Rural Health Clinic

LAGC Plan Room - Southwest

Project documents obtained from www.CentralBidding.com 14-Jan-2021 02:32:25 PM

(2)

PROJECT: ALLEN PARISH HOSPITAL, RURAL HEALTH CLINIC PROJECT #: 4005

LOCATION: KINDER, LOUISIANA ADDENDA DATE: WEDNESDAY, JAN 13, 2021 CD ISSUE DATE: WEDNESDAY, NOV 11, 2020

This Addendum 2 shall amend the current Construction Documents issued on Click here to enter a date.

for the above referenced project. They shall be considered part of the bid documents for the above

mentioned project and shall be incorporated integrally therewith. The following additions, deletions,

modifications, or clarifications shall be made to the appropriate sections of the plans and specifications,

and all other conditions shall remain the same. Where provisions of the following supplementary data

differ from those of the original bid documents, this Addendum shall govern and take precedence.

Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result

of this Addendum. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid

form.

Failure to do so may be cause for disqualification.

The bid documents are modified and clarified as follows:

GENERAL CLARIFICATIONS:

This Addendum No. 2 includes the following:

General Clarification Questions

1.

The bid deadline has been extended to Wednesday, January 27

th

, 2021. Time and place of

receipt of bids remains unchanged.

2.

The Owner has elected to not release the A/E Estimate of Probable Construction cost.

3.

The A/E Estimate Time of Completion is: 270 calendar days.

(3)

PAGE|2

4.

The Owner’s Insurance requirements are:

Medical & Indemnity

Statutory Limits for Louisiana

Bodily Injury by Accident

$1,000,000 each accident

Bodily Injury by Disease

$1,000,000 policy limit

Bodily Injury by Disease

$1,000,000 each employee

General Aggregate

$2,000,000

Products/Completed Operations Aggregate

$1,000,000

Personal and Advertising Injury

$1,000,000

Each Occurrence

$1,000,000

Fire Damage

$75,000

Medical Payment

$5,000

Business Automobile

Each accident – combined single limit bases

$1,000,000

Umbrella or Excess Liability

General Aggregate

$5,000,000

Each Occurrence

$5,000,000

5.

Is fiber reinforcing required?

Yes, as per specification section 03 30 00, Cast-In-Place Concrete, paragraphs 1.6 and 2.6.

6.

Is metal lath required behind manufactured stone?

Yes, as per specification section 04 73 00, Manufactured Stone Masonry, and via inclusion in

the drawings, as per this Addendum.

7.

Is a roof hatch required?

No.

8.

Regarding using the material suppliers or subcontractors in the HealthTrust documents of

Addendum No. 1, the bidders are encouraged to contact the specific vendors or subcontractors, it

is not a requirement that the subcontractors indicated are the sole source for these products or

labor.

9.

From Addendum No.1, Alternate No. 1, do we delete the manufactured stone on the walls also?

No, the manufactured stone remains on the exterior walls.

10.

Please clarify the total runtime for the diesel generator.

The fuel tank should be sized to run the generator for a minimum of 8 hours without refilling.

The tank should be a belly tank.

(4)

The existence of soil cement below the paving has not been verified. Please reference the

Geotechnical Report in the Project Manual. The existing base material appears to vary from

a clayey gravel to silt.

12.

There are several locations of 18 inch RCP in the ditch at the road. Is this an existing condition

or is this to be new?

The existing 18 inch RCP are to remain. See Civil plan sheet 005.

13.

Where is the typical Rip Rap section detail used?

The typical riprap section should be used at the outfall of the detention pond discharge pipe.

See Civil sheet 005.

14.

Will the Owner allow us to stock pile the spoil dirt from the drill shafts and grade beams onsite,

or will offsite disposal be needed?

Yes, the specific location for stockpiling on site will be determined with the Owner.

15.

Confirm if Laticrete Hydro Ban Waterproof Membrane is to be installed beneath all ceramic floor

tile?

No

16.

Is epoxy grout to be installed with PCT 4?

No

17.

Are there any mud beds in the project?

No.

18.

The Finish Schedule notes that ceramic wall tile is to be installed with a 1/3 offset. The interior

elevations on page 220 indicate it to b straight laid. Which is correct?

Use the 1/3 offset. The interior elevation will be adjusted accordingly.

19.

Can you identify the exact columns and locations that is to be wrapped with PCT4?

PCT 4 is at columns F.5/0.9 and G/0.9. See detail

20.

In specification section 05 40 00 Cold-Formed Metal Framing, are connections to be welded?

What is the intent of the delegated design engineer?

Cold-formed metal framing connections shall be standard mechanical fastener connections

not welded. The CFMF shops submittal shall be signed and sealed by a state of Louisiana

professional engineer. This requirement confirms that all CFMF components are engineered

to the project specific requirements. The architect and engineer have performed no

preliminary or final sizes of CMFM, aside from stud depth and spacing for coordination with

other work.

21.

Are the Unit prices to be reflected in the base bids?

Yes.

(5)

PAGE|4

SPECIFICATIONS:

Specification Section

Name Comment

00 41 00 Unit Price Form Added to the Unit Price Form, line 31 63 29, for unit prices for Drilled Concrete Piers and Shafts. 01 60 00 Product Requirements Section 2.03 Product Options, Paragraph D, omit the words “no options or substitutions allowed.”

CONSTRUCTION DRAWINGS:

A copy of the Construction Drawings for Addendum No. 2 can be downloaded from the following link:

https://kaim.egnyte.com/dl/FxJH2OBtjK

Drawing

Sheet Name

Comment 1 – CIVIL

002 Notes & Details

Under Temporary Erosion Control Plan Notes, added Note 1, and renumbered the remaining notes.

003A Existing Drainage Maps

Added the words “TO REMAIN” to 18” RCP note at east drive.

003B Proposed Drainage Maps

Added the words “TO REMAIN” to 18” RCP note at east drive.

004 Demolition Pan

Added the words “TO REMAIN” to 18” RCP note at east drive.

005 Drainage & Pavement Plan

Added the words “TO REMAIN” to 18” RCP note at east drive.

006 Utilities Plan

Removed notes to cap water lines near the new building. Added Aquashield enclosure at 6” backflow preventer. Added size of water meter, backflow preventer and enclosure notes at the 2.5W water line. Added note for Contractor to coordinate utilities.

007.1 Project Dimension Plan Added dimensions and revised curb cut. 008 Temporary Erosion Control Plan

Added hay bale and silt fence by North retention basin.

2 – LANDSCAPE

L100 Landscape Site Plan New Sheet Added L102 Landscape Details New Sheet Added 4 - ARCHITECTURAL SITE

(6)

A101 Site Details

Revised the Enlarged Gate Detail and added a Tree Protection detail, revised the cast stone cap on the Dumpster Wall Section.

5 – ARCHITECTURAL

A110 Overall Floor Plan Added dimensions for clarification.

A130 Roof Plan Revised canopy roof drains

A210 Enlarged Floor Plan- A

Added wall tags, adjusted electrical and power outlets,

A211 Enlarged Floor Plan- B

Corrected door numbers, added vinyl floor transitions, misc coordination.

A220 Enlarged Toilet Plans Adjusted ceramic tile pattern on interior elevations. A401 Exterior Elevations

Added vertical dimensions, added spandrel glass, adjusted locations of control joints.

A500 Building Sections Adjusted front canopy.

A600 Wall Sections Canopy detail clarification, added notes A602 Wall Sections Canopy detail clarification

A603 Wall Sections Vestibule framing clarification A700 Wall Section Details

Added notes to details, added Cast Stone Trim Detail.

A701 Enlarged Canopy Details Adjusted canopy roof details A710 Floor Plan Details Amended details, omit detail 3. A711 Floor Plan Details

Details 2, 4, 5, 6, updated detail. Added new details 3 and 7.

A720 Interior Construction Details Updated ceiling construction detail. A900 Room Schedules & Wall Types Added ceiling finish to Room Schedule A910 Door Schedules and Details

Coordinated door types, clarified tempered glazing locations.

A920 Window & Storefront Schedules

Revised dimensions, added elevations Type K.1 and K.2.

A921 Window & Door Details Clarified canopy connection detail 12 - STRUCTURAL

S201 Foundation Plan Added and coordinated dimensions.

S202 Roof Framing Plan

Adjusted and coordinated dimensions, called out steel sizes at front canopy and clarified location of low HSS tube, added two detail reference markers.

S510 Roof Framing Details

Detail 15, revised brick angle connection to vertical tube steel, added detail 17, hanger detail for exam light.

S511 Roof Framing Details

Sections 1 and 2, revised steel roof deck and framing

14 - MECHANICAL

M0.01 Mechanical Symbols & Legends Added sheet to Mechanical Sheet Index

M2.01 Mechanical Level 1 Plan

Adjusted ductwork to accommodate electrical access to fan coil boxes, added supply and return grills to corridors, adjusted size of sound boots.

(7)

PAGE|6

M2.02 Mechanical Roof Plan Called out location of exhaust duct.

M8.01 Mechanical Schedules

Added sidewall return brill to Air Device Schedule and added TU-2 to Single Duct Terminal Box Schedule. Adjusted fan speed in Fan Powered Terminal Unit Schedule

M9.02 Mechanical Details New Sheet 15 - PLUMBING

P2.01 Plumbing Level 1 Plan Added cold water lines to refrigerator boxes. P8.01 Plumbing Schedules Changed mounting of hot water heaters. P9.01 Plumbing Details Revised detail 6, added details 10 and 11. 16 - ELECTRICAL

E1.01 Electrical Site Plan Indicated conduit to light poles

E1.02 Electrical Roof Plan Added J-box and circuit for building mounted signs E2.01 Lighting Level 1 Plan Indicated lights to remain as a night light

E3.01 Power Level 1 Plan Added and revised Keyed Notes

E4.01 Equipment Power Plan Updated power locations to mechanical boxes E5.01 Electrical Special Systems Added devices

E7.01 Electrical One-Line Diagram Called out wire and conduit sizes E8.02 Electrical Schedules Changed circuits

(8)

_________________________________________ _________________________________________ (Owner to provide name and address of owner)

___________________________________________ ___________________________________________ (Owner to provide name of project and other identifying information)

The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by:

and dated: (Owner to provide name of entity preparing bidding documents.)

Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the

Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________ .

TOTAL BASE BID

:

For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid” * but not alternates) the sum of:

Dollars ($ )

ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.

Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

Dollars ($ )

Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

Dollars ($ )

Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct)for the lump sum of:

Dollars ($ )

NAME OF BIDDER: ADDRESS OF BIDDER:

LOUISIANA CONTRACTOR’S LICENSE NUMBER: NAME OF AUTHORIZED SIGNATORY OF BIDDER: TITLE OF AUTHORIZED SIGNATORY OF BIDDER:

SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **: DATE: _______________________

THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA

UNIFORM PUBLIC WORK BID FORM

:

* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.

** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public

Kinder, Louisiana 70648 108 Sixth Avenue

Kinder, Louisiana 70648

Kaim Associates, Inc., all

disciplines unless noted otherwise

Bluewing Consulting, LLC, civil engineering November 11, 2020.

Omit indicated masonry veneer and add stucco.

Omit natural gas generator and add diesel fuel generator.

(9)

LOUISIANA UNIFORM PUBLIC WORK BID FORM

UNIT PRICE FORM

TO: BID FOR:

(Owner to provide name and address of owner) (Owner to provide name of project and other identifying information)

UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

DESCRIPTION:  Base Bid or  Alt.# ___

REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)

Wording for “DESCRIPTION” is to be provided by the Owner. Allen Parish Hospital

108 Sixth Avenue Kinder, Louisiana 70648

Allen Parish Hospital Rural Health Clinic 108 Sixth Avenue Kinder, Louisiana 70648

04 20 01

04 73 00

09 05 61

Refer to Section 01 21 00 Allowances X

X

X

References

Related documents

The level of illumination of the exit sign shall be at the levels provided in accordance with 5-10.3.2 or 5-10.3.3 for the required emergency lighting time duration as specified

Grab your booking forms more help but as other things; therefore we decree a word and it shall be established, and you speak the lord, and mind of the rolls, i am healed me.. You

• Gross domestic product: total market value of all final goods and services produced in a given year.. • To avoid double counting, intermediate goods are

The Proposer’s proposal shall include those prices necessary to cover the cost of all items required to perform the work as set forth in the RFP documents.. No allowance of any kind

(iv) The number of multiplications and additions for the equivalent quaternion operation will depend upon the form which one uses for the quaternion vector rotation... It is easiest

Historically, the Dielectric Test has been used to determine the condition of transformer oil under the assumption that if it had a high dielectric withstand voltage it had to be

Instructions for Florida Supreme Court Approved Family Law Form 12.980(i) Motion for Extension of Injunction for Protection Against Domestic Violence, Repeat Violence, Dating

Any construction related damages that took place as a result, shall be repaired or removed and replaced at the same contract unit prices and shall be paid out of the contingency..