EMMANUEL AMANTE MASING
emman_masing@yahoo.com
emmanuelamante38@gmail.com
+639085133396
+639205075485
POSITION: PIPING SUPERVISOR
CAREER OBJECTIVE:
To obtain a challenging position that will enhance my qualifications, knowledge, and skills
thereby providing an opportunity to attain growth and to prove myself worthy of the company’s
principles and objectives.
QUALIFICATION:
More than Thirty (30) years in the field of construction and has 16
years of
Supervision
experience in various industries which expertise in Oil and Gas, Like Petrochemical,
Refinery, Power Plant, Pipelines, Piping Spools and structural fabrication & installation,
Pressure Vessels and Storage Tank Fabrication, Ship Building Fabrication & Repairs,
Booster Stations, Gathering Centers, Floating Production Unit Module, Onshore
Off-Shore Oil & Natural Gas Module & Jacket structures, more experience in Brownfield
Area above Ground & Under Ground Piping Facilities and having great Achievements in
plant Shutdown Activities.
WORK EXPERIENCE:
GS Engineering & Construction Egypt (GS E&C)
Project: Egyptian Refining Company (ERC)
Position: Piping Supervisor
December 14, 2017 - July 01 2019
Duties and Responsibilities:
Oversee all stages of process related to the piping execution activities in the project and focus on the availability of materials including daily progress and planned schedules.
Create advance planning of work according to the procedures and regulations that account for safety, quality, and production.
Develop and organize the manpower for the project including the ability to use all Relevant tools and equipment’s and to identify the skills of every individual crew
Assure that specification is in accordance with the safety & quality as per company requirements.
Conduct toolbox meetings daily to maintain the company’s safety rules and regulations. Responsible for Material Takeoff (MTO) and follow up.
Check the fit-up and visual quality of joints prior to QC inspection and monitor the rejection rates on daily basis.
Attend final walkthrough of completed piping systems and verify clearing of all punch lists prior to mechanical completion.
Implement the Field Quality Control Plan/Procedures and construction specification for construction activities.
Ensure timely resolution of any QC problems encountered during construction. Submit daily progress report and any requirements for the next plan of execution.
FGS East Asia Technical Resource Management Inc. Philippines
Project: CLEAN FUEL PROJECT (CFP) Office based
Position: Sr. Piping Supervisor
May 10, 2017 - November 10, 2017
Duties and Responsibilities:
Review drawings and execution plan regarding the brownfield project in Kuwait. Checking Method Statement, Risk assessment, and JSA required for the project. Review Tie-In a scope of work and its required tools and materials.
Assigned in a skilled interview for Kuwait, Bahrain & Egypt project.
Conduct Welders WQT and interview for Kuwait, Bahrain & Egypt projects.
Organizing for preparation of piping systems for testing based on the test pack limits Preparation of test package as per piping system and test package priority schedule.
Ensure all the activities are performed as per approved risk assessment and method statement. Ensure the quantity of the work executed by the construction sub-contractor and monitor the
compliance with the established schedule with quality.
Prepare the tools and equipment preparation related to plant shutdown activities.
SAIPEM INDONESIA KARIMUN BRANCH (SIKB)
Project: JANGKRIK FLOATING PRODUCTION UNIT (FPU)
Position: Piping Supervisor
October 06, 2016 - April 07, 2017
Duties and Responsibilities:
Oversees Piping activities for the Floating Production facilities. Installation of structural piping support and modification.
Conducts Daily toolbox meetings with the regarding Safety, Quality, and Production. Prepares daily reports to Superintendent regarding production and other activities.
Review of the site generated drawings, technical queries, and clarifications, to ensure all works are carried out to the relevant project specifications and ensure all project safety targets are implemented.
Ensure all in-field activities are carried out safely complying with company environmental Health and Safety (HSE) guidelines and procedures.
Delegates work assignment according to personnel responsibility and capability and effectively follow-up and facilitates a strong support system.
Ensure that applicable project specifications and standard codes were correctly executed during piping fabrication and erection.
Supervise fabrication and erection of pipe spools and pipe supports as per the latest issued construction drawing.
Ensure the proper execution of inspection and test in accordance with the field quality control plan and monitor the adequacy result.
KHARAFI NATIONAL (State of Kuwait)
Position: Piping Superintendent
Sept. 20 2005 - October 15 2015
PROJECTS:
New Booster Station – BS-171 at West Kuwait
Main Contractor: Saipem S.P.A Kuwait
December 01, 2014 - October 15, 2015
Installation of Low Sulfur Fuel Oil (LSFO), FG and Gas Oil Pipelines from MAA to
Sabiya and Doha Power Stations. (Part-A)
Main Contractor: Hyundai Engineering & Construction Co. Ltd
September 17, 2013 - November 30, 2014
Installation of Fuel Gas & Gas Oil Pipelines and Pumping Station from MAA to
Azzour and Shuaiba Power Stations. (Part-B)
Main Contractor: Petrofac International Ltd.
March 13, 2011 - September 16, 2013
40” Gas Pipeline from BS-131 to LPG Plant at MAA Refinery
Main Contractor: Petrofac International Ltd.
April 11, 2009 - March 12, 2011
Facility Upgrade & Relocation of Underground Process Piping
Main Contractor: Petrofac International Ltd.
October 01, 2006 - April 10, 2009
Replacement of North Kuwait (NK) Crude Oil & Export System
Main Contractor: Petrofac International Ltd.
Duties and Responsibilities:
Over All In-Charge of the New and Existing Piping Construction Facilities.
Review Construction Plan and Procedure with safety measures, quality, and productivity schemes as per the client’s specification.
Plan the sequence of project tasks and scope assignments including daily, weekly, and monthly look-ahead plan or short interval schedules especially during plant shutdown activities
Work with Project and Construction Management team to develop schedules, regarding manpower, materials, and equipment requirement’s on the project.
Develop a Strong relationship with the field team, general contractors, owners/customers, and vendors to lead a positive work environment.
Create decisions by analyzing information and evaluating results to choose the best solution and solving problems.
Coordinate and implement activities and any other resources necessary to assure a safe and quality execution.
Prepare tracking and documentation of project delays that affect the scope and Communication of the delays as the risks to the project team.
Coordinates all your deliveries from the vendors, fab-shop, or subcontractors to assure the project is completed on time, under budget, and the best quality
Assure the installation is correct as per safety regulations and procedures or enlisting the support of others in the organization as needed.
Analyze situations, identify and forecast pertinent problems, and evaluate realistic options, and recommend/implement appropriate courses of action.
Oversee installation of piping components and equipment following established inspection and testing procedures as per priority schedule of system completion.
Checks subcontractor’s performance and construction cost awareness.
Evaluates piping activities and execution for contract compliance, schedules, issues, impacts, risk, and cost influence factors.
Works within budget and time constraints to ensure customer satisfaction from Erection, Installation, tie-in, and shutdown to pre-commissioning activities.
Manages and provides technical support to the construction field ensuring safe and successful completion of a project.
Prepares advance-planning reports regarding materials, manpower and equipment mobilization, and other requirements.
Coordinates with QA, QC reporting interaction with other departments and clients to assure prompt production and deliveries.
Identify the problems including the flow of productions, material, and technical issues. Prepare daily activities with subcontractors and ensure that works are carried out as per plan
and company specification.
Supervising and managing the site construction activities carried out by subcontractors and ensuring timely completion of the work such as quality, safety aspects, and targets.
Ensure that all site activities adhere to legal regulations, including Environmental regulations of safety and the company.
Conduct site surveys with sub-contractor and engineering team for the clarification of construction facilities where interference occurred.
Conduct weekly HSE assessments and safety walkthrough, safe, and unsafe auditing.
Participate in system walk down of completed piping packages and verify clearing of all punch lists prior to mechanical completion.
Support the Quality Control Manager (QCM) in performing the quality control activities in light of advising on quality control procedures, methods, and practices/actions Analyses and report the Quality Control results.
Report directly to the Site Construction Manager and liaise closely with the Project
Commissioning team in ensuring that required systems /sub-systems are completed in line with the project commissioning schedule of priorities.
Create accurate professional reports and the interface between the subcontractor and another discipline concerning technical issues.
Supervise the construction of sub-contractor and direct manpower ensuring compliance with the applicable specification and standard.
Evaluate the construction and execution work capability according to the programs to be implemented and promote corrective action where necessary.
Oversee and Supervise pipeline activities such as preparation, expedite tools and materials, preparation of equipment’s and manpower mobilization, pipe stringing, fitting up random joints, NDE, joints repair, sandblasting, painting and raise for inspection prior to lowering, Tie-in of final joints, pigging, gauging, water filling to hydro testing and report the daily activity progress to the manager.
Oversee the entire area of the assigned tasks and should assure that proper resources are available to meet the requirements of the specifications.
Assure to follow and established safety procedures and techniques to perform job duties include ng lifting and proper handling of materials.
Correct unsafe conditions in the work area and report any conditions that are not correctable to the supervisor immediately.
Adhere to and support the company’s Health, Safety & Environmental Policies. Building the culture and leading by example.
AL-YUSR TOWNSEND & BOTTUM CO. LTD. (AYTB)
Project: Minor Modification Project (Qatar Petroleum, Dukhan Field) Doha, Qatar
Position: Piping Supervisor
May 03, 2004 - July 14, 2005
Duties and Responsibilities:
Responsible for managing all site construction activities and supervising field personnel as required to ensure adherence to international standards, agreed on budget, schedule, and construction sequence.
Responsible for supervising construction activities of company and Subcontractor trades personnel related to a discipline.
Maintains the highest quality standards while administering good construction safety practices with all on-site activities.
Ensure that all company employees and contractors are adhering to the company Health, Safety, and Environmental excellence policy.
Promote job site safety, encourages safe work practices, and rectifies job site hazards immediately. Regularly participate in HSE meetings, toolbox talks, and daily Jobsite walks. Direct all field personnel including those of construction contractors to achieve completion of
the project on schedule, with quality workmanship that conforms to original plans and specifications.
Ensure that each reporting foreman is capable of performing their allotted scope of work. Contribute to the construction schedule and weekly look-ahead, understand the project plans
and specifications, identify and solve problems, order materials, and schedule s inspections as necessary throughout the process.
Maintain a positive working relationship with customers, contractors, suppliers, and other employees.
Implement standardized construction work processes, procedures, manuals, and systems and create a system of control in each specific area.
Lead, motivate, communicate with, develop, appraise, and fully motivated to achieve the best performance to meet the project and the company's needs.
Ensure that all supervisors understand the construction, and strive to achieve these.
Understands the systems turnover plan and sequence and ensures that the work is performed accordingly.
AL-YUSR TOWNSEND & BOT TUM CO. LTD. (AYTB)
Project: (SABIC) Titanium Tetra chloride Production Facilities Project (Riyadh,
KSA
)
Main Contractor: (Linarco) Linde Arabian Contractors
Position: Piping General Foreman
October 26, 2003 - February 29, 2004
Project: SPC-PDH/Polypropylene Project (Jubail, KSA)
Main Contractor: Samsung Saudi Arabia
Position: Piping General Foreman
November 21, 2002 - October 23, 2003
Duties and Responsibilities:
Assure the safety and well being of the team, mentor, and train those working under my supervision.
Peruse the design and coordinates of each discipline to determine accessibility and mobilization of materials and equipment for the preparation of shutdown activities.
Supervise the production progress based on the actual plan and technical problems. Prepare reports concerning production and scheduling against manpower distribution. Conducts weekly meetings with the manpower relating to the safety policy, Quality &
production.
Ensure that all site activities are performed in an environmentally safe and responsible manner. Collate technical queries to be coordinated with the engineers, quality control, and other
departments for their advanced information and immediate action.
Responsible for coordinating and supervision of execution, testing, and inspection.
Prepares work strategy and mobilization plan for every group to facilitate successful execution. Expedites priorities and segregate materials as per erection requirements to avoid delays. Applies permit to work for a designated area of construction and modification scope prior to
inspection.
Ensure that fabricated spools are preserved in the storage area as per procedure ad specification.
Responsible for supervision of fabrication and installation of the piping system.
Carry out daily reporting and monitoring at site progress in order to achieve as per plan. Ensure timely resolution of any QC problems encountered during construction.
Responsibilities also include a work permit administering.
Understand and implement lockout / tag-out procedures in a safe manner.
Responsible for the planned progress schedule without compromising safety & quality. Monitors craft compliance with project safety program requirements and ensure corrective
measures are implemented.
DOTANAH ENGINEERING & CONTRACTING Sdn. Bhd.
Bintulu Sarawak, Malaysia
Project: MLNG TIGA Project (Train 7 & Train 8) Main Contractor
Position: Yard Supervisor
June 22, 2001 - October 09, 2002
Duties and Responsibilities:
Supervises spool control movement from the fabrication stage up to the erection stage with proper handling of materials to an individual location with documentation and clear traceability. Negotiates with the site engineers regarding priority plan and delivery of materials from
laydown yard to site as per the requirements of erection sequence priority.
Supervises proper handling, the encoding of materials for tracking and assures prompt delivery of items to exact location observing safety with complete identification and tagging system.
Prepares log and monitoring of equipment and manpower under my supervision to avoid the delay of material movement to every individual location.
AL-YUSR TOWNSEND & BOTTUM CO. LTD. (AYTB)
Project: Petrokemya Olifens-3 (Jubail, KSA)
Main Contractor: Chiyoda Engineering co.
Position: Foreman Piping
October 02, 1999 - January 29, 2001
Duties and Responsibilities:
Takes charge of the spools fabrication for Tie-In works and shutdown activities. Erects and Installs Piping spools inside existing facilities using cranes.
Applies permit to work for the designated area of modification scope and inspection.
Reports all activities which belong to the existing plant facilities for closed monitoring and tight supervision by the Petrochemical operation group.
AUSTRIAN ENERGY ARABIA LTD. (AEA)
Jubail, K.S.A.
Project: Vessels/Tank Fabrication
Position: Fabrication Foreman
October 22, 1997 - August 02, 1999
Duties and Responsibilities:
Leading the fabrication works like Heat exchangers, Pressure vessels, Storage tanks; smoke tanks, piping spool, structural column, and other related mechanical works.
Takes charge of the handling materials from the fabrication shop to the painting area. Operates overhead crane and prepares for tank and vessel fabrication.
Layout axis point and orientation prior to the cutting and installation of nozzles. Cuts and bevels using a plasma cutter for cladding and stainless materials.
Reports daily activities to the supervisor and handover to night shift for work continuation.
BELLELI SAUDI HEAVY INDUSTRIES (BSHI) Jubail, K.S.A.
Project: ARAMCO SAFANIYA GOSP 4 PROJECT (On-shore & Off-shore)
Position: Structural Fitter
November 19, 1992 - August 27, 1997
Duties and Responsibilities:
Assigns in the Assembles of Pressure Vessel, Heat exchangers, and Storage Tanks. Executes Tie-in works connected to the underwater pipeline during the offshore project.
Erection and installation of supports for the platform & jacket structure for an offshore project. Fabricates and assembly a brine entry box for desalination projects.
Assembles of petals for tank roof fabrication and installation of nozzles. Fabrication of Columns and structural accessories for several projects. Assigned in an offshore project in Punch listing and hydro-testing activities. Operate Fin making machine for the fabrication of cooler accessories.
ENGINEERING EQUIPMENT Inc. (EEI)
Sta. Maria, Bauan, Batangas, Philippines
Project Fabrication Workshop
Position: Steel Worker
July 28, 1992 - November 12, 1992
Duties and Responsibilities:
Assigned in the fabrication of boiler units, piping spools fabrication, crane girders fabrication. Operates the bar bending machine, plate cutter machine, and rolling machine.
Layout and cutting plates for stiffeners and brackets used for pre-assembly of structures. Fabricates several items such as structural column, rafter, cross bracing, and any structural
accessories.
Modification of damaged columns after welding prior to the QA/QC inspection and approval.
PHILIPPINE NATIONAL OIL Co. (PNOC)
San Rogue, Bauan, Batangas, Philippines
Project: Philippine Shipping Trans Co. & John Brown Power Barge.
Position: Ship Fitter
March 05, 1990 - May 27, 1992
Duties and Responsibilities:
Fabricates modify piping accessories for the repair barge and passenger ships.
Assigned in the fabrication of underground fuel oil storage tanks for entire Philippines projects. Operates cutting and bending machines for replacement of damaged parts of the ships.
Assembly of power barge and the new Philippines Shipping Transportation Company. Assembly of platforms and ladders using for shipbuilding accessories.
Assign in fabrication facilities for different activities related to shipbuilding and repair. Fitting up, Tacking and welding during fabrication of replacement parts.
ATLANTIC GULF & PACIFIC Corp. (AG&P)
San rogue, Bauan, Batangas, Philippines / Bombay High Offshore, India Project: Oil &
Natural Gas Commission of India (ONGC) On-shore & Offshore Projects
Position: Pipe Fitter
September 23, 1988 - January 07, 1990
Duties and Responsibilities:
Assigned in Installation and fabrication of Piping spools, Hydro Testing, and pre-commissioning. Executes tie-in works during the final installation of module platforms offshore.
Attends training for firefighting strategy, familiarization of equipment & safety rules. Segregates piping materials and tagging identification prior to erection.
Reinstatement of piping spools after Hydro Testing & flushing activities. Punch listing activities of the piping system prior to completion and handover.
EDUCATIONAL ATTAINMENT:
Tertiary: Rizal Memorial Colleges Davao City Philippines
Course:
General Radio Communication Operator (GRCO) major in telegraphy
Year Attended:
1984-1986
TRAINING & SEMINARS ATTENDED: YEAR
Basic First Aid Training
2009
(Kuwait Red Crescent Society)
Management & Leadership Training
2008
(E Learning Kharafi National Kuwait)
Basic First Aid Training
2006
(Kuwait Red Crescent Society)
Hearing Conservation Program
2003
(EDI Training & Consultancy SDN BH)
Basic Leadership Skills for the Advance Craft Person
1998
(AYTB- center of excellence)
Operation and Safety Training
1998
(Yusuf Bin Ahmed Kanoo Safety Services)
OTHER SKILLS:
Computer Literate (MS Word, MS Excel) Forklift Operator, Overhead crane Operator,
Basic Leadership skill.
PERSONAL DATA:
Nationality:
Filipino
Age: 53
Date of Birth: June 28 1967
Civil Status: Married
Height: 173 cm
Weight:
90 kg
Permanent Address: Purok-4 Mainit, Nabunturan, Compostela Valley Province 8800
Philippines
Passport number: P3910189B
Date Issued: 20 November 2019 Expiry date: 19 November 2029 Place Issued: DFA DasmariñasContact Persons:
Name: Jananie M. Jamito
Relationship: Sister
Mobile number: +639550732671 / +639192741888
Email: jananie777@gmail.com
Address:
Purok 28-B kawayan, madaum Tagum city Davao Del Norte 8100
Philippines
Reference:
Jerry C. Lopez
Sr. Loss Prevention Engineer ISD loss prevention division Al-Khafji Joint Operations AGOC/KGOC
Al-Khafji, Saudi Arabia +966508234974
+96597384378 lopezj@kjo.com.sa lopezjerry11@yahoo.com
I hereby certify that the above given information is true and correct to the best of my knowledge and belief.