• No results found

Resource and Workflow Management Support in Teletranslation

N/A
N/A
Protected

Academic year: 2021

Share "Resource and Workflow Management Support in Teletranslation"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

The distribution of trade sizes and trading volumes are investigated based on the limit order book data of 22 liquid Chinese stocks listed on the Shenzhen Stock Exchange in the

In the present study, we reported that WISP2 overexpression inhibited cell growth and induced cell apoptosis, suppressed cell migra- tion and invasion in ESCC cells.. Moreover,

• The NEPA assessment tool assists users in meeting federally- mandated requirements to consider environmental and other related issues for their proposed actions.

A second camming style belay device is placed on the load rope at the point where the worker will begin his or her ascent and connected to the worker’s belay loop with a triple

Chemical manufacturers, importers, and distributors of hazardous chemicals are all required to provide the appropriate labels and material safety data sheets to the employers to

past treatment; patient who has recently completed a course of anti-TB therapy) There is no patient reason exclusion allowed in this measure There is no system

higher levels of MVPA and the Sport/Exercise Index were associated with a lower risk of incident hypertension, while no association was observed for work, active living, or

Electives:- (At most 1 Elective Course) BCE 3106 Communication Systems BCE 3107 Communications Technology CSC 3101 Software Engineering – I CSC 3105 Computer Graphics