights Reserved! 20

IMPORTANT DISCLAIMER

This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to

References

Related documents

Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.. Indicates a potentially hazardous situation which, if not avoided,

The COPD Disease Management Program was an integral part of DMG’s VDHC initiative and the medical home program. Because this project aligned well with organizational goals, it had

It is with both of these judicial views in mind that we examine the relationship between certain organisations which exist solely to protect the commercial

The Reitmeister Trading Alert service will follow hand picked trades by Steve Reitmeister, Editor At Large and EVP of Zacks Investment Research.. The best way to understand his

The idea of radio astronomy with satellite dish was realised when it was noticed that TV signal gets affected due to solar radiation as sun occupies the same position in the sky as

If the VTL is set Auto Replication, the replication of the virtual tape is triggered when the VTL receives the eject command from the backup software (For a physical tape library,

With deduplication, hibernation, and HA cluster configuration of VTL and SIR engines, the VTL6000 is an ideal solution for medium- and high-end users to solve such problems as the

Supplement dated December 2, 2015 to the Summary Prospectus dated November 3, 2015 As you were previously informed, on September 4, 2015, VTL Associates, LLC (“VTL”), the