• No results found

Technical Assistance On Site

N/A
N/A
Protected

Academic year: 2021

Share "Technical Assistance On Site"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

ISS INTERNATIONAL SpA re se n te d o cu m e n to è p ro p ri e tà d e lla IS S In te rn a tio n a l Sp A e n o n p u ò e ss e re , to ta lm e n te o p a rz ia lm e n te , d ir e tta m e n te o in d ir e tta m e n te , tr a sfe ri to , r ip ro d o tto , c o p ia to , r iv e la to o u sa to , s e n za l’ a u to ri zz a zi o n e d e lla IS S In te rn a tio n a l Sp A . e p re se n t d o cu m e n t is p ro p e rt y o f IS S In te rn a tio n a l Sp A a n d s h a ll n o t b e to ta lly o r p a rti a lly , d ir e ctl y o r i n d ir e ctl y, tr a n sfe rr e d , r e p ro d u ce d , c o p ie d , d is cl o se d o r u se d , w ith o u t th e a u th o ri za tio n o f IS S In te rn a tio n a l Sp A .

Technical Assistance

Technical Assistance “On

“On Site

Site ””

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Tecnomare Italy 2010 12 months Activity in Fano (Italy) for Iraqi project (Zubair)

• Team for coordinating the activities relevant Iraqi project as follows: Mechanical, Electrical, Piping and Construction phase.

Foster Wheeler SpA Italy 2010 6 months Thessaloniki, Greece • Commissioning Services

Saipem SpA Nigeria 2010 18 months Escravos Site • Organization and coordination of all camp personnel.

Saipem SpA Pakistan 2009 12 months Engro Site, UREA production, Pakistan • Mechanical Supervisor Services

Saipem SpA Pakistan 2009 18 months Engro Site, UREA production, Pakistan • Commissioning Services

Saipem SpA Qatar 2010 12 months Qafco V, Mesaieed City, Qatar) • Commissioning HSE Supervision

Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Welding Engineering Supervision Services

Tecnomare Italy 2010 5 months Home Office Home Office • Technical assistance services for the O&M “TOOL Contracts Management”

Comart Italy 2010 8 months Home Office Ravenna • QC engineering Services

• FPSO Project (AQUILA)

(2)

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Ansaldo Energia Italy 2010 2 months ISAB Central Priolo Gargallo • Technical Assistance activities for the Start-Up

Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Electrical design engineering services

Saipem SpA Algeria 2010 24 months Onshore • QA/QC Activities

Tecnomare Italy 2008 / 2010 27 months Kashagan Project at Milan Client’s Head

Quarter •

Engineering Design Service

Snamprogetti U.K. Kazakhstan 2010 24 months Kashagan Project • Civil Engineering Services

Comart Italy 2009/2010 months 7 Client’s Offices in Ravenna, Italy for Manifa

project • Services of E&I Supervision

Jahanpars Engineering &

Construction Iran 2008/2009

16

months Oil center onshore in Darquain

• Construction and

Precommissioning Supervision Activities

Saipem UAE 2008/2009 months 18 3project RD Train NLG Ruwais • Project design and Commissioning Supervision Activities

Saipem Pakistan 2008/2010 months 20 Daharki Pakistan project • Construction Supervision Activities

Comart UAE 2008 months 11 Fabtech Technologies (Jebel Ali, Dubai) • Mechanical and Piping Supervision Activities

Comart Italy 2008/2009 months 11 Client’s Offices in Ravenna • Process Design Services

(3)

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Comart Italy 2008 months 10 Client’s offices in

Ravenna, Italy • Engineering Design Service

Tozzi Sud Italy 2008/2009 months 11 LER’s site • Engineering Design Service and site supervision activities

Saipem SA Nigeria 2008/2009 months 12 Nembe pipeline • Construction Manager Activities

Technip KTI Poland 2008/2009 months 12 Lotos refinery (Danzica) • Piping Supervision Activities

Saipem SA Qatar 2008/2009 months 9 Qatofin project Doha, Qatar • Technical Assistance Services

Urea Casale Qatar 2008 months 12 Fertilizer field • Site supervision activities

Technip SA Ltd Saudi Arabia 2008 months 9 Yansab Olefin-I plant project (Yanbu) • Technical Assistance for Planning Activities

Comart UAE 2008/2009 months 181 Descon Sharja project • Piping Supervision Activities

Bentini Spa France 2007 months 4 Pumping station • Support Services for Mechanical Engineering Activities

Tecnomare Italy 2007/2009 months 26 Milano Client’s Offices • Engineering Design Service

(4)

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Snamprogetti Italy 2007 months 12 Kashagan project construction yard at La Spezia

• Project Management Services

Brindisi LNG Italy 2007 months 10 LNG plant in Brindisi (Italy) • Technical Services

ENI Div. Agip Italy 2007 months 12 Offshore platform Adriatic sea, Italy • Support Services as per D. Lgs. 624/96 requirements

Technip Italy 2007 months 12 ISS’s Rome Home office activities • Technical Assistance for Planning Activities

SICIM Spa Kazakhstan 2007 months 10 TCO Asset development project (Tengzil) • Site Management & Supervison Erection Services

Saipem Kazakhstan Branch Kazakhstan 2007 months 10 Kashagan project • Activities of Drilling Site Contruction

Snamprogetti SA Kazakhstan 2007/2008 months 10 Khursaniyah Oil & Gas plant and the Hawiah NGL plant

• Technical Assistance for the Construction of the Khursaniyah Oil& Gas Plant and the Hawiyah NGL Plant

Snamprogetti KSA 2007 months 10 Khursanyia – Khurais (KSA) • Technical support and site supervision activities

Techint Mexico Mexico 2007 months 10 Onshore • Instrumental Engineering activities

(5)

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Saipem SA Saudi Arabia 2007/2009 months 10 GOSP, WIPS plant Khurais (Yanbu)

• Technical Assistance for the Construction of GOSP and WIPS

Snamprogetti U.K. U.A.E. 2007/2009 months 10 Kashagan project (Sharja) • Specialist Engineering Service on Site

Saipem Energy International Congo 2006/2008 months 10 Ikalou South & Ikalou Platform • Engineering Activities for detailed Electrical Discipline

Tozzi sud France 2006/2008 months 10 LNG plant (Marseille) • E&I Erection and Field Engineer Activities On Site - LNG Plant

Tozzi Sud France 2006/2008 months 10 LNG plant (Marseille) • Site Management & Supervison Erection Services

APS Engineering Italy 2006 months 6 Home office in ISS’s Rome Head Quarter • Process Design Services (FEED Study)

Foster Wheeler Italy Italy 2006/2007 months 10 Onshore • Engineering Activities for Electrical, Instrumental & Piping Discipline

Tecnomare TMKB Kazakhstan 2006/2007 months 8 Karachaganak project Development Aksay • Specialist Engineering Service on Site

Tecnomare TMKB Kazakhstan 2006 months 10 Karachaganak project Development Aksay • Uralsk - Aksai Pipeline Project Site Assistance

Sicim Spa Kazakhstan 2006 months 7 TCO Asset development project (Tengzil) • Erection Assistance on Site

(6)

CLIENT PERIOD DESCRIPTION

Name Logo

COUNTRY

Year Duration Plant / Unit Services

Foster Wheeler Italy UAK 2006 months 8 KSA refinery services • HSE Field Management

Inprotec / Honeywell Algeria Algeria 2005 months 2 Onshore and Home office • Process Control on TPS

Maire Engineering S.p.A. Italy 2005 months 8

Oil treatment centre: Combined cycle T/G power generation plant Trecate

• Engineering Activities for Electrical Discipline; Preparation of Operating & Maintenance Manuals

APS Engineering Italy 2005 months 11 Livorno refinery • E&I Survey Activities

Foster Wheeler Italy Italy 2005 months 5 Onshore

• Engineering Activities for Topping & Vacuum revamping/versus

automotive gasoil sulphur limits; Stress Analysis and metallic structures engineering; Auto-oil 2

Sicim Spa Kazakhstan 2005 months 10 TCO Asset development project (Tengzil) • Technical Assistance on Site

Snamprogetti S.p.A. Qatar 2005 months 12 Ras Laffan LNG Onshore Expansion Project Doha • Engineering Activities for: Utility, Off-Site, Off-Plot Units

EDISON S.p.A. Italy 2004 months 6 Onshore • Engineering Activities for: Piping, E&I Discipline; Preservation & Maintenance Gas Turbine

References

Related documents

Issues and Methods The detailed audit questions issues to be covered, and the audit methods to be used in the mid-project on-site quality audit, will be planned and agreed upon by

The Rehabilitation Services Administration (RSA) conducted an on-site technical assistance (TA) visit with the vocational rehabilitation (VR) agency in Utah, the Utah State Office of

The objective of the Health Care Services Plan is to describe the measures that will be used to deliver on-site health care for the Project workforce, to coordinate health

ATTACHMENT A RESOLUTION OF THE CITY OF PETALUMA PLANNING COMMISSION APPROVING SITE PLAN AND ARCHITECTURAL REVIEW FOR THE CASA GRANDE RESIDENTIAL PROJECT LOCATED AT 240 & 250

• No employee contracts in Canada on US Co’s behalf • Construction site-not >12 months and not US Co’s site • Concern re services PE paragraph.. • Connected project as

Project Title Eastern Wake Site – General Education Building 1 and Student Services Design Services