• No results found

Integrated techno-economic power system planning of transmission and distribution grids

N/A
N/A
Protected

Academic year: 2020

Share "Integrated techno-economic power system planning of transmission and distribution grids"

Copied!
29
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Installed generation capacities for Germany (GER) and the entire model region (total) perscenario and technology/fuel [59].
Figure 2. Theunderlying MV grid topologies and its connection to the HV level is displayed
Figure 3. Exemplary visualization of the E–M algorithm for k-means clustering [64]. During the E-Stepall data points are assigned to the nearest (initially randomly set) cluster center
Table 1. Grid and storage expansion parameters for the scenarios NEP 2035 and eGo 1001 based on [66](storage units), [3] (HV grid) and [7] (EHV grid).
+7

References

Related documents

Gearbox – Where the vehicle is front engine rear wheel drive the only gearbox permitted is Ford Rocket its original origin is Ford Cortina, Escort, and Granada in four

When a data signal is applied to the HS0038A2D in the presence of a disturbance signal, the sensitivity of the receiver is reduced to insure that no spurious pulses are present at

Each student must write individually a short paper (900 words) explaining the theme of their presentation. The second presentation is to be 15-20 minutes in length including time

This essay asserts that to effectively degrade and ultimately destroy the Islamic State of Iraq and Syria (ISIS), and to topple the Bashar al-Assad’s regime, the international

Place a piece of fine white wire half way up each, and secure it to its position by placing a narrow strip of white wax upon the same, rolling it down each edge with the head of

It seemed probable both from the experience of others9-12 and from the rela- tively small number of non-paralytic cases seen at the City Hospital (Table I) that many

The scientific work has been carried out under the SPACE (SPAtial Calibration and Evaluation in distributed hydrological modelling using satellite remote sensing data) project

In the event that a participant does not complete the full term of their contract with the host institution for any reason, China Horizons is not obligated to refund any part of