• No results found

Design Problems on the Building Construction Sites by Using Frequency Analysis

N/A
N/A
Protected

Academic year: 2020

Share "Design Problems on the Building Construction Sites by Using Frequency Analysis"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Bar chart representing Contractors’ response distribution and average index
Table 2:  Consultants’ response distribution and average index
Table 3:  Project managers’ response distribution and average index
Table 4:  Site engineers’ response distribution and average index
+3

References

Related documents

ABC: B cell activated or non-germinal centre; B-CLU/DLBCL/LB: B-cell lymphoma unclassifiable, with features intermediate between diffuse large B-cell lymphoma and Burkitt lymphoma;

The national health priority areas are disease prevention, mitigation and control; health education, promotion, environmental health and nutrition; governance, coord-

The use of sodium polyacrylate in concrete as a super absorbent polymer has promising potential to increase numerous concrete properties, including concrete

The paper assessed the challenges facing the successful operations of Public Procurement Act 2007 and the result showed that the size and complexity of public procurement,

These data indicate that a per- son may be attacked with aseptic meningitis more than once; usually the causative virus is. different in

There are infinitely many principles of justice (conclusion). 24 “These, Socrates, said Parmenides, are a few, and only a few of the difficulties in which we are involved if

The study presented in this paper shows availability of solar and biogas at villages is sufficient to meet electric demand and can replace use of costlier fuel for

Given that the station uses different presenters who may be non-native speakers of some of the target languages of the listeners of Mulembe FM newscasts, the