Omega 32 (2004) 145–153

www.elsevier.com/locate/dsw

Job scheduling with dual criteria and sequence-dependent

setups: mathematical versus genetic programming

Sang M. Lee

a;∗

, Arben A. Asllani

b

aDepartment of Management, University of Nebraska-Lincoln, Lincoln, NE 68588, USA bDepartment of Management, University of Tennessee-Chattanooga, Chattanooga, TN 37403-2598, USA

Received 14 October 2002; accepted 3 October 2003

Abstract

Flexibility, speed, and e.ciency are major challenges for operations managers in today’s knowledge-intensive organizations. Such requirements are converted into three production scheduling criteria: (a) minimize the impact of setup times in 4exible production lines when moving from one product to another, (b) minimize number of tardy jobs, and (c) minimize overall production time, or makespan, for a given set of products or services. There is a wide range of solution methodologies for such NP-hard scheduling problems. While mathematical programming models provide optimal solutions, they become too complex to model for large scheduling problems. Simultaneously, heuristic approaches are simpler and very often independent of the problem size, but provide “good” rather than optimal solutions. This paper proposes and compares two alternative solutions: 0-1 mixed integer linear programming and genetic programming. It also provides guidelines that can be used by practitioners in the process of selecting the appropriate scheduling methodology.

?2003 Elsevier Ltd. All rights reserved.

Keywords:Dual criteria scheduling; Sequence dependent setup times; 0-1 mathematical programming; Genetic algorithm

1. Introduction

Improving scheduling systems for greater customer satisfaction and operations e.ciency requires an opti-mization criterion that incorporates both meeting due times and minimizing the makespan. Simultaneously, the sequence-dependent setup time environment with dual criteria is a very common scheduling problem in both man-ufacturing and service organizations [1]. This paper deals with a single-server-scheduling problem with dual criteria: minimizing the number of tardy jobs and makespan, while considering the impact of setup times between jobs. Follow-ing the three-Aeld notation provided by Pinedo [2], such a problem is denoted as 1|sjk|Uj; Cmax. This dual criteria problem is an NP-hard problem since its simpler case of

Corresponding author. Tel.: 472-3915; fax: +1-402-472-5855.

E-mail address:[email protected](S.M. Lee).

the single criterion problem, 1|sjk|Cmaxis an NP-hard prob-lem [2]. Consequently, this scheduling situation provides an appropriate case study for the comparison of mathematical programming and heuristic programming, two viable alter-native solution methodologies.

In general, mathematical programming models ensure the best possible solution for a given scheduling lem. However, due to the complex nature of the prob-lem, such models can not always be implemented to solve large-scale scheduling problems. On the other hand, heuristic approaches can be used to address combinatorial complexity of NP-hard scheduling problems. The purpose of this paper is to (1) propose two alternative solution methodologies for 1|sjk|Uj; Cmax scheduling problem and (2) compare these two distinct approaches in terms of the appropriateness of each approach under diIerent conditions.

The paper is structured as follows: First, a brief lit-erature review of solution methodologies for bi-criteria, sequence-dependent setup times scheduling is provided. 0305-0483/$ - see front matter?2003 Elsevier Ltd. All rights reserved.

(2)

Then, a 0-1 mixed integer programming model is formu-lated to solve such a scheduling problem. In Section 4, a genetic algorithm (GA) is proposed to solve the same scheduling problem. In Section5, we compare two methods and provide guidelines that can be used by practitioners in the process of solving dual criteria scheduling problems with sequence dependent setup times.

2. Literature review

Most of the studies dealing with scheduling have been conAned to optimization of a single criterion. Many re-searchers have considered a variety of scheduling problems with a single performance measure such as the average 4ow time, maximum completion time, or tardiness [3]. Baker and Scudder [4] classiAed scheduling problems according to the number of due dates, tightness of due dates and types of penalties involved. The distinct due dates problem without inserted idle time was considered by Abdul-Razaqand Potts [5] and Ow and Morton [6]. Abdul-Razaqand Potts [5] proposed a lower bound scheme based on the branch and bound algorithm. Ow and Morton [6] considered a beam search method in which a limited number of solution paths are investigated in parallel. The intent of the search technique is to search quickly with no backtracking. Thus, the optimal solution is not guar-anteed by the method. Fry et al. [7] and Yano and Kim [8] presented algorithms for optimal timing of a given sequence.

Scheduling decisions frequently involve consideration of more than one criterion [9–13]. The bi-criteria scheduling problems are generally divided into two classes. In the Arst class, the problem involves minimizing one criterion subject to the constraint that the other criterion has to be optimized. The pioneering work in this class can be at-tributed to Smith [14] who considered the single-machine problem with the maximum tardiness as the primary cri-terion and mean 4ow time as the secondary cricri-terion. Extensions of Smith’s work with the consideration of dif-ferent primary and secondary criterion have been studied by Heck and Roberts [15], Emmons [16], Miyazaki [17], Bianco and Ricciardelli [18], Shanthikumar [19], Chand and Schneeberger [20], and Chen and BulAn [21]. The problem considered in this paper belongs to this class. We solved it lexicographically by treating the minimiza-tion of the number of tardy jobs as the primary objec-tive, and minimization of the makespan as the secondary objective.

In the second class of problems, both criteria are con-sidered equally important and the problem involves Anding e.cient (non-dominated) schedules. Van Wassenhove and Gelders [22] extended the problem solved by Smith [14], and developed an algorithm which provides an e.cient so-lution for the criteria of mean 4ow time and maximum tar-diness. Several extensions of the single-machine

schedul-ing problem with the consideration of diIerent criteria have been reported [21,23–29].

Since the 1960s, there has been an increasing interest in heuristic techniques, such as simulated annealing, tabu search, and GAs in Anding optimal or good solutions to large problems. The term used to refer to such techniques is “evolutionary computation.” The best known algorithms in this class include GAs [30], evolution strategies [31], evolutionary programming [32], and genetic programming [33]. GA has demonstrated their potential for solving di.-cult intractable optimization problems. GA is proven to be e.cient and adaptive even for complex constrained opti-mization problems. Thus GAs may well be suitable to han-dle the complexity of multi-criteria scheduling problems [13,34].

Other works in this area include Lee and Choi [35] who considered a job-scheduling problem with distinct due dates in a single machine and Liu and Tang [36] who proposed a modiAed GA for the single machine-scheduling prob-lem with ready times. Portman et al. [37] discussed opti-mal methods for solving k-stage hybrid 4owshop schedul-ing problems and Figielska [38] considered the problem of scheduling preemptive jobs on unrelated parallel machines. The general conceptual design of the GA that we propose in this paper is based on the guidelines provided by Houpt and Houpt [39]. SpeciAc details, such as, incorporating setups, designing crossover operator, and retaining the best solution using “elitism” are based on the work of Rubin and Ragatz [40], Poon and Carter [41], Murata et al. [11], and Neppalli et al. [42].

As noted above, there is a wide range of solution methodologies for solving NP-hard scheduling problems. Recently, there has been an increased interest in comparing the performance of such methodologies under particular scheduling constraints [43–48]. For large and complex scheduling problems, GAs are found to provide optimal or near optimal solutions in a reasonable amount of time [49]. Simultaneously, it is observed that GAs perform less e.ciently than integer programming for small to medium sized problems [50]. Continuing this stream of research, we compare our proposed optimal and heuristic solutions with respect to ease of use and quality of the solution.

3. Mathematical formulation for 1|sjk|Uj; Cmax

In this section, we Arst provide a 0-1 mixed inte-ger linear programming formulation of the dual criteria scheduling with sequence dependent setup times. The ob-jective function includes tardiness and makespan. There is a large number of software designed to solve linear programming models. Considering the availability of the software to scheduling practitioners, we selected Microsoft Excel’s Solver Add-in as a tool to solve and analyze the problem.

(3)

3.1. Notations

Indices: i orj= 1; : : : ; njob index used as a unique identiAer for each job;

k = 1; : : : ; n job index used to identify the position of a job in a given sequence;

Parameters

pj Processing time for jobj;

dj Due time for jobj;

S0j Setup time of jobjin the Arst sequence position (initial set up time);

Sij Incremental setup time of switching from job ito jobj;

M A very large number;

Variables

xjk 1 if jobjis assigned to thekth position in the sequence; 0, otherwise;

xijk 1 if jobjis assigned in thekth position and is preceded by jobi; 0, otherwise;

U(k) 1 if job in thekth position is tardy; 0, otherwise; C(k) Completion time for the job in thekth position

in the sequence;

S(k) Setup time for the job in thekth position in the sequence;

P(k) Processing time for the job in thekth position in the sequence; and

d(k) Due time for the job in thekth position in the sequence.

3.2. Formulation

Using the above notations, a 0-1 mixed integer LP formulation is presented: Minimize Z1=n k=1 U(k) (1) Minimize Z2=C(n) (2) subject to n j=1 xjk= 1; k= 1; : : : ; n (3) n k=1 xjk= 1; j= 1; : : : ; n (4) n i=1 n j=1 xijk= 1; k= 1; : : : ; n (5) xjk+xik116xijk; i= 1; : : : ; n; j= 1; : : : ; n; and k= 2; : : : ; n (6) S(1) =n j=1 S0jxj1; (7) S(k) =n j=1 n i=1 Sijxijk; k= 2; : : : ; n (8) P(k) =n j=1 xjkpj; k= 1; : : : ; n (9) C(k) =C(k1) +S(k) +P(k); k= 1; : : : ; n (10) d(k) =n j=1 xjkdj; k= 1; : : : ; n (11) C(k) +d(k)6M(1U(k)); k= 1; : : : ; n (12) C(k)d(k)6MU(k); k= 1; : : : ; n (13) U(k); xjk; xijk={0;1}; i= 1; : : : ; n; j= 1; : : : ; n; and k= 1; : : : ; n (14) C(k); S(k); P(k); d(k)¿0; k= 1; : : : ; n (15) Eqs. (1) and (2) are the objective functions. Eq. (1) min-imizes the number of tardy jobs and Eq. (2) minimizes the makespan. Eqs. (3) and (4) assure that only one job is as-signed to each sequence position and a job is asas-signed to only one sequence location, respectively. Eqs. (5) and (6) assure that only one job, jobj, is assigned to follow jobi. Eq. (7) determines the setup time of the Arst sequence po-sition while Eq. (8) determines the setup time of thekth (k ¿1) sequence position. Eq. (9) determines the process-ing time, and Eq. (10) determines the completion time of thekth sequence position. Eq. (11) identiAes the due date of the job in thekth sequence position. Eqs. (12) and (13) identify the tardy positions of the job sequence, whereM is a very large positive integer. Finally, Eqs. (14) and (15) represent the integrality and non-negativity constraints. 3.3. Results

From the practitioner perspective, a major concern for the mathematical formulation of this class of scheduling prob-lems would be the number of constraints and decision vari-ables. The model presented above hasn3+n2+5nvariables andn3+9nconstraints, wherenis the number of jobs which must be sequenced. Fig.1graphically represents the change in the number of decision variables and the number of prob-lem constraints when the number of jobs to be scheduled increases.

As shown above, when the number of jobs increases, the number of constraints and decision variables will increase signiAcantly. For example, a Ave-job scheduling problem re-quires 175 decision variables and 170 constraints. A 10-job scheduling problem requires 1150 decision variables and 1090 constraints. When more than 20 jobs are considered, the number of decision variables and constraints can become well above ten thousands. Such large models make the for-mulation and implementation of the proposed mathematical model time consuming and impractical.

(4)

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 5 10 15 20 25 Number of Jobs

Decision Variables Constraints

Fig. 1. Required number of decision variables and constraints vs. number of jobs.

However, since the solution derived by such models is optimal, operations schedulers should consider the use of such models when the number of jobs is relatively small. Scheduling complexity in such cases can also be avoided by preparing a user-friendly interface for the purpose of data entering and solution interpretations.

Table 1

Main parameters of GA

Parameter Notation Description Variable

Number of Jobs JOBS Number of jobs to be sequenced Independent

Population Size POPSIZE Number of sequences in each generation Independent

Weight in the objective function W1 A value between 0 and 1 used to ponder the value of makespan into the objective function. SinceW2 (the weight for tardiness) is a function ofW1, the weight for tardiness is omitted from the analysis

Independent

W2 = 1W1

Mutation rate MUTRATE A value between 0 and 1 which represent the portion of new

members in each generation generated using the mutation function Independent Crossover rate CROSRATE A value between 0 and 1 which represent the portion of new

members in each generation generated using the crossover function Independent Due time ratio DUERATIO A random integer (¿1) which represents an overall ratio between

due time and processing time for each job. The larger the value the more likely the due time is signiAcantly greater than processing time

Independent

Setup time ratio SETRATIO A random integer (¿1) which represents an overall ratio between setup times and processing time for each job. The larger the val-ues the more likely the setup times are signiAcantly greater than processing time

Independent

Population Vs. jobs POPJOB Ratio between population size and number of jobs Independent Mutation Vs. crossover MUTCROS Ratio between mutation and crossover rate Independent Number of generations GEN Number of generations needed to achieve an optimal solution. The

maximum value of this parameter was arbitrary chosen as1500, i.e. the algorithm was allowed to search for an optimal solution for no more than 1500 generations

Dependent The above problem was solved for 24 diIerent sets of simulated data using Microsoft Excel’s Solver Add-in. We kept the number of jobs relatively small: from 5 to 8 and data about processing times were normally distributed with an arbitrarily chosen mean of 100 units. As shown in Table1, due and setup times were randomly generated by using an integer which represents an overall ratio between due (setup) time and processing time for each job. The larger the value of this integer, the more likely the due (setup) time is signiAcantly greater than processing time. As mentioned earlier, we solved this problem by Arst ignor-ing the secondary objective. Then the problem is resolved for the secondary objective while the primary objective with its optimal value is treated as a constraint. The same set of data was used to validate the performance of GA as proposed in the following section.

4. GA for 1|sjk|Uj; Cmax

GAs, when applied to scheduling, view sequences or schedules as individuals, which are members of a popula-tion. Each individual is characterized by its Atness value. The Atness of an individual is measured by the associated value of the objective function. The procedure works itera-tively and each iteration is referred to as a new generation. The proposed algorithm is shown in Fig.2.

(5)

Fig. 2. GA for 1|sjk|Uj; Cmax scheduling problem.

A generation of individuals consists of surviving indi-viduals of the previous generation and new solutions or oIsprings. The population size usually remains constant from one generation to the next. The oIspring is generated through reproduction and mutation of individuals (parents) from the previous generation. Individuals at times are re-ferred to as chromosomes. A chromosome may consist of sub-chromosomes, each one containing the information re-garding the job sequence on a machine. A mutation in a parent chromosome may be equivalent to a pair-wise inter-change in the corresponding sequence. In each generation, the Attest individuals reproduce and the least At die. As de-scribed in the Agure, the proposed GA consists of several steps.

Step1:Create population

De:ne job structure. Each job consists of several mem-bers, such as job name, processing time, due date, and initial setup time.

De:ne sequence structure. Each sequence consists of two members: (1) anN-dimensional array of job struc-tures, and (2) anN×Nsetup matrix. Each element of

this matrix represents the setup time between jobiand j, if jobiprecedes jobj. Whenever a new permutation is achieved, the setup time matrix must be adjusted accordingly. This is handled by creating a speciAc ad-just setup timefunction. This function uses the list of jobs in a given sequence as a parameter and is called upon every time a crossover or a permutation occurs. De:ne population structure. Each generation consist

of a vector of sequences of POPSIZE, the population size. For the Arst generation, applying a mutation oper-ator to the initial sequence creates the initial population. (See details for the mutation operator in Step 3). Sub-sequent generations are created as described in Step 3 of the algorithm.

Step2:Evaluate cost. The Atness value or cost of each se-quence is used as an optimization objective function for the algorithm. The values of makespan and tardiness are normal-ized and then factored with respective weights to compute the overall objective function. Using diIerent weights, one may expand the dimensions of the objective function and provide solutions that incorporate multiple objective crite-ria. The following inductive deAnitions are used to compute makespan and tardiness for each sequence:

Makespanis the time when the last job in the sequence leaves the system. Makespan can be computed as the completion time of thenth job in the sequence. C(k) =C(k1) +S(k) +P(k);

where

C(k) is completion time of the kth job in the sequence

S(k) is the setup time between the (k1)th and thekth job in the sequence

P(k) is the processing time of thekth job in the sequence

Tardinessfor each job is computed by comparing the completion time for each job with the due date. For a given job in the sequence, if the due date is greater than the completion time, then the job is considered as tardy.

Step3:Create new generation. After sorting the popu-lation members of the previous generation in an ascending order based on the cost, the process of creating a new gen-eration consist of three main steps:

Keep best members. The process of assigning the Arst few best members from the old generation to the new generation will ensure a gradual improvement of the solution. The algorithm also saves the best sequence as a candidate optimal solution.

Crossover operator. The following crossover opera-tor code is suggested. This operaopera-tor generates new se-quences and ensures the feasibility of the algorithm.

(6)

Stepa: Select sequences PARENT 1 and PARENT 2 as two sequences from the old generation. Stepb: Generatekas a random number between 0

andN, whereNis number of jobs in the sequence. Stepc: Select the Arstk members of PARENT 1

and save them in the new OFFSPRING.

Stepd: Complete the rest (Nk) members of the OFFSPRING by following the following rules: If the rest of the members from PARENT 1 appear in the MOTHER sequence, add the appearing mem-ber to the OFFSPRING following the same order they appear in the PARENT 2 sequence. Stepe: Adjust setup matrix for the OFFSPRING

sequence.

Mutation operator. The crossover operator is focused on creating alternative solutions around the best so-lutions achieved so far. In order to avoid the risk of remaining in the local optima, a mutation operator is suggested. For sequencing problems, mutation can be achieved by swapping two random jobs in a given se-quence. The algorithm for this process consists of the following steps:

Stepa: Randomly generate two integers k ands between 0 andN, whereN is number of jobs in the sequence.

Step b: Swap jobs that are in the kth and sth position in a given SEQUENCE.

Step c: Adjust the setup matrix for the new SEQUENCE.

The process of creating new generations continues until a given number of generations is achieved or the cost of a given solution achieves an acceptable level. The genetic pro-gram was allowed to run for about 100 generations for the 24 four problems previously solved via mathematical program-ming. For 21 of such scheduling problems GA achieved the optimal solution within relatively short number of genera-tions. In three cases, the optimal solution was not achieved even after the algorithm exceeded 100 generations.

5. Results of GA

In addition to the above 24 randomly generated problems, we also generated 100 problems for each of the following group of problems: small problems with an average number of jobs of 10 units, problems with an average number of jobs of 15 units, problems with an average number of jobs of 20 units, and lastly large problems with an average number of jobs of 25 units. The standard deviation in all cases was set at 5 units. Again, processing time was generated using a normal distribution with a mean of 100 units. Also, due and setup times were generated using the criteria explained in Table1. As a result, the total number of cases solved by the GA program was 424 (4100 + 24) with a good representation of small, medium and large scheduling problems.

Table1also lists other dependent variables which were included in our analysis for the purpose of Ane tuning the proposed algorithm. The dependent variable is represented by the number of generations (GEN) needed to achieve an optimal solution. The maximum value of this parameter was arbitrary chosen as 1500. First the algorithm was allowed to search for an optimal solution for up to 1000 generations. This solution was monitored during the next 500 genera-tions and if no improvements were recorded, then we con-sidered that the algorithm has achieved an optimal solution. Otherwise, the problem was disregarded, reducing the total number of cases that were used for further statistical anal-ysis to 204. This approach accentuates GEN as a stronger representation of solution quality and is consistent with the study of Tan et al. [46]. The only diIerence is that the above mentioned research used computer run time instead of the number of generations (iterations).

Pearson correlation coe.cients were calculated to see if there is a linear association between independent variables and number of generations. Table2 shows the results of this analysis. There are two important Andings to mention by analyzing this table. First, there is no signiAcant corre-lation between the number of jobs to be sequenced and the number of generations required to derive a solution. Thus, contrary to the mathematical formulation, we can conclude that the number of jobs does not aIect the performance of the algorithm. This is a signiAcant advantage of the pro-posed GA algorithm as compared to the previous mathe-matical programming model used to solve this sequencing problem.

Second, there is a signiAcant indirect correlation between setup time and the number of generations. The algorithm tends to perform better when setup times between consecu-tive jobs increase for the same processing times. In order to increase the reliability of our analysis, we performed a dis-criminant analysis. In addition, we added other dependent variables in our analysis, as shown in Table3.

This table shows signiAcance tests for equality of group means for three parameters of the algorithm. The algo-rithm shows signiAcantly better performance when the population size selected increases over the same number of jobs (0:007¡0:01). The same can be concluded for the crossover rate, where the observed signiAcance level is 0.05.

6. Conclusions and recommendations

This paper provides two alternative solution method-ologies for an NP hard scheduling problem: single ma-chine, sequence dependent-setup time, and dual crite-ria. The two alternative methodologies are a 0-1 mixed integer-programming and a genetic search algorithm. Due to increasing computer presence and its processing power in today’s workplace, operation schedulers’ concern is not the time that a computer takes to generate a solution. Instead,

(7)

Table 2

Pearson correlation coe.cients for GA

JOBS POPSIZE W1 MUTRATE CROSRATE DUERATIO SETRATIO

GEN Coe.cient 0.063 0.075 0.104 0.030 0.031 0:028 0:142

SigniAcance 0.370 0.284 0.137 0.670 0.066 0.694 0.043

Table 3

Tests of equality of group means

Wilks’ lambda F df1 df2 Sig.

POPJOB 0.925 7.688 1 95 0.007

MUTRATE 0.969 3.043 1 95 0.084

CROSRATE 0.944 5.644 1 95 0.020

Table 4

Practical recommendations for 1|sjk|Uj; Cmaxscheduling problem

IF goal is Andinga(n): AND IF number of AND IF ratio between setup THEN solution methodology jobs ranges: and processing times is: suggested is:

Optimal solution Less than 5 High 0-1 mathematical programming

Low 0-1 mathematical programming

From 6 to 10 High Genetic algorithm

Low 0-1 mathematical programming

Above 11 High Genetic algorithm

Low Genetic algorithm

Practical solution Less than 5 High 0-1 mathematical programming

Low 0-1 mathematical programming

From 6 to 10 High Genetic algorithm

Low Genetic algorithm

Above 11 High Genetic algorithm

Low Genetic algorithm

more practical goals would be to improve user interface and to achieve the best possible solution. Table4provides some practical recommendations that can be used to select one of the above two solution methods.

For the 1|sjk|Uj; Cmax scheduling problem, our And-ings suggest that when the major concern of the opera-tions scheduler is the quality of the output, and when the number of jobs to be sequenced is relatively small, then mathematical programming is an appropriate methodology. While mathematical programming generally ensures an op-timal solution, genetic algorithms do not always guaran-tee an optimal solution. If the number of jobs to be se-quenced is relatively large or when achieving a “good” solution is acceptable, then genetic algorithms (GAs) can be used. The number of jobs that need to be sequenced does not aIect the GA performance. In contrast, mathemat-ical programming model becomes very complex and even unmanageable when the number of jobs is more than ten. In addition, our analysis shows that the proposed GA

per-forms better when the ratio between sequence-dependent setup times and processing times for each job is relatively large.

References

[1] Cheng ETC, Gupta JND, Wang G. A review of 4owshop scheduling research with setup times. Production and Operations Management 2000;9(3):262–82.

[2] Pinedo M. Scheduling: theory, algorithms, and systems. Englewood CliIs, NJ: Prentice-Hall, Inc.; 1995.

[3] Tzafestas S, Triantafyllakis A. Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithms. Mathematics and Computers in Simulation 1993;35(5):397–434.

[4] Baker KR, Scudder GD. Sequencing with earliness and tardiness penalties: a review. Operations Research 1990;38(1):22–36.

(8)

[5] Abdul-RazaqTS, Potts CN. Dynamic programming state-space relaxation for single-machine scheduling. Journal of Operations Research Society 1988;39(2):141–52. [6] Ow PS, Morton TE. The single machine early/tardy problem.

Management Science 1989;35(2):177–91.

[7] Fry TD, Armstrong RD, Blackstone JH. Minimizing weighted absolute deviation in single machine scheduling. IIE Transactions 1987;19(4):445–50.

[8] Yano CA, Kim YD. Algorithms for a class of single-machine weighted tardiness and earliness problems. European Journal of Operational Research 1991;52(2):167–78.

[9] Ruiz-Diaz F, French S. A survey of multi-objective combinatorial scheduling. In: French S, Thomas LC, Hartkey R, White DJ, editors. Multi-objective decision making. New York, NY: Academic Press; 1983. p. 59–77.

[10] Dileepan P, Sen T. Bicriteria state scheduling research for a single machine. Omega 2000;16:53–9.

[11] Murata T, Ishibuchi H, Tanaka H. Multi-objective genetic algorithm and its applications to 4owshop scheduling. Computer and Industrial Engineering 1996;30(4):957–69. [12] Allahverdi A. The two- and m-machine 4owshop scheduling

problems with bicriteria of makespan and mean 4ow time. European Journal of Operational Research 2003;147(2): 373–96.

[13] Koksalan M, Keha AB. Using genetic algorithm for single-machine bicriteria scheduling problems. European Journal of Operational Research 2003;145(3):543–56. [14] Smith WE. Various optimizers for single state production.

Naval Research Logistics Quarterly 1957;3:56–66. [15] Heck H, Roberts S. A note on the extension of a result on

scheduling with secondary criteria. Naval Research Logistics Quarterly 1972;19:403–5.

[16] Emmons H. One machine sequencing to minimize mean 4ow time with minimum number of tardy. Naval Research Logistics Quarterly 1975;22:585–92.

[17] Miyazaki S. One machine scheduling problem with dual criteria. Journal of Operations Research Society of Japan 1981;24(1):37–51.

[18] Bianco L, Ricciardelli S. Scheduling of a single machine to minimize total weighted completion time subject to release dates. Naval Research Logistics Quarterly 1982;29:151–67. [19] Shanthikumar JG. Scheduling n jobs on one machine to

minimize the maximum tardiness with minimum number of tardy. Computers & Operations Research 1983;10(3):255–66. [20] Chand S, Schneeberger H. A note on the single machine scheduling problem with weighted completion time and maximum allowable tardiness. Naval Research Logistics Quarterly 1986;33:551–7.

[21] Chen CL, BulAn RL. Complexity of single machine, multi-criteria scheduling problem. European Journal of Operational Research 1993;70(1):115–25.

[22] Van Wassenhove LN, Gelders LF. Solving a bicriterion scheduling problem. European Journal of Operational Research 1980;4(1):42–8.

[23] Vickson RG. Choosing the job sequence and processing times to minimize total processing plus 4ow cost on a single machine. Operations Research 1980;28(5):1155–67. [24] Barnes JW, Vanston LK. Scheduling jobs with linear delay

penalties and sequence dependent setup costs. Operations Research 1981;29(1):146–60.

[25] Van Wassenhove LN, Baker KR. A bicriterion approach to time/cost trade-oIs in sequencing. European Journal of Operational Research 1982;11(1):48–54.

[26] Sen T, Gupta SK. A branch-and-bound procedure to solve a bicriterion scheduling problem. IIE Transactions 1983;15(1):84–8.

[27] Nelson RT, Sarin RK, Daniels RL. Scheduling with multiple performance measures: the one machine case. Management Science 1986;32(4):464–79.

[28] Bagchi U. Simultaneous minimization of mean and variation of 4ow time and waiting time in single machine systems. Operations Research 1989;37(1):118–25.

[29] Cenna AA, Tabucanon MT. Bicriteria scheduling problem in a job shop with parallel processors. International Journal of Production Economics 1991;25(1):95–101.

[30] Holland J. Adaptation in natural and artiAcial systems. Cambridge, MA: University of Michigan Press, Ann Arbor, MI, 1975; Cambridge, MA: MIT Press, 1992.

[31] Rechenberg I. Evolution strategie: optimieriung technischer systems nach prinzipien der bilologischen evolution. Stuttgart, Germany: Formmann-Holzboog; 1973.

[32] Fogel L, Owens A, Walsh M. ArtiAcial intelligence through simulated evolution. New York, NY: Wiley; 1966. [33] Koza JR. Genetic programming. Cambridge, MA: MIT Press;

1992.

[34] Gen M, Cheng R. Genetic algorithm and engineering optimization. New York, NY: Wiley; 2000.

[35] Lee CY, Choi JY. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers & Operations Research 1995;22(8):857–69.

[36] Liu J, Tang L. A modiAed genetic algorithm for single machine scheduling. Computers & Industrial Engineering 1999;37(1):43–6.

[37] Portmann MC, Vignier A, Dardilhac D, Dezalay D. Branch and bound crossed with GA to solve hybrid 4owshops. European Journal of Operational Research 1998;107(2): 389–400.

[38] Figielska E. Preemptive scheduling with changeovers: using column generation technique and genetic algorithm. Computers Industrial Engineering 1999;37(1):81–4. [39] Houpt RL, Houpt SE. Practical genetic algorithms. New York,

NY: Wiley; 1998.

[40] Rubin PA, Ragatz GL. Scheduling in a sequence dependent setup environment with genetic search. Computers & Operations Research 1995;221(1):85–99.

[41] Poon PW, Carter JN. Genetic algorithm crossover operators for ordering applications. Computers & Operations Research 1995;22(1):135–47.

[42] Neppalli VR, Chen CL, Gupta JN. Genetic algorithms for the two stage bicriteria 4ow shop problem. European Journal of Operational Research 1996;95(2):356–73.

[43] Masatoshi S, Kosuke K, Hideaki S, Toshihiro S. Fuzzy programming for multiobjective 0–1 programming problems through revised genetic algorithms. European Journal of Operational Research 1997;97(1):149–58.

[44] Masatoshi S, Toshihiro S. An interactive fuzzy satisAcing method for multiobjective 0–1 programming with fuzzy numbers through genetic algorithms with double strings. European Journal of Operational Research 1998;107(3): 564–74.

(9)

[45] Masatoshi S, Ichiro N, Masatoshi H. Interactive fuzzy programming for multi-level 0–1 programming problems through genetic algorithms. European Journal of Operational Research 1999;114(3):580–8.

[46] Tan KC, Narasimhan R, Rubin PA, Ragatz GL. A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times. Omega 2000;28:313–26.

[47] Roslof J, Harjunkoski I, Westerlund T, Isaksson J. Solving a large-scale industrial scheduling problem using MILP combined with heuristic procedure. European Journal of Operational Research 2002;138(1):29–42.

[48] Yoon SH, Ventura JA. An application of genetic algorithms to lot-streaming 4ow shop scheduling. IIE Transactions 2002;34(9):779–87.

[49] Aytug H, Saydam C. Solving large-scale maximum expected covering location problems by genetic algorithms: a comparative study. European Journal of Operational Research 2002;141(3):480–94.

[50] Mirrazavi SK, Jones DF, Tamiz M. A comparison of genetic and conventional methods for the solution of integer goal programmes. European Journal of Operational Research 1999;132(3):594–602.

References

Related documents

In sum, these results suggest that the expression of anger and negative emotions was characteristic for Trump’s cam- paign speeches and supports the idea that emotional reso- nance

miR-506-3p or HMGA2 on the protein levels of PCNA and MMP9 also confirmed that miR-506-3p inhibition or HMGA2 overexpression could reverse the inhibition function of

As a EuroDYNA member I have benefited enormously from this valuable resource,” said Niels Galjart, Department of Cell Biology and Genetics, Erasmus University, Rotterdam

Locality label data associated with the specimen from Democratic Republic of the Congo deposited in Pic’s collection (see Additional material examined) and labeled by Pic as a

pCDNA-BANCR- mediated overexpression of BANCR significantly inhibited proliferation, promoted apoptosis and suppressed metasta- sis capabilities of bladder cancer T24 and SW780

Contribution to knowledge by unveiling the forces and factors shaping mixed socio-economic composition of settlers in informal settlements and relating them

As we can observe in column 1, the coefficient for the land Gini distribution is negative and significant, thus confirming the hypothesis that both the level and the change towards

We show, on this mobile phone database, that face and speaker recognition can be performed in a mobile environment and using score fusion can improve the performance by more than 25%