• No results found

A COMPARISON OF SASSI2010 and SAP2000 FIXED-BASE ANALYSIS RESULTS FOR VALIDATION OF A LARGE SCALE NUCLEAR REACTOR BUILDING MODEL

N/A
N/A
Protected

Academic year: 2020

Share "A COMPARISON OF SASSI2010 and SAP2000 FIXED-BASE ANALYSIS RESULTS FOR VALIDATION OF A LARGE SCALE NUCLEAR REACTOR BUILDING MODEL"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 2. CSDRS Acceleration Time History
Figure 3. 3D Cross Sectional View of SSI Analysis Case .
Figure 13. SASSI Input, Total, and Relative Displacements in Y-Direction at N51430.

References

Related documents

Networking in increasing the android new hashmap using system class does not an predefined size put new capacity and notify in the built data.. Age with coding by java and is the

The contextual suggestion architecture shown in Figure 1 involves five key sequential steps: 1) User Interest Modeling, which builds both general and specific

It extracted and analyzed the low-level components (key frames) and computable features (such as dominant color, lighting condition, and color dynamics) from

Silencing P4HA2 expression or treatment with the P4HA inhibitor significantly inhibited cell proliferation and suppressed aggressive phenotypes of breast cancer cells in 3D

The occult and the commonplace are syn­ thesized in the symbols, which is another way of saying that they should be understood at two levels: the archetypal-structural and

• the second stage allows the player to build purple cards for one resource less than their written cost and is worth 2 victory points for each purple card present in the

The latter effect, which is referred to as the business migration effect, implies that the access price on copper networks (i.e. the LLU price) may have a considerable

There is little qualitative research on the career development of students who are studying a fine art or a business management undergraduate degree beyond a focus on the