• No results found

Project managers’ knowledge management and competency model for construction in Malaysia

N/A
N/A
Protected

Academic year: 2020

Share "Project managers’ knowledge management and competency model for construction in Malaysia"

Copied!
70
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.1: Research Roadmap

References

Related documents

More importantly, the request-respond paradigm effec- tively eliminates the bottleneck vertices resulted from algorithm logic, by bounding the number of response messages sent by

VFC vaccines stored by 76 percent of 45 providers we reviewed were exposed to inappropriate temperatures Although the majority of storage temperatures we independently measured

And in this thesis, there are mainly three suggestions on cultivating Business English talents of maritime universities, those are, adjusting teaching materials and innovating

To examine recent developments in Japanese employment practices, we compute the following four measures for each year: (1) the age-wage profile; (2) the kernel density

In addition, based on the arguments that the intensity of board of directors’ monitoring to reduce the conflicts between the majority and minority shareholders through the

Undocumented students face a variety of obstacles, some erected by state legislation, to accessing higher education including denial of admission, lack of financial aid, and

Source files may be located on the Local / LAN or FTP server. Click the "Add" button to show the file selection dialog.. If source data are located on an FTP, please specify

Measurement Challenge: Dynamic Current nA A Active current pulses Idle current pulses Sleep current. Devices with dynamic current,