• No results found

2_Wellhead+Design+and+Completions_15

N/A
N/A
Protected

Academic year: 2021

Share "2_Wellhead+Design+and+Completions_15"

Copied!
49
0
0

Loading.... (view fulltext now)

Full text

(1)

Chair of Petroleum & Geothermal Energy Recovery

Petroleum Engineering

Summer Course 2015

Wellhead Design &

Completions

Clemens Langbauer

(2)

Chair of Petroleum & Geothermal Energy Recovery

Page 2

Chair of Petroleum & Geothermal Energy Recovery

Well Structure / Wellhead Design

sunryoil.com/wellhead_xmas.html

Christmas Tree

(3)

Chair of Petroleum & Geothermal Energy Recovery

Page 3

Chair of Petroleum & Geothermal Energy Recovery

Well Structure

Marine conductor Conductor casing Intermediate casing/ Production casing Production liner

Production liner wt. extension Casing Shoe

Liner hanger with LH packer

(4)

Chair of Petroleum & Geothermal Energy Recovery

Page 4

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook: Drilling Engineering

(5)

Chair of Petroleum & Geothermal Energy Recovery

Page 5

Chair of Petroleum & Geothermal Energy Recovery

Bit / Casing Size Selection

Example RAG:

Wellbore Diameter Casing Diameter

Conductor 20”

17 ½” Surface Casing 13 3/8”

12 ¼” Intermediate Casing 9 5/8”

8 ½” Intermediate Casing 7”

(6)

Chair of Petroleum & Geothermal Energy Recovery

Page 6

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

Wellhead

Casing Head Casing Hanger Casing Spool Tubing Hanger Tubing Head Primary Seal Secondary Seal Tubing Head Adapter

(7)

Chair of Petroleum & Geothermal Energy Recovery

Page 7

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(8)

Chair of Petroleum & Geothermal Energy Recovery

Page 8

Chair of Petroleum & Geothermal Energy Recovery

Cellar

A dug-out area, lined with cement or very large diameter thin-wall pipe,

located below the rig.

- Depth of the cellar is such that the master valve of the Christmas tree is easy to reach from ground level

- Prior to setting surface casing, the cellar also takes mud returns from the well

- Cavity for the casing spools

(9)

Chair of Petroleum & Geothermal Energy Recovery

Page 9

Chair of Petroleum & Geothermal Energy Recovery

Base Plate

The base plate is a load-supporting device attached to the starting

casing head by means of either mechanical or permanent (welding) connection.

Baseplate Size Current Load Capacity

11" 2200 kN vertical load 13 5/8" 3300 kN vertical load 16 3/4" 4400 kN vertical load 20 3/4" & 21 1/4" 4400 kN vertical load

www.downingwell.com

(10)

Chair of Petroleum & Geothermal Energy Recovery

Page 10

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Casing Head

- attached to the top end of the surface casing

- provides a support for the other strings and a sealing of the annular space between two casing strings

- composed of a casing-hanger bowl to support the smaller casing

(11)

Chair of Petroleum & Geothermal Energy Recovery

Page 11

Chair of Petroleum & Geothermal Energy Recovery

Casing Hanger

Source: Petroleum Engineering Handbook

www.fmctechnologies.com

The Casing Hanger is a mechanism/ device that seats in the bowl of the casing head / casing spool to suspend the next smaller casing string securely and provide a seal between the suspended casing and the casing head bowl.

(12)

Chair of Petroleum & Geothermal Energy Recovery

Page 12

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Casing Spool

A Casing Spool is an intermediate casing head attached to the top

flange to the top flange of the underlying casing head to provide a support for the next smaller casing string and a sealing of the annular space between the two casing strings.

www.fmctechnologies.com

(13)

Chair of Petroleum & Geothermal Energy Recovery

Page 13

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

Primary / Secondary Packoff

The primary and secondary packoffs are used to seal the annular space

(14)

Chair of Petroleum & Geothermal Energy Recovery

Page 14

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Tubing Head

www.fmctechnologies.com

A Tubing Head is a spool type unit attached to the top flange of the uppermost casing head to provide a support for the tubing string and to seal the annular space between the tubing string and the production casing string.

(15)

Chair of Petroleum & Geothermal Energy Recovery

Page 15

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Tubing Hanger

www.fmctechnologies.com

A Tubing Hanger is a device used to provide a seal between the tubing and the tubing head.

(16)

Chair of Petroleum & Geothermal Energy Recovery

Page 16

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Tubing Head Adapter

A Tubing Head Adapter provides a transition from the wellhead to the

master valve of the tree.

(17)

Chair of Petroleum & Geothermal Energy Recovery

Page 17

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation

Threaded ball valve Flanged valve Base plate Pressure gauge Casing head

(18)

Chair of Petroleum & Geothermal Energy Recovery

Page 18

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation

Threaded ball valve Flanged valve Base plate Pressure gauge Casing head Casing spool Casing hanger

(19)

Chair of Petroleum & Geothermal Energy Recovery

Page 19

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation

Threaded ball valve Flanged valve Base plate Pressure gauge Casing head Casing spool Casing hanger Tubing head

(20)

Chair of Petroleum & Geothermal Energy Recovery

Page 20

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook: Drilling Engineering

(21)

Chair of Petroleum & Geothermal Energy Recovery

Page 21

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook: Drilling Engineering

(22)

Chair of Petroleum & Geothermal Energy Recovery

Page 22

Chair of Petroleum & Geothermal Energy Recovery

Example

Evaluate the required components, the size, the height and the weight of a wellhead that must support three casing strings (13 3/8”, 9 5/8”, 7”) and a 2 7/8” tubing string.

(23)

Chair of Petroleum & Geothermal Energy Recovery

Page 23

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(24)

Chair of Petroleum & Geothermal Energy Recovery

Page 24

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(25)

Chair of Petroleum & Geothermal Energy Recovery

Page 25

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(26)

Chair of Petroleum & Geothermal Energy Recovery

Page 26

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(27)

Chair of Petroleum & Geothermal Energy Recovery

Page 27

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(28)

Chair of Petroleum & Geothermal Energy Recovery

Page 28

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(29)

Chair of Petroleum & Geothermal Energy Recovery

Page 29

Chair of Petroleum & Geothermal Energy Recovery

Vetcogray: FC wellhead systems

(30)

Chair of Petroleum & Geothermal Energy Recovery

Page 30

Chair of Petroleum & Geothermal Energy Recovery

Homework 1

Homework 1

Deadline: 25.08.2015 09:00

Evaluate the required components, the size, the height and the weight of a wellhead that must support four casing strings (20”, 13 3/8”, 9 5/8”, 7”) and a 3 1/2” tubing string.

(31)

Chair of Petroleum & Geothermal Energy Recovery

Page 31

Chair of Petroleum & Geothermal Energy Recovery

The Christmas Tree is an assembly of valves and fittings used to control production and provide access to the production tubing string. It includes all equipment above the tubing head top flange.

Source: Petroleum Engineering Handbook

Christmas Tree Assembly

(32)

Chair of Petroleum & Geothermal Energy Recovery

Page 32

Chair of Petroleum & Geothermal Energy Recovery

Source: Petroleum Engineering Handbook

Christmas Tree Assembly

The purposes of the Christmas tree are to

- provide the primary method of closing in a well - isolate the well from adjacent wells

- connect the flowline

- provide vertical access for well interventions (slickline, electricline, coiled tubing etc.) whilst the well is live

- interface with the tubing hanger

(33)

Chair of Petroleum & Geothermal Energy Recovery

Page 33

Chair of Petroleum & Geothermal Energy Recovery

J. Bellarby: Well Completion Design

(34)

Chair of Petroleum & Geothermal Energy Recovery

Page 34

Chair of Petroleum & Geothermal Energy Recovery

Renpu: Advanced Well Completion Engineering

(35)

Chair of Petroleum & Geothermal Energy Recovery

Page 35

Chair of Petroleum & Geothermal Energy Recovery

Renpu: Advanced Well Completion Engineering

(36)

Chair of Petroleum & Geothermal Energy Recovery

Page 36

Chair of Petroleum & Geothermal Energy Recovery

Subsea Christmas Tree Assembly

(37)

Chair of Petroleum & Geothermal Energy Recovery

Page 37

Chair of Petroleum & Geothermal Energy Recovery

J. Bellarby: Well Completion Design

(38)

Chair of Petroleum & Geothermal Energy Recovery

Page 38

Chair of Petroleum & Geothermal Energy Recovery

Completion Engineering

www.starse.com.cn

A completion is the interface between the reservoir and the surface. The objective is to allow a safe and environmental friendly protection.

(39)

Chair of Petroleum & Geothermal Energy Recovery

Page 39

Chair of Petroleum & Geothermal Energy Recovery

Completion Components

• Surface Components

• Christmas Tree • Well Head

• Intermediate Components

• Subsurface Safety Valves • Tubing • Injection Lines • Completion Fluids

• Reservoir Components

• Perforations • Sand screens • Packers l

• Pumps

(40)

Chair of Petroleum & Geothermal Energy Recovery

Page 40

Chair of Petroleum & Geothermal Energy Recovery

Completions

Completion as part of the well control envelope:

‘At least two tested independent barriers between hydrocarbons in the reservoir and the environment at all times’

Primary barrier:

barrier that initially prevents hydrocarbons from escaping e.g. the mud, the tubing or the Christmas tree

Secondary barrier:

backup to the primary barrier – it is not normally in use until the primary barrier fails.

The secondary barrier must be independent of the primary barrier. Any event that could destroy the primary barrier should not affect the secondary barrier.

(41)

Chair of Petroleum & Geothermal Energy Recovery

Page 41

Chair of Petroleum & Geothermal Energy Recovery

Completions

(42)

Chair of Petroleum & Geothermal Energy Recovery

Page 42

Chair of Petroleum & Geothermal Energy Recovery

Completions

(43)

Chair of Petroleum & Geothermal Energy Recovery

Page 43

Chair of Petroleum & Geothermal Energy Recovery

The role of a Completion Engineer

(44)

Chair of Petroleum & Geothermal Energy Recovery

Page 44

Chair of Petroleum & Geothermal Energy Recovery

The role of a Completion Engineer

(45)

Chair of Petroleum & Geothermal Energy Recovery

Page 45

Chair of Petroleum & Geothermal Energy Recovery

Types of Completions

Objectives of wells: Producer: - Oil - Gas - Water Injector / Disposal: - Gas - Water - Steam Combination: - Gas storage

- Time shifted (produce HC and then convert to water injection duty) - Produce through the tubing and inject down the annulus

(46)

Chair of Petroleum & Geothermal Energy Recovery

Page 46

Chair of Petroleum & Geothermal Energy Recovery

Types of Completions

Reservoir Completion:

connection between reservoir and well Decisions:

- Well trajectory and inclination - Open hole versus cased hole

- Sand control requirement and type of sand control

- Stimulation (proppants or acid)

- Single or multi-zone (commingled or selective)

Upper Completion:

conduit from reservoir completion to surface facilities

(47)

Chair of Petroleum & Geothermal Energy Recovery

Page 47

Chair of Petroleum & Geothermal Energy Recovery

Reservoir Completions

(48)

Chair of Petroleum & Geothermal Energy Recovery

Page 48

Chair of Petroleum & Geothermal Energy Recovery

Upper Completions

(49)

Chair of Petroleum & Geothermal Energy Recovery

Page 49

Chair of Petroleum & Geothermal Energy Recovery

Completions

References

Related documents

This paper investigates the existence of the environmental Kuznets curve (EKC) for carbon dioxide (CO2) emissions and its causal relationships with economic growth and openness by

Gusella [38] analyzed diskless workstation traffic on a 10 Megabit/second Ethernet local- area network. He used a measurement methodology similar to ours, and went on to

• You can code crop applications and even custom rate changes directly to the crop, farm and field as you rec- ord them in Transaction Plus accounting.. • TransAction Plus

STARBUKS S UMMARY Check Std Test 214 Flow Calibration Test 217 CRM Data Flow Quality Test 218 Common Research Model   . Accuracy & Validation  Data Acquisition System

Comparison of HPLC and GC-MS Methods for Determination of Embutramide (A Component of Tanax | or T-61 | in Biological

Based on a survey of members of the Manufacturing Leadership Community, the report was intended to explore the extent to which manufacturers believe enterprise social networks

Control charts are used to distinguish between common and special cause variation and use that understanding to control and improve processes..

manner in which I created the original scatterplots. In your work, you will want the re- expression to produce 1) a scatterplot with points that are close to a straight line, and 2)